Project scope shall include the construction of a duplex lift station including 6-foot diameter pre-cast wet well, two (2) 175 gpm submersible pumps, and all associated piping, valves and fittings, electrical controls, and site work.
Pre-bid meeting: October 13, 2026 at 2:30 PM (Chicago) — EHRA via Zoom — Non-Mandatory Pre Bid
Bid opening: October 20, 2026 at 2:30 PM (Chicago) — EHRA & via Zoom — Electronically or Sealed Bids in duplicate
Questions asked: 2
It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and/or Bid Amounts.
Bid documents (download requires a free CivCast account):
Project scope includes construction of a duplex lift station including 6-foot diameter pre-cast wet well, two (2) 175 gpm submersible pumps, and all associated piping, valves and fittings, electrical controls, and site work.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>No estimated project cost or cost range will be provided.</p>""230c6b5d-120e-400d-bdb1-52ee60c35877""2026-10-02T17:38:44.711Z"false"<p>Yes, technical specifications uploaded. </p>""dc850702-4081-45d1-b38e-618a166a4576""2026-10-02T17:39:17.988Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6abc36bdd55fed4ddb4499bd), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.