Project scope shall include the installation of approximately 15,550 SY of reinforced concrete pavement.
Pre-bid meeting: n/a
Bid opening: October 15, 2026 at 2:30 PM (Chicago) — EHRA and Zoom — Sealed bids in duplicate or electronically via CivCast
Questions asked: 7
Bid Open Zoom Info.: EHRA CPS is inviting you to a scheduled Zoom meeting. Topic: Bid Open: Crosby Farms, Sec. 6 and Sec. 8 - Paving Time: Sep 10, 2026 02:30 PM Central Time (US and Canada) Join Zoom Meeting https://us06web.zoom.us/j/86543176810?pwd=HCFECUpVfs7ELmR95Tr63O3XTlqeNH.1 Meeting chat link https://us06web.zoom.us/launch/jc/86543176810 View meeting insights https://us06web.zoom.us/launch/edl?muid=4e368a29-0445-4778-a61a-5da436d1b831 Meeting ID: 865 4317 6810 Passcode: 777875 --- One tap mobile +13462487799,,86543176810#,,,,*777875# US (Houston) +12532050468,,86543176810#,,,,*777875# US --- Join by SIP • 86543176810@zoomcrc.com Join instructions https://us06web.zoom.us/meetings/86543176810/invitations?signature=XvAsrM0yIslj5bBHQR1L7O7dPau9wEln030cKVOsenM
It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and/or Bid Amounts.
Bid documents (download requires a free CivCast account):
Project scope shall include the installation of approximately 15,550 SY of reinforced concrete pavement.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>No, CAD files are not released during bid phase.</p>""67cf4318-f50a-4289-9a29-c64062f75ac1""2026-08-07T17:45:22.065Z"false"<p>There is not an estimated cost.</p>""16cb5fcd-ac53-4a09-bf57-ca990a7f0379""2026-09-02T13:48:45.336Z"false"<p>Not until November, there will be an addendum being issued pushing the bid date to October.</p>""00450c02-c62f-4cfa-a86d-0b19d294e7f6""2026-09-02T13:49:03.587Z"false"<p>The one that bids on 9/15 is for the utilities. The one that bids on 10/15 is for the paving. There will be another addendum issued for the paving portion that will make section 8 additional items, the same way the bid proposal is for the utility portion. If you look at the project names, one says water, wastewater, etc. and one says paving. The one that is bidding on 9/15 is a rebid.</p>""8c96fef4-6012-4eeb-9b9a-a66473826a62""2026-09-09T14:20:49.472Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a6ce70dbf388c654b23808a), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.