DOCUMENT001113 CCSD CLARK COUNTY ADVERTISEMENTFORBIDS SCHOOLDISTRICT Pursuant NRS 338.1385, bids will be received at the Clark County School Contract, Procurement and Compliance, 1180Military Tribute Place,Henderson,NV 89074 untilThursday,November 5,2026 at 10:00AMvia Google Meet, through the E-Builder bidding module and read aloud publicly for the furnishing of all labor and materials to perform theWork in conjunction with the construction of: Build ShadeStructure OverVarious Fields GREENVALLEYHIGHSCHOOL MPID#0019119,PWP#CL-2027-035 The Work consists of: Provide all labor, materials, equipment, tools, transportation, and supervision necessary for the fabrication and installation of four steel trellis shade structures improvements at Clark CountySchool District GreenValleyHighSchool in accordancewiththeprovidedplans and specifications. Scope includes installation of (1) 48'x14' baseball trellis, (1) 46'x12’ baseball trellis, (1) 54'x15’ softball trellis, and (1) 38'x15’ soccer trellis. Work includes layout, excavation, concrete footings, anchor bolts, structural steel fabrication, erection, welding, painting/coating, delivery, and installation of 4x4 HSS steel columns, 2x3 HSS beams, and 4x2 U-channel trellis slats spaced approximately 7" O.C.Contractor shall site restoration, and final cleanup.
All work shall comply with applicable building codes, OSHA requirements, CCSDstandards, and approved engineered drawings. Prequalified Bidders shall have a Nevada Contractor's License with the Classification of: A, B, AB, C-14, C-14B, C-25. The construction budget for the project is: $ 82,050.00 The Owner's representative is: (PM Celeste Harrison) or (PMA Cesar Luna), and may be reached at (PM cell (702) 460- 7265.) or (PMA cell (702) 491-3464.) Bid documents will be available o
The work consists of providing all labor, materials, equipment, tools, transportation, and supervision necessary for the fabrication and installation of four steel trellis shade structures. Scope includes installation of (1) 48'x14' baseball trellis, (1) 46'x12' baseball trellis, (1) 54'x15' softball trellis, and (1) 38'x15' soccer trellis. Work includes layout, excavation, concrete footings, anchor bolts, structural steel fabrication, erection, welding, painting/coating, delivery, and installation of 4x4 HSS steel columns, 2x3 HSS beams, and 4x2 U-channel trellis slats spaced approximately 7" O.C. Contractor shall site restoration, and final cleanup.
We post new general contractors opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Clark County School District Bids, retrieved via Clark County School District Facilities (Las Vegas, NV). View the official posting, and always confirm requirements and deadlines with the issuing agency.