This project is to construct wastewater pipe in Pino Lane near E. William Cannon Dr. The new pipe will reroute flow from a manhole in Pino Lane south to another manhole in Dove Springs Road to alleviate the capacity bottleneck. The wastewater pipe near Pino Lane has a very high risk of overflows because the existing capacity is inadequate for current wastewater flows.
The Work consists of installation of approximately 1,825 linear feet of new 6”, 8”, 15”, and
18” PVC wastewater line including bypass pumping, and new pre-cast and cast-in-place
manholes. Additionally, the Work includes approximately 1,150 linear feet of Cured-In-Place Pipe (CIPP) lining on an existing 10” concrete wastewater line. Incidental work includes
erosion and sedimentation control, pavement repair, stormwater pollution prevention plan
(SWPPP), and traffic control during construction.
Estimated Amount: $1,900,000.00
Special Notes: Compliance Plan Required.
The Work consists of installation of approximately 1,825 linear feet of new 6", 8", 15", and 18" PVC wastewater line including bypass pumping, and new pre-cast and cast-in-place manholes. Additionally, the Work includes approximately 1,150 linear feet of Cured-In-Place Pipe (CIPP) lining on an existing 10" concrete wastewater line. Incidental work includes erosion and sedimentation control, pavement repair, stormwater pollution prevention plan (SWPPP), and traffic control during construction.