For constructing the Lighting Rehabilitation on I-59 from a point near the 66th Street North Overpass to the junction of the I-459 Interchange in Birmingham. Length 5.965 mi.
County: Jefferson County, Alabama
Contract Time: 240 Working Days
Bracket Estimate: $5,695,526 to $6,961,198
Bids are received by the Alabama Department of Transportation, Office Engineer Bureau, Plans and Proposals Section. State law requires bidders to be pre-qualified with ALDOT.
The work constructs lighting rehabilitation on I-59 including mobilization and geometric controls, 266 roadway pole foundations, 266 LED 400-watt equivalent luminaire assemblies and 42 LED underpass luminaires, 9 service poles and 9 special lighting control centers, rigid metallic conduit, conductors, 85,000 LF of combined duct and cable with 2 #6 AWG and 25,000 LF with 2 #2 AWG, replacement of 108 luminaires and pole wiring cables, removal of luminaires, assemblies, foundations and underpass luminaires, plus construction signs, drums, attenuators, arrow boards, message signs, seeding, mulching and erosion controls.
We post new electrical opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alabama Department of Transportation (solicitation 20261106-CALL012), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.