For constructing the Bridge Deck Rehabilitation (Hydroblasting) on I-65 over Cedar Creek and over SR-67 north of Falkville. Length 0.147 mi.
County: Morgan County, Alabama
Contract Time: 45 Working Days
Bracket Estimate: $2,849,692 to $3,482,957
Bids are received by the Alabama Department of Transportation, Office Engineer Bureau, Plans and Proposals Section. State law requires bidders to be pre-qualified with ALDOT.
The work includes removal of old bridge (partial), steel reinforcement for bridge superstructure, bridge substructure concrete, bridge concrete superstructure, elastomeric bearings, raising portions of existing bridge, hydroblasting (5,828 SQYD), bridge deck repair with formwork, placing and finishing concrete overlay, concrete for overlay, mobilization, construction fuel (max bid limited to $100,000), solid and broken temporary traffic stripes (plastic and tape), various permanent traffic stripes, pavement markers, portable concrete safety barriers, portable impact attenuator assemblies, truck mounted impact attenuator unit, construction signs, channelizing drums, cones, portable sequential arrow and chevron sign units, and portable changeable message signs.
We post new concrete opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alabama Department of Transportation (solicitation 20261106-CALL002), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.