Read the notice and its 4 attached documents and pull out the scope, the deadlines and what you have to submit.
The proposed project is located in Coconino County along Brewer Road in the City of Sedona. The proposed work consists of removing existing concrete sidewalk and driveways and constructing new concrete sidewalk, driveways, and decomposed granite paths. The work also includes installing drainage improvements, sidewalk ramps, retaining walls, metal handrail, scuppers, fence, curb, curb and gutter, signs, pavement markings, utility adjustments and relocations, and other related work.
District: SouthCent District
Item # 104245
Route/County/MP: 00000 CN SED
TRACS: T053701C
Project: SED-0-(203)T
Type of work: System Enhancement (Engineering)
Pre-qualification: YES
Plans status: Available
Plan holders (5 pamphlet, 9 non-bid-set): TECHNOLOGY CONSTRUCTION, INC.; VASTCO, INC.; J. BANICKI CONSTRUCTION, INC.; COMBS CONSTRUCTION COMPANY, LLC.; WHELCON CONTRACTORS, LLC.; Envy Dirt Worx, LLC.; MOLINA CONTRACTING INC.; ATL-CMT; IRON KING METAL WORKS, LLC; KW CONSTRUCTION; WINWATER OF PHOENIX (WinSupply); CANYON STATE BARRICADE SERVICES, LLC; …
We post new asphalt opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arizona work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arizona Department of Transportation (solicitation 2026038-T053701C), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.