Light RFP
← All government bids
Federal · SAM.gov · Rosebud, SD

Rosebud Lift Station Construction

Due Jul 20, 2026·21 days left·Plumbing, ElevatorView official posting ↗
Issuing agency
Department of Health and Human Services
Method
Solicitation
Category
Construction · NAICS 237110
PIN
75H70126R00030
Location
Rosebud, SD
Posted
Jun 18, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC.

  1. The purpose of this solicitation amendment A02 is to:

a. Update the pump requirements.

  1. Attachment J03 Tech Specs RLSC, paragraph 2.4 Sewage Pumps, F. Pump Performance Requirements is amended as follows:
  • Item 1. Capacity is changed from 95 gpm to 125 GPM .

  • Item 3. Total Dynamic head is changed from 63 feet to 80 feet .

  1. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for

acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.

  1. All other terms and conditions remain unchanged.

Amendment 1: Add attachment J03a Plans RLSC and the corresponding SF-30.


Request For Proposals (RFP)

Rosebud Lift Station Construction

75H70126R00030

Set-Aside: Total Small Business set-aside.

Product Service Code: Y1ND - Construction of Sewage And Waste Facilities

NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction

  • Size Stdr: $45 million

Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd

POP: 240 calendar days

Construction Magnitude: Between $500,000 and $1,000,000

Contract Type: firm-fixed-priced

TERO: TERO is applicable. See Section H.50.

Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow.

A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.

This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.

Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.

Primary Point of Contact:

Alternative Point of Contact: (Please don't add unless the primary is unavailable.)

Attachments: Refer to the Attachments section.

Documents13
A02 Pump Specs RLSC.pdfPDF
A01 Add Attachment RLSC.pdfPDF
J03a Plans RLSC.pdfPDF
J03 Tech Specs RLSC.pdfPDF
B01 RFP RLSC 75H70126R00030.pdfPDF
Optional Company Specialized Experience Form.pdfPDF
J06 WH-347 Payrolls Exp 31Jan2028.pdfPDF
Optional Past Performance Questionnaire.docxDOCX
J04 Wage Det SD20260018 18May2026.pdfPDF
J05 Self Performed Calculation Sheet.docxDOCX
J01 SOW Rosebud Lift Station Construction.docxDOCX
J07 Release of Claims.docxDOCX
J02 Block 17 Support Schedule RLSC.docxDOCX

Contact

Name
Daniel Cotto
Phone
2404617841
Address
Rosebud, SD 57570
Full source recordfrom SAM.gov
Type
Solicitation
Title
Rosebud Lift Station Construction
Active
Yes
Base Type
Solicitation
Notice Id
9ce38605d9814c079e2dce41a983a7b2
Naics Code
237110
Department
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Posted Date
Jun 18, 2026
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3d41a6ea607f4b6bbc3ba02ce94bed79/download?fn=A02%20Pump%20Specs%20RLSC.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/47476fd99e0a48ed908e3fc3e7e16c4a/download?fn=A01%20Add%20Attachment%20RLSC.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/89897159089a47cfa6255555c6114bfd/download?fn=J03a%20Plans%20RLSC.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c3f5ca3b1c7a42c48690e4e04d7076a1/download?fn=J03%20Tech%20Specs%20RLSC.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8b878eac1e5940019cc28a0ba9aba99d/download?fn=B01%20RFP%20RLSC%2075H70126R00030.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/355d81ad99134427982982175ec79ef7/download?fn=Optional%20Company%20Specialized%20Experience%20Form.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0836cb9e8a5f4d7097ddda39628c9c8e/download?fn=J06%20WH-347%20Payrolls%20Exp%2031Jan2028.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c0b08e4ff27946728883d87b469708ea/download?fn=Optional%20Past%20Performance%20Questionnaire.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/50064ddc44ae42218050d4326e72eb3b/download?fn=J04%20Wage%20Det%20SD20260018%2018May2026.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2fca54cfd5ab4a50a94a71fdaefcd171/download?fn=J05%20Self%20Performed%20Calculation%20Sheet.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b2ca97231d3245e0ab23da2d07edf8f0/download?fn=J01%20SOW%20Rosebud%20Lift%20Station%20Construction.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5d159789fa9e4425ad374f820f182720/download?fn=J07%20Release%20of%20Claims.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/657331fa56cb480b866179247684dcf0/download?fn=J02%20Block%2017%20Support%20Schedule%20RLSC.docx
Point Of Contact
Type
primary
Email
daniel.cotto@ihs.gov
Phone
2404617841
Full Name
Daniel Cotto
Type
secondary
Email
andrew.hart@ihs.gov
Phone
2063754443
Full Name
Andrew E. Hart
Description Text
Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC. 1. The purpose of this solicitation amendment A02 is to: a. Update the pump requirements. 2. Attachment J03 Tech Specs RLSC, paragraph 2.4 Sewage Pumps, F. Pump Performance Requirements is amended as follows: - Item 1. Capacity is changed from 95 gpm to 125 GPM . - Item 3. Total Dynamic head is changed from 63 feet to 80 feet . 3. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442. 4. All other terms and conditions remain unchanged. ---------------------------------------------------------------------------- Amendment 1: Add attachment J03a Plans RLSC and the corresponding SF-30. ---------------------------------------------------------------------------- Request For Proposals (RFP) Rosebud Lift Station Construction 75H70126R00030 Set-Aside: Total Small Business set-aside. Product Service Code: Y1ND - Construction of Sewage And Waste Facilities NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction - Size Stdr: $45 million Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd POP: 240 calendar days Construction Magnitude: Between $500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See Section H.50. Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system. Primary Point of Contact: - Daniel Cotto - Email: daniel.cotto@ihs.gov - Phone Number: 2404617841 Alternative Point of Contact: (Please don't add unless the primary is unavailable.) - Andrew E. Hart - Email: andrew.hart@ihs.gov - Phone Number: 206-375-4443 Attachments: Refer to the Attachments section.
Response Dead Line
Jul 20, 2026
Full Parent Path Name
DEPARTMENT OF HEALTH AND HUMAN SERVICES.INDIAN HEALTH SERVICE.DIV OF ENGINEERING SVCS - SEATTLE
Place Of Performance
Zip
57570
City
Code
55900
Name
Rosebud
State
Code
SD
Name
South Dakota
Country
Code
USA
Name
UNITED STATES
Solicitation Number
75H70126R00030

Source: SAM.gov (notice 9ce38605d9814c079e2dce41a983a7b2), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.