Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC.
a. Update the pump requirements.
Item 1. Capacity is changed from 95 gpm to 125 GPM .
Item 3. Total Dynamic head is changed from 63 feet to 80 feet .
acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.
Amendment 1: Add attachment J03a Plans RLSC and the corresponding SF-30.
Request For Proposals (RFP)
Rosebud Lift Station Construction
75H70126R00030
Set-Aside: Total Small Business set-aside.
Product Service Code: Y1ND - Construction of Sewage And Waste Facilities
NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction
Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd
POP: 240 calendar days
Construction Magnitude: Between $500,000 and $1,000,000
Contract Type: firm-fixed-priced
TERO: TERO is applicable. See Section H.50.
Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow.
A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.
This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.
Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.
Primary Point of Contact:
Daniel Cotto
Email: daniel.cotto@ihs.gov
Phone Number: 2404617841
Alternative Point of Contact: (Please don't add unless the primary is unavailable.)
Andrew E. Hart
Email: andrew.hart@ihs.gov
Phone Number: 206-375-4443
Attachments: Refer to the Attachments section.
Source: SAM.gov (notice 9ce38605d9814c079e2dce41a983a7b2), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →