The solicitation will be a fixed-price time charter, with a performance period of one (1) year base period and will be followed by three (3) 1-year options and one (1) 11-month option period. The solicitation will require the time charter of one (1) Jones Act qualified, U.S. flag, Offshore Supply Vessel (OSV) to support submarine rescue requirements in support of submarine sea trials and other Fleet mission support as required, in the vicinity of Hampton Roads Area in Virginia. Anticipated lay days: 18 February - 28 March 2027. Please see attached Request for Proposal (RFP) N3220526R6077 and all RFP attachments for full details.
**Administrative Note: This solicitation (RFP) is being issued to correct an administrative error on a previous posting. On 19 August 2026, this requirement was mistakenly published under Notice Type "Sources Sought" under Notice ID N3220526R6077. Please note that this is an active Request for Proposal (RFP) and not a request for information. All formal proposals must be submitted in accordance with the instructions detailed in this solicitation. The original "Sources Sought" posting is considered administratively closed. **
Please see attachment N3220526R6077 - Amendment 0001 which corrects the laydays in Attachment (1) SPECIALTIME Proforma. Amendment 0001 is efffective 21 August 2026. The Offer Due Date/Local Time has NOT been extended.
Please see attachment N3220526R6077 - Amendment 0002 which updates Attachment (01) SPECIALTIME Proforma, Attachment (05) Government Furnished Property, and answers questions in response to the RFP. Amendment 0002 is efffective 08 September 2026. The Offer Due Date/Local Time has NOT been extended.
The contractor must provide a vessel capable of installing the NATO Submarine Rescue System (NSRS) and Submarine Rescue Diving Recompression System (SRDRS) (not simultaneously) and be certified as a Submarine Rescue Vessel of Opportunity (VOO). The vessel shall support inport and underway operations on a 24-hour basis, including loading, storage, and discharge of government equipment; carry up to 31 supercargo personnel; provide DP training and certification support; and conduct launch and recovery of small craft, divers, and ROVs. The vessel must meet detailed requirements for deck space (6,000 sq ft contiguous open deck, minimum 98 ft length x 36 ft width), dynamic positioning (ABS DPS2 or greater), electrical power, CBRN defense, force protection, and crew training. The contract includes a 365-day base period plus four option periods (366, 365, 365, and 335 days).
We post new transportation & logistics opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"23511-2313""NORFOLK""VA""USA""9276 3RD AVE""BLDG LP26""N3220526R6077 Amendment 0002.pdf"584023"file"".pdf""1""2026-09-08T20:34:12.318+00:00""0d3c35ded0024252a5398716822b0aa1""public""0""public""28b9cbeac0ac4d419cf6584a423050c9""0"25"0""Attach (01) - PROFORMA - SPECIALTIME 2026 (A0002).pdf"994967"file"".pdf""1""2026-09-08T20:34:12.318+00:00""ed0093ff4e734bb78acb3c2bf1a5176e""public""0""public""55aca96829334d27b3781f3400dfc302""0"24"0""Attach (05) - Government Furnished Property (A0002).xlsx"2176076"file"".xlsx""1""2026-09-08T20:34:12.318+00:00""7668c6af39184040b08a9752e06ac37a""public""0""public""48f21363cc514a488d55e31c70847393""0"23"0""N3220526R6077 Amendment 0001.pdf"592999"file"".pdf""1""2026-08-21T19:22:11.631+00:00""10e96d0319344883b320e0b945d49f4e""public""0""public""b34247f851d043e8886d8b69cf16114f""0"22"0""Attach (01) - PROFORMA - SPECIALTIME 2026 (A0001).pdf"993790"file"".pdf""1""2026-08-21T19:22:11.631+00:00""36550451028b492fb94639ff86a77f7e""public""0""public""f8ebf745c85540ee90aabedf368aca99""0"21"0""Solicitation - N3220526R6077.pdf"1827722"file"".pdf""1""2026-08-21T18:56:17.315+00:00""2164055ef4e54f3ebe4a2ea50239b03b""public""0""public""3aa5184d9a434b5b90217b2e3ca18302""0"20"0""Attach (01) - PROFORMA - SPECIALTIME 2026.pdf"993762"file"".pdf""1""2026-08-21T18:56:17.315+00:00""993711e68de54131bffe082b22c2bdf0""public""0""public""24402454fd91451ab264aa43442b4f88""0"19"0""Attach (02) - Performance Work Statement.pdf"344620"file"".pdf""1""2026-08-21T18:56:17.315+00:00""a81195ec93ec4e9d93be341707ee162b""public""0""public""9d687c7c539142e68b213a335ef2c191""0"18"0""Attach (03) - Guidelines for Off-Hire.pdf"154711"file"".pdf""1""2026-08-21T18:56:17.315+00:00""272eefb65a5d47919d77bae7bee480ba""public""0""public""1db93be428074b3384d81be5da6ba6d9""0"17"0""Attach (04) - Wage Determination 2019-0288 Rev. 26.pdf"299627"file"".pdf""1""2026-08-21T18:56:17.315+00:00""65d6649f0c314a03bd0340406ed99748""public""0""public""d754eb7514dd411da4524b6d08fcb7c9""0"16"0""Attach (05) - Government Furnished Property.xlsx"2235236"file"".xlsx""1""2026-08-21T18:56:17.315+00:00""e23aef16da874790b93270b6196da8d2""public""0""public""e0c638b698614ae6b8ee42accdef704a""0"15"0""Attach (06) - Basic Pricing Data.xlsx"42431"file"".xlsx""1""2026-08-21T18:56:17.315+00:00""43cc5ac54eb54ff78c59b56cc3bc5781""public""0""public""8411d98570c64c949ad40ee7d451e329""0"14"0""Attach (07) - Crew Complement.docx"59354"file"".docx""1""2026-08-21T18:56:17.315+00:00""78462527ca2a4591b5ee003770367c57""public""0""public""ddb708447cee42a49bdd0d8ad05994b6""0"13"0""Attach (09) - ATFP.pdf"286713"file"".pdf""1""2026-08-21T18:56:17.315+00:00""cf8a539b2e0f418ba2edb851cb8b7084""public""0""public""e5180ae2a25d478ea39be20317c3b6d9""0"12"0""Attach (10) - CBRN Requirements.pdf"253684"file"".pdf""1""2026-08-21T18:56:17.315+00:00""0167e8fedf3f4beea9655dabbbff6edf""public""0""public""fb6661b9bfa5449bbec15c0bfeceb179""0"11"0""Attach (11-1) - Specs Decon Station (CRBD).pdf"204347"file"".pdf""1""2026-08-21T18:56:17.315+00:00""1b75e424f6024a6d849ac21dadee1bf6""public""0""public""6242e9e687874f8d963a1667f07878bd""0"10"0""Attach (11-2) - CBRN Decon Stat DWG.pdf"410841"file"".pdf""1""2026-08-21T18:56:17.315+00:00""269726cab13245e18d6bca470d570c8b""public""0""public""986269ab2fa54bae93b3e309edb08b30""0"9"0""Attach (15) - CDRL 0001.pdf"538377"file"".pdf""1""2026-08-21T18:56:17.315+00:00""86fa353ccd6442888127cd4bbcd85338""public""0""public""b56ce50c2dd848fa8dd2973b1b293d5b""0"8"0""Attach (16) - MSC SOM.pdf"1453709"file"".pdf""1""2026-08-21T18:56:17.315+00:00""4894a3a182f942e9b94e1d2391cecc50""public""0""public""24918e01ade443339345c5a4f121c4e3""0"7"0""Attach (17) - MECSP Worksheet.docx"22838"file"".docx""1""2026-08-21T18:56:17.315+00:00""70ca91f3257e42dea93218c01c3b0f81""public""0""public""dd1f38b1ecba437cb91627b50e5206e5""0"6"0""Attach (18) - SFLLL.pdf"28750"file"".pdf""1""2026-08-21T18:56:17.315+00:00""62bac25772ae4fe890389b423336c837""public""0""public""79c7c84514074e9e80e8d0ab068ca37d""0"5"0""Attach (19) - Clarification and Question Form.docx"421084"file"".docx""1""2026-08-21T18:56:17.315+00:00""817b9e793d75459d8a4c83da7a8bd36e""public""0""public""480725b5a8bd4851a4bd1d8ae7e0f0b3""0"4"0""Attach (20) - Technical Offer Worksheet.xlsx"22644"file"".xlsx""1""2026-08-21T18:56:17.315+00:00""f09bf5f696bc4481a9ea997aa6e7e649""public""0""public""01531b97719e457eaccd3c4a30e41e98""0"3"0""Attach (22) - Shipyard Data Info Template.xlsx"21716"file"".xlsx""1""2026-08-21T18:56:17.315+00:00""678f8192f68a4a5eb24d9974debc1eef""public""0""public""044a87725ed84e919c4f53d46bc4805b""0"2"0""Attach (24) - MOSHIP_Criteria_Manual_for_USN_SubRescue_Rev_E.pdf"650490"file"".pdf""1""2026-08-21T18:56:17.315+00:00""fcc11f28afca49bd8043f59f77276eed""public""0""public""43ff13cae96b4f5aab15bd5b4ad61c68""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 9c62f2d93eb746f598f8e70f65348a31), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.