Statement of Work (SOW)
Project Title: Dock and Dock Plate Replacement – Buildings 14 & 15
Facility: Salem VA Medical Center (VAMC)
Date: May 14, 2026
1. Scope of Work
The contractor shall furnish all labor, materials, equipment, and supervision required to remove and replace existing dock plates and perform associated concrete and structural work at Buildings 14 and 15, Salem VAMC. All work shall comply with VA standards, local building codes, and OSHA safety requirements.
2. Description of Work
Building 14
Remove existing dock plate.
Sawcut and remove approximately 14 ft × 50 ft of asphalt.
Remove approximately 50 ft of existing curb.
Excavate for new footing at existing dock wall to extend dock area.
Form and pour new 4 ft × 1 ft × 14 ft retaining wall with 4×4 steel angle on edge.
Form and pour new 6 in × 18 in × 50 ft curb.
Form and pour new concrete drive (14 ft × 50 ft × 6 in), sloped to allow trucks to back up level with dock.
Extend existing handrail by 2 ft.
Install new 4 in × 10 in × 14 in rubber dock bumpers.
Building 15
Remove existing pit leveler and associated equipment.
Infill existing pit with #57 gravel.
Sawcut back of pit at cantilever.
Pour new 4 in concrete slab pinned to existing foundation.
Install new 4 in × 4 in pit leveler frame and pour concrete perimeter.
Install new 6 ft × 8 ft hydraulic pit leveler and 4 in × 10 in × 14 in dock bumpers.
3. Performance Standards
All work shall:
Meet VA design and construction standards.
Comply with Applicable Sections of the VA Electrical, Structural, and Safety Guidelines.
Be executed following OSHA safety practices.
Be completed per approved construction drawings and specifications.
Ensure new concrete and metal installations are level, aligned, and finished to VA quality standards.
4. Schedule and Coordination
Work schedule shall be coordinated with the VA Engineering Service prior to mobilization.
Contractor shall provide a minimum 48-hour work notice for any activity affecting operations.
Access to work areas shall be limited to authorized personnel only.
5. Safety and Environmental Requirements
The contractor shall maintain a safe work environment at all times.
All waste materials shall be removed and disposed of in accordance with EPA and local regulations.
Contractor shall ensure dust control and minimal disruption to medical center operations.
6. Inspection and Acceptance
All work will be inspected by the VA contracting officer’s representative (COR).
Final acceptance will occur after successful inspection and demonstration of functionality of all installed components.
Period of Performance is 120 days from issuance of Notice to Proceed (NTP).
The contractor shall furnish all labor, materials, equipment, and supervision to remove the existing dock leveler and associated equipment, infill the existing pit with #57 gravel, sawcut the back of the pit, pour a new 4-inch concrete slab pinned to the existing foundation, install a new 4-inch by 4-inch pit leveler frame and pour concrete perimeter, and install a new 6 ft by 8 ft hydraulic pit leveler and dock bumpers. The work also includes installing a new electric-hydraulic leveler (basis of design: Vestil EH-76-20) with electrical connections, and all work must comply with VA standards, local building codes, and OSHA safety requirements.
We post new concrete opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""INSTRUCTIONS TO OFFERORS 9.3.2026.pdf"132690"file"".pdf""1""2026-09-03T19:39:49.509+00:00""1d3d6cd01db340098b1ced53d1fb3665""public""0""public""91ee218d0ec44efc8177ffe310f73192""0"11"0""S06-Dock and Deck Plate Repair-36C24626Q0889 0003.pdf"111329"file"".pdf""1""2026-09-03T19:39:49.509+00:00""e919e08e8c144448910f2486c5015eea""public""0""public""caebf8001e754f7d8e38645354d254d2""0"10"0""S05-RFI Questions-Dock and Deck Plate Repair- 9.3.2026.pdf"170880"file"".pdf""1""2026-09-03T18:56:52.736+00:00""7df932033c264d76890b34bd8aad86df""public""0""public""4463e134aafa49ff8cc7eef809ed9efc""0"9"0""P09-SOW Dock and Deck Plates- Revised 9.3.26.pdf"142500"file"".pdf""1""2026-09-03T18:56:52.736+00:00""346f43db5ae94d67b636adfea9285b5c""public""0""public""0c1a471daf304e48809d303f7b6692c2""0"8"0""Drawing SS102.pdf"65485"file"".pdf""1""2026-09-03T18:56:52.736+00:00""6704da1b5a094b70a12aa2e4531324f1""public""0""public""1288ea0b485147c78b53f4c4323194f9""0"7"0""Drawing SS101.pdf"72282"file"".pdf""1""2026-09-03T18:56:52.736+00:00""ff074fc54eec42aaac31e71da1e5315a""public""0""public""ad6714d6571f4d1c835f5703bf27803c""0"6"0""S06-Dock and Deck Plate Repair-36C24626Q0889 0002.pdf"113515"file"".pdf""1""2026-09-03T18:56:52.736+00:00""abfdd8f3d4304d0bb7db2fb42fe9c8f9""public""0""public""e6de04a31c5647d7ae648f2f8402eb00""0"5"0""S04-Dock and Deck Plate Repair- Site Visit Sign-In Sheet.pdf"170348"file"".pdf""1""2026-09-02T20:05:04.631+00:00""7ea0b9b46130463982adeca0e2853c2c""public""0""public""558f24575fb44181bfb0ab15caba7895""0"4"0""S06-Dock and Deck Plate Repair-36C24626Q0889 0001.pdf"113785"file"".pdf""1""2026-09-02T20:05:04.631+00:00""fd25c120f2f9424d834efbabeb377333""public""0""public""6f4f7e7d68c2466b8c80863384c16fa6""0"3"0""P07-Wage Determination-8.7.26.pdf"38820"file"".pdf""1""2026-08-17T20:07:20.808+00:00""2731b1788eec4ed6a04764ee4ccf7b64""public""0""public""e2d02b10c4814f2d94b2ec3e806d10f8""0"2"0""S02-36C24626Q0889- Dock and Deck Plate Repair 8.17.26.pdf"579247"file"".pdf""1""2026-08-17T20:07:20.808+00:00""ba740f383a3d40bf87897d870811d2b5""public""0""public""3d9f44fd8e3449afb2e77afcec21c0e2""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 9bc2f062930e407393b0026bb01e2735), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.