For a description of Amendment 02, please see attached PDF "Amendment 02 AOI N6247326R0072 - OTA 1 MCB Camp Pendleton".
The selected vendor(s) will be responsible for the design, manufacturing, logistics, construction, and commissioning of ten Bachelor Enlisted Quarters (BEQ) buildings totaling approximately 655,957 square feet at MCB Camp Pendleton, CA. The work includes four BEQs of 401 rooms each (253,382 SF), three BEQs of 261 rooms each (174,470 SF), and three BEQs of 361 rooms each (228,105 SF), all as Repair By Replacement including demolition of existing structures. The project requires Type II construction and must utilize industrialized construction methodologies such as volumetric modular, hybrid, or Kit of Parts, with the goal of reducing design and construction costs by 20% or more and accelerating delivery timelines by 30% or more compared to traditional commercial construction.
We post new general contractors opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20374-5065""WASHINGTON""DC""USA""WASHINGTON NAVY YARD""1322 PATTERSON AVE SE STE 1000""Amendment 02 AOI N6247326R0072 - OTA 1 MCB Camp Pendleton.pdf"310839"file"".pdf""1""2026-09-11T14:10:48.965+00:00""54697098320848e695abe6d20d18efd2""public""0""public""8813952cb9c44cb3a25bfd33279cf1e4""0"5"0""Revised AOI N6247326R0072 - OTA 1 MCB Camp Pendleton 11 Sept 26.pdf"191478"file"".pdf""1""2026-09-11T14:10:48.965+00:00""f0bb9b7457474332a3399158b79e0aa6""public""0""public""81ae998bce9643d088507af0320ab7be""0"4"0""Amendment 01 AOI N6247326R0072 - OTA 1 MCB Camp Pendleton.pdf"96536"file"".pdf""1""2026-09-04T19:11:31.755+00:00""e2c5461013214e438f33fa95c5429e91""public""0""public""d4a66b95b4a64638bc7300392652b958""0"2"0""AOI N6247326R0072 - OTA 1 MCB Camp Pendleton.pdf"190052"file"".pdf""1""2026-08-28T13:33:44.502+00:00""ac6008085eb54e7983c7f119b27f6936""public""0""public""3bfb2d42d0484668b3d2f3d259340c47""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 9b33303c1a78498aa22d7ef6a27d207f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.