Multi-turn valve actuator, stem, and pedestal
Amendment 0001 posted
Amendment 0002 posted
Amendment 0003 posted
The contractor must furnish and deliver one (1) multi-turn valve actuator, one (1) rising stem, two (2) stem guides, one (1) stem cover, and one (1) pedestal complete with all necessary accessories and appurtenances, as shown on the contract drawings and specified. The contractor must also provide one (1) included and one (1) spare stem lift nut, both threaded to match the stem. The actuator must meet AWWA C542, be from a manufacturer with at least ten years of experience, and produce the working load plus 20% reserve capacity. The stem must be fabricated from solid stainless steel (Type 304 or 316) with double-lead ACME threads per ASME B1.5. The pedestal must meet or exceed the strength requirements of EM 1110-2-2610 for tension, compression, and buckling, with a minimum safety factor of 5 applied to the actuator's rated load. The contractor must submit various submittals including shop drawings, design data, test reports, and certificates. Installation of all components will be performed by the Government.
"55101-1678""SAINT PAUL""MN""USA""KO CONTRACTING DIVISION""332 MINNESOTA STREET SUITE 1500""Amendment 0003 QnA memo.pdf"282630"file"".pdf""1""2026-10-02T17:48:51.297+00:00""b3af781945254c8c8e16b0cd00ebee22""public""0""public""380463068c19411baefe8096d5f79f56""0"8"0""Amendment 0003 SF 30.pdf"3995446"file"".pdf""1""2026-10-02T17:48:51.297+00:00""a994b18edff14033bae151b0ebebd4fb""public""0""public""0e5a41f9ac02455db31d8c05d84cba19""0"7"0""26QA004 Amendment 0002 SF 30.pdf"4044170"file"".pdf""1""2026-09-24T23:00:53.393+00:00""33c1243bc3ed49c9ba7189e0a6d60531""public""0""public""4706b84127954492a657c1d64cc410e8""0"6"0""26QA004_Attachment_3___Lift_Force_Calculations.pdf"902460"file"".pdf""1""2026-09-22T21:25:56.558+00:00""a1610a145ce24650aa08cfed5f501e07""public""0""public""331522aa925a4af298e170041edff2d7""0"5"0""26QA004 Amendment 0001 Attachment 2 Drawing (revised) Chippewa M-001.pdf"557639"file"".pdf""1""2026-09-22T21:25:56.558+00:00""b80773fc73b24d108ed19bb079dfbcfa""public""0""public""8087f266f5c842a9aedb110cf100c9b1""0"4"0""26QA004_Attachment_1___Drawing___Chippewa_Low_Flow_Gate_Assembly.pdf"60053"file"".pdf""1""2026-09-22T21:25:56.558+00:00""1fb8a3b552bb410c8393115b30b801ef""public""0""public""0cd70585b6ca4db78bb9a053572da80d""0"3"0""26QA004 Amendment 0001 SF 30.pdf"4079266"file"".pdf""1""2026-09-22T21:25:56.558+00:00""8df86c17784d4fef9bcc2b1d8edba4d4""public""0""public""fcb1f784dbbe4fe084e8ca12facd747f""0"2"0""26QA004 Solicitation (conformed version) - W912ES26QA0040001.pdf"3373452"file"".pdf""1""2026-09-22T21:25:56.558+00:00""d5c211a637e14baf8919a1e587061182""public""0""public""3fc45f842d284942a6f28f94ef30cec0""0"1"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912ES26QA004¬iceType=SolicitationNotice"0"link""1""2026-08-26T22:36:42.895+00:00""0b2083a286384e73a623fa0213d364ed""public""0""PIEE Solicitation Module Link for W912ES26QA004""public""12ea63c5fab344b8b189124c4d9028a5""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-08-26T22:36:42.895+00:00""7286ff4214c54fccaad9be31144a9687""public""0""Web Based Training for the PIEE Solicitation Module""public""1388bfbeef8d489cb74f96712ae949fb""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-08-26T22:36:42.895+00:00""8ada33a1547d4eac950b0e489f2f0b5d""public""0""Registration Instructions for the PIEE Solicitation Module""public""b715f2a591734e978e1b913d75b9eb8d""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-08-26T22:36:42.895+00:00""a3b6834689d7467696a023792873e2fc""public""0""Department of Defense Procurement Toolbox""public""5502dcb3564943d989a1f4b91e12c547""0"1"0"Most Minnesota work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 91f60955d39d4363918dc6cf47802fb5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.