WI UPPER MISSISSIPPI RIVER NWR Rock Landscape Restoration
Remove approximately 1800 square feet of rock landscaping, remove/replace landscape fabric, verify slope, and put rocks back.
The contractor must remove approximately 1,800 square feet of rock landscaping and retain the rock for reuse, remove and discard existing landscape fabric, remove aluminum landscape edging and retain for reuse if possible, smooth the subgrade surface to achieve a uniform 4% slope away from the building foundation, install commercial grade permeable landscape fabric/weed barrier of minimum 5 ounces (approved by the District Manager), install aluminum landscape edging (replacing damaged sections with Permaloc 1/4-inch x 4-inch or approved equivalent), and install retained rock to a minimum depth of 3 inches (using Winona River Rock for coloration if replacement rock is needed).
We post new exterior maintenance opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""22041""Falls Church""VA""USA""FWS, SAT Team 2""5275 Leesburg Pike""Sol_140FS226Q0205_Amd_0001.pdf"205814"file"".pdf""1""2026-09-30T17:27:21.266+00:00""14fb533b24ba4c9aaf49275dd55e677e""public""0""public""c9e335aa71864dc380b2b49aa67f86e2""0"6"0""Photos_Rock_Landscape_Restoration_0001.pdf"1067805"file"".pdf""1""2026-09-30T17:27:21.266+00:00""7e5b4859c1e94495874ec3783b38ac3b""public""0""public""c86b889509be448ca9472f68158858d0""0"5"0""QandA_Landscape_Restoration_0001.pdf"74028"file"".pdf""1""2026-09-30T17:27:21.266+00:00""5027dbdb7eb140fb91254b077ff0036d""public""0""public""db3ef9502fdb470eb275d2b8a74a9561""0"4"0""Sol_140FS226Q0205.pdf"358200"file"".pdf""1""2026-09-24T18:53:18.491+00:00""3dca97ac59a34e30bad61d95dc0360a6""public""0""public""f0135b65c70f457cb6465d1fa66d1d14""0"3"0""SOW_Rock_Landscape_Restoration.pdf"170871"file"".pdf""1""2026-09-24T18:53:18.491+00:00""cfd4edbb02ae4beab64410a8a2c6c212""public""0""public""00a3d14ffda548dea468daad52695239""0"2"0""Wage_Determination_2015-4943_Revision_33_2026-08-22_La_Crosse_County_Wisconsin.pdf"4289455"file"".pdf""1""2026-09-24T18:53:18.491+00:00""442af80ff2824b36b1222ba7f263745b""public""0""public""15741cb8a42f465bb99502008395881e""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9196964b5c2d46478a0c8e0fefbaf903), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.