We'll email you new goods & materials opportunities in Virginia as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Contractor shall develop a drawing package and Bill of Materials (BOM) to support habitability upgrades to the messing, berthing, stateroom, and sanitary spaces aboard TSV4 Narragansett, located at Joint Expeditionary Base Little Creek-Fort Story, Pier 1, Virginia Beach, Virginia.
The contractor shall develop a drawing package and Bill of Materials (BOM) to support habitability upgrades to the messing, berthing, stateroom, and sanitary spaces aboard TSV4 Narragansett, located at Joint Expeditionary Base Little Creek-Fort Story, Pier 1, Virginia Beach, Virginia. The contractor shall use a mandatory ship check, Government-furnished drawings, applicable technical manuals, and available technical history to verify existing shipboard conditions. The drawing package shall be vessel-wide for galley, messing, and berthing of each stateroom, and associated sanitary space, prepared in F-size NAVSEA format, depicting the arrangement, location, and configuration of applicable furniture, fixtures, appliances, and equipment. The BOM shall identify item description, quantity, proposed location, manufacturer and part number, estimated unit and/or total cost, material lead time, estimated labor-hour, and estimated schedule for procurement, delivery, and installation. The contractor shall submit a draft drawing package and draft BOM no later than 40 calendar days after contract award, and a final drawing package and BOM no later than 3:00 p.m. Eastern Time, 61 calendar days after contract award. The final deliverable shall include two electronic files and two full-size paper copies.
"23511-3392""NORFOLK""VA""USA""ATTENTION CODE 301""1968 GILBERT STREET SUITE 600""Site Visit Template Final 1.docx"30524"file"".docx""1""2026-10-15T18:12:12.157+00:00""090b060bc1514c69b251d14254c5ffc8""public""0""public""26b16c7131014685b2546fa2f1ec41bc""0"2"0""Solicitation - N0018927QL008.pdf"383129"file"".pdf""1""2026-10-15T18:12:12.157+00:00""3a394190b27b4e52bab35313e1b88b92""public""0""public""2b00a2e265794429ab2b9785db7b8c70""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8d66006275e040c0b40e1923ff60adfe), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.