Replace Flat Roof Building 57 | Project 542-26-109 Solicitation Amendment 36C24426B0013 0001
The contractor must replace the EPDM flat roofs on Building 57 stair towers (approx. 70 sqft each) and two flat roofs (approx. 242 sqft each) connected to the main sloped roof, including full removal and replacement of EPDM roofing, insulation, cants, and pitching to roof drains and gutters. Work includes replacing flashing with 16 oz. copper, resoldering copper cap seams and scuppers, rehanging gutters, installing new lightning protection, investigating and repairing concrete decking, removing abandoned equipment, raising equipment curbs to a minimum of 12 inches, and providing weather protection. Additionally, the contractor must restore the existing balustrade system at the penthouse, including repointing 100% of mortar joints, patching spalled terra cotta, power washing, and applying a mineral paint coating. The contractor must coordinate all tasks with the COR, use a crane for lifts exceeding manlift weight ratings, and ensure no debris falls from the worksite. The project must be completed within 90 days from the Notice to Proceed.
We post new roofing opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""15215""PITTSBURGH""PA""USA""1010 DELAFIELD ROAD""Addendum SOW Replace Flat Roof Bldg57.docx"4260452"file"".docx""1""2026-09-15T17:10:00.449+00:00""cf95c23fba98484a90080ef7c71ed4f0""public""0""public""3be1801589324c6fb6cf1ee42131a5fa""0"5"0""36C24426B0013 0002.docx"120869"file"".docx""1""2026-09-15T17:10:00.449+00:00""a6bcaa938bec45509bd21881048f2232""public""0""public""f14ba540797143aea9f9a018e647fd3d""0"4"0""Sol 36C24426B0013 0001.docx"23058"file"".docx""1""2026-08-21T23:41:11.714+00:00""127d55c33f3b478e949e2ed1e8589e22""public""0""public""4c9adbe4eeec486ca46dfa2211cd78f9""0"3"0""36C24426B0013 0001.docx"14472"file"".docx""1""2026-08-21T23:41:11.714+00:00""0f7ab647820b442b8a31297f9af9559f""public""0""public""c028d8a337ba4afe809a91519ac64b1e""0"2"0""36C24426B0013.docx"17998"file"".docx""1""2026-05-19T19:47:59.536+00:00""30a026de5a4a4d6b8f9144e63294dd2e""public""0""public""282b1a8a49734b9b89b095811ece28a2""0"1"0"Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8844981b86b341e98afa31d0e706a66f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.