1. SCOPE OF WORK
The Contractor shall provide all management, tools, supplies, equipment, transportation, materials, and labor necessary to provide commercial Wi-Fi service in Building 977. This includes two primary objectives:
Re-establishing Commercial Wi-Fi Service: Restoring and providing ongoing monthly commercial Wi-Fi internet service throughout the previously serviced areas of Building 977.
First-Floor Extension: Engineering, extending, and installing commercial Wi-Fi coverage to the first floor (C and D wings), including circuit testing, troubleshooting, and conducting a post-installation Heat Map to determine optimal wireless access point placement and signal coverage.
All required project documentation, technical layouts, and drawings shall be delivered in accordance with Section 3.9 and applicable Contract Data Requirements Lists (CDRLs).
2. PERIOD OF PERFORMANCE
The period of performance shall consist of a base year (12 months) and four (4) one-year optional renewal periods, for a total potential performance period of five (5) years. Continued Wi-Fi service shall be provided on a monthly recurring basis throughout the active period of performance.
3. SITE VIST (Optional):
An organized site visit will be conducted on 78150-4453 Monday, 2 November 2026 at 10:00 AM CST at: AFLCMC/GBH ; 1960 1st Street West, Building 977, Randolph AFB, TX RSVP & Base Access: All interested contractors wishing to attend must contact Contract Specialist Syedah Gordon at syedah.gordon@us.af.mil and Contracting Officer Sarah Dietel at sarah.dietel@us.af.mil no later than Wednesday, 28 October 2026 at 3:00 PM CST .
Attendees must submit the attached base access request form (Attachment 4 - Unescorted Access Request) with their RSVP to ensure base vetting is completed prior to the visit
The contractor shall provide all management, tools, supplies, equipment, transportation, materials, and labor necessary to provide commercial Wi-Fi service in Building 977. This includes re-establishing commercial Wi-Fi service throughout previously serviced areas and engineering, extending, and installing Wi-Fi coverage to the first floor (C and D wings), including circuit testing, troubleshooting, and conducting a post-installation Heat Map. The contractor must provide a dedicated 500 Mbps symmetrical circuit, 802.11ac or higher access points, and implement a DoD Captive Portal. All project documentation, technical layouts, and drawings shall be delivered in accordance with Section 3.9 and applicable CDRLs.
We post new it & software opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"78150""MAFB GUN ANNX""TX""USA""CP 334-416-5494""201 E MOORE DR BLDG 856""DOD NOTICE AND CONSENT - SHORT.pdf"49463"file"".pdf""1""2026-10-22T14:28:35.551+00:00""eddf9e98ed67480ababaee13a6b960f5""public""0""public""5506f751ca88475f8c9ac1be4daba3af""0"9"0""DOD NOTICE AND CONSENT - LONG.pdf"82491"file"".pdf""1""2026-10-22T14:28:35.551+00:00""4e8a37f0102b4c9aa082f7224e448c65""public""0""public""dd218d4045f94c489a0a198a85229ecc""0"7"0""Solicitation - FA873427QR001.pdf"572538"file"".pdf""1""2026-10-22T14:28:35.551+00:00""a080cb512406442ba7298aed5dc5a9be""public""0""public""f36ece5172894ce2bb95cb5631a1ddfe""0"6"0""Randolph CISP Bldg 977 1st-2nd Floor Plan.pptx"281168"file"".pptx""1""2026-10-22T14:28:35.551+00:00""2960f8baf7274d1e948201227950baeb""public""0""public""cf0a302235254fabb0b512ba1f7c338c""0"5"0""Special_Notes_and_Instructions_to_Quoters.pdf"119599"file"".pdf""1""2026-10-22T14:28:35.551+00:00""b15d10ec283c49beba3fbaa4f1756527""public""0""public""35a06d66c0f440bb9b58a128fffd2c90""0"4"0""CDRL 0001_Drawings and Tech Documents.pdf"55334"file"".pdf""1""2026-10-22T14:28:35.551+00:00""7fdaa55d98534e7e82cd182365f6a98a""public""0""public""d35fcae42da74395a9af583b14a3f8d6""0"3"0""Unescorted Access Request.pdf"30030"file"".pdf""1""2026-10-22T14:28:35.551+00:00""b22d02fdd2f44114a96a205ad41bf4ad""public""0""public""40b9bf66caa449e5ab99db8d2b983c06""0"2"0""Statement_of_Work__Commercial_Wi-Fi_Internet_8 sep 2026.pdf"144867"file"".pdf""1""2026-10-22T14:28:35.551+00:00""46725659b37846d69d365be104273d3b""public""0""public""c9c1541f92d24779afaf48bcc946fe43""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 835a691e44c04e12acb618e189078967), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.