We'll email you new equipment maintenance & rental opportunities in California as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
NOTICE OF INTENT TO SOLE SOURCE / COMBINED SYNOPSIS-SOLICITATION.
Date: 10/1/2026
Requirement Title: HPAC Maintenance Renewal at Portsmouth Naval Shipyard Detachment San Diego (PNSDETSD)
Solicitation Number: N3904026Q4993
Response Deadline: 10/6/2026 at 5:00 PM EST
Contracts POC: Lisa Fielding, lisa.a.fielding.civ@us.navy.mil
GENERAL INFORMATION:
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. This combined synopsis/solicitation SHALL be posted on SAM.gov.
This solicitation documents and incorporates provisions and clauses of the Federal Acquisition Regulation (FAR) and the Defense Federal Acquisition Regulation Supplement (DFARS) that are in effect on the date of this solicitation's issuance. It is the contractor's responsibility to be familiar with the applicable provisions and clauses. The authoritative sources for the most current regulations are:
• FAR: The official FAR website, which reflects the ongoing "Revolutionary FAR Overhaul" (RFO): https://www.acquisition.gov/far-overhaul
• DFARS: The official DoD Class Deviations website, which contains the most recent updates to the DFARS: https://www.acq.osd.mil/dpap/dars/dfars_far_overhaul_class_deviations.html
This solicitation is being issued as a: Request for Quotation (RFQ)
This acquisition is: Sole Source to American Compressor Company (ACC)
North American Industry Classification System Code (NAICS): NAICS 811310
The size standard is: $12.5 in Millions of Dollars.
REQUIREMENT INFORMATION:
Portsmouth Naval Shipyard requests a quote to provide the following: Renewal of HPAC maintenance services on three (3), Universal HIGHPACK Model 55H75 five stage air cooled, oil lubricated, reciprocating compressors at Portsmouth Naval Shipyard Detachment San Diego (PNSDETSD. The HPAC maintenance will require four separate intervals for service. These intervals are every 500 hours (or, semi-annual), every 1200 hours (or, annual), and every 3000 hours (or every two years) and every 6000 hours (or every 4 years). In addition to the scheduled preventative and corrective maintenance, the Contractor shall provide over and above repair services if it is identified that current issues with equipment exist that impact the equipment receiving maintenance. See Attachment 4 HPAC Maintenance Schedule for the maintenance intervals by year and by the equipment listed in accordance with the Statement of Work.
Attachment 1: Statement of Work
Attachment 2: Sole Source Justification
Attachment 3: Wage Determination San Diego
Attachment 4: HPAC maintenance Schedule
Attachment 5: HEC CCCD
Attachment 6: OPSEC redacted
Exhibits:
Exhibit A CDRLs 001-002
Exhibit B CDRLs 001-002
Exhibit C CDRLs 001-002
Exhibit D CDRLs 001-002
Exhibit E CDRLs 001-002
METHOD OF QUOTE SUBMISSION:
Offer shall be emailed to the Contracts POC Lisa Fielding, lisa.a.fielding.civ@us.navy.mil
System for Award Management (SAM): Vendor must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/.
Validity: The quote must remain valid for a minimum of 30 calendar days.
Technical Requirements: Since this is a sole-source procurement to the OEM, the technical quote is simplified. The Offeror shall provide a brief capability confirmation stating that factory-certified technicians will perform the services and that OEM proprietary replacement parts will be used
Price Reasonableness: The proposed price will be evaluated for reasonableness by comparing the contractor's total quote against the Independent Government Cost Estimate (IGCE) and historical prices paid by both government and commercial entities for the same or similar services, ensuring the best value to the Navy.
Contractor Responsibility: The contractor must be determined responsible in accordance with FAR Part 9 (active SAM.gov registration, no active debarments, and satisfactory past performance).
Over and Above Work CLINs have a "Not to Exceed" (NTE) funding limit of $10,000.00.
All quotes shall include the Request For Quote (RFQ) completed in its entirety. Please fill in all yellow highlighted blocks in form and provide signature
The contractor shall provide scheduled maintenance at four separate intervals (500 hours/semi-annual, 1200 hours/annual, 3000 hours/every two years, 6000 hours/every 4 years) including tasks such as changing oil and oil filter, replacing inlet filter elements, replacing compressor valves, replacing drive v-belts, and a complete overhaul at 6000 hours. The contractor shall also provide over-and-above repair services for issues impacting equipment maintenance, furnish all consumables and repair/replacement parts, dispose of replaced items, use OEM parts (or functionally equal parts with COR approval), and maintain maintenance data records.
"03801-5000""PORTSMOUTH""NH""USA""PORTSMOUTH NH 03801-5000""Exhibit E CDRLs 001-002.pdf"900937"file"".pdf""1""2026-10-01T17:21:30.193+00:00""d52a25910c3c44e0b28bc6834d411a82""public""0""public""5d4e5e2799fd486c95fa05b0e67f1e9c""0"8"0""Exhibit C CDRLs 001-002.pdf"900937"file"".pdf""1""2026-10-01T17:21:30.193+00:00""c9aa5382d61447c699f5869a2515cd80""public""0""public""79af89149c6c41c5815e307564adffe1""0"8"0""Attachment 6 OPSEC red_Redacted.pdf"887833"file"".pdf""1""2026-10-01T17:21:30.193+00:00""4f6e935e4a62418e9ed3b5c9abffa70c""public""0""public""1841080bf13040fc914b7dbee5e6d838""0"8"0""Exhibit D CDRLs 001-002.pdf"900937"file"".pdf""1""2026-10-01T17:21:30.193+00:00""3ccb3db8bed043a598b9124f02b7e4da""public""0""public""4ff5b6b1f9bf4274bc5155cd8d72720d""0"8"0""Exhibit A CDRLs 001-002.pdf"900937"file"".pdf""1""2026-10-01T17:21:30.193+00:00""b1c865c577cb40b0974fe85684bac0b6""public""0""public""0de89748c0704e39828f7b10c4011497""0"8"0""Exhibit B CDRLs 001-002.pdf"900937"file"".pdf""1""2026-10-01T17:21:30.193+00:00""0e22c16d363c40fba651b12812f7e436""public""0""public""568d6dc45f2745c380e4eab5dbfdd9a1""0"7"0""Attachment 2 Sole Source Just_Red.pdf"514585"file"".pdf""1""2026-10-01T17:21:30.193+00:00""d8e4b6696e1c4fd998d95d7c88402b0f""public""0""public""bc821e9abd064449ab40cb339797550d""0"6"0""Attachment 5 HEC CCCD REV D.pdf"111247"file"".pdf""1""2026-10-01T17:21:30.193+00:00""5f736ac356214c3fa8f947aa2067985f""public""0""public""44997ca18c67497c84369e646b64e115""0"5"0""Attachment 1 SOW.docx"35526"file"".docx""1""2026-10-01T17:21:30.193+00:00""4dd7195c7c3b4a228f2e0e3c85cfd290""public""0""public""d05235eb2e884a6093c939140509ef4b""0"4"0""Attachment 3 Wage determination.pdf"45121"file"".pdf""1""2026-10-01T17:21:30.193+00:00""40d3726dc92d47919e4e7dca33ffc007""public""0""public""b9f09aa249ee40d882cd1a19751e91f8""0"3"0""RFQ N3904026Q4993.docx"40289"file"".docx""1""2026-10-01T17:21:30.193+00:00""ffd81fe1d78547b48a31c3f3dfa40ed0""public""0""public""f138d068b9104b3cb2fb301d4ce7376d""0"2"0""Attachment 4 HPAC Maintenance Schedule.docx"19682"file"".docx""1""2026-10-01T17:21:30.193+00:00""1fc389fc1cba441887de7a360b7b484d""public""0""public""e0524805fa784140810030204ebb713c""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8245ef32a6104735804102ed543f4224), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.