R10 Lab: Region 10 Manchester Laboratory Facility Operation and Maintenance Services
R10 Lab: Region 10 Manchester Laboratory Facility Operation and Maintenance Services
The contractor must provide all management, supervision, services, supplies, and labor necessary to operate, maintain, repair, test, and certify all mechanical, electrical, plumbing, fire protection, life safety, and laboratory support systems at the EPA Region 10 Manchester Laboratory complex. The facility comprises multiple buildings on a 17.5-acre site, including a main laboratory, office buildings, a warehouse, and other structures. The work includes eight distinct tasks: project management, administrative requirements, operation and maintenance, energy and environmental management, inspections and certifications, grounds maintenance and snow removal, emergency management, and health and safety management.
We post new hvac opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20460""Washington""DC""US""1200 Pennsylvania Ave, NW ""66219""LENEXA""KS""USA""USEPA REGION 7""11201 RENNER BLVD""https://www.fedconnect.net/FedConnect/?doc=68HE0726R0038&agency=EPA"0"link""1""2026-10-23T19:05:45.737+00:00""191bc690d9e947cf8adc88b27872f30b""public""0""Click here to see more information about this opportunity on FedConnect""public""dc49d24fe8474ec48779c66e7ec3784f""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 819275c2aec04c82bfa4b0f0867d717c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.