Argon Piping Supply, Installation and Testing

Due Jul 27, 2026·28 days left·General ConstructionView official posting ↗
Issuing agency
Department of Energy
Method
Solicitation
Category
Construction · NAICS 236210
PIN
73573
Location
Lead, SD
Posted
Jun 2, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.

This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.

Documents17
K-3 FL-11_Rev1.pdfPDF
K-4 FL-57B (Rev. 1-07).pdfPDF
K-2 SARC_Subcontractor Annual RepsCerts Rev 4.pdfPDF
K-1 PUR-466_Proposal Certifications-.pdfPDF
J-11 Price Sheet including Fully Burdened Hourly Rate.xlsxXLSX
J-10 South Dakota Wase Determinatin 20260016.txtTXT
J-9 FL-55 Small Business Subcontracting Plan (Rev. 6-23) 14.0 - Exhibit III-G.pdfPDF
J-7 014100-8-2025-South Dakota Quality Requirements.pdfPDF
J-6.1 7010_F1_Fermilab Subcontractor Safety Information Questionnaire.docxDOCX
J-6 013100_7-31-2025 FermiForward_South_Dakota.pdfPDF
J-5 010010_General_Requirements_SD_4_2025_FFDG.docxDOCX
J-4 SDSTA Risk Transfer Protocol Manual Final July 12 2024.pdfPDF
J-3 Argon Piping Supply and Install SOW (2).docxDOCX
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdfPDF
J-1 FFDG General Terms and Conditions for Construction at SURF (08.2025).pdfPDF
RFP Argon Piping R1 6.1.2026.docxDOCX
1. RFP Letter 6.1.2026 R1.docxDOCX

Contact

Name
Jerry King
Phone
2173901120
Address
Lead, SD 57754
Full source recordfrom SAM.gov
Type
Solicitation
Title
Argon Piping Supply, Installation and Testing
Active
Yes
Base Type
Solicitation
Notice Id
7b70391c87104e359dbb25379d3554be
Naics Code
236210
Department
DEPARTMENT OF ENERGY
Posted Date
Jun 2, 2026
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/441ced0a6fd24e1b9b12f8f1002d9707/download?fn=K-3%20FL-11_Rev1.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/331dbcc3e073446ea615eaa847b78328/download?fn=K-4%20FL-57B%20(Rev.%201-07).pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9c4f2f29bfec412e9a9ebe02fde83719/download?fn=K-2%20SARC_Subcontractor%20Annual%20RepsCerts%20Rev%204.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cae7bc1c28e34f439c0b49ec125446be/download?fn=K-1%20PUR-466_Proposal%20Certifications-.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eae4f7e3b05a494983ed18c2190e5e6d/download?fn=J-11%20Price%20Sheet%20including%20Fully%20Burdened%20Hourly%20Rate.xlsx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1f30c4921e024646a8b7a67bfefe6a6f/download?fn=J-10%20South%20Dakota%20Wase%20Determinatin%2020260016.txt, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c245671b6f744e4e9d59bce27bfd180e/download?fn=J-9%20FL-55%20Small%20Business%20Subcontracting%20Plan%20(Rev.%206-23)%2014.0%20-%20Exhibit%20III-G.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/60fe93609724468a8e6f8e72d7e73cfe/download?fn=J-7%20014100-8-2025-South%20Dakota%20Quality%20Requirements.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fda48a9cdaee4418b9c0296ac83fd5d1/download?fn=J-6.1%207010_F1_Fermilab%20Subcontractor%20Safety%20Information%20Questionnaire.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e26922f7c06245efa8df55c5ab0bf0ba/download?fn=J-6%20013100_7-31-2025%20FermiForward_South_Dakota.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/791adab065ba4b8cb4bd5b5ee3b579b6/download?fn=J-5%20010010_General_Requirements_SD_4_2025_FFDG.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/707e57999743482ca564b5f3490917ee/download?fn=J-4%20SDSTA%20Risk%20Transfer%20Protocol%20Manual%20Final%20July%2012%202024.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/896ed4936b404a7aa21702f3b93cb21b/download?fn=J-3%20Argon%20Piping%20Supply%20and%20Install%20SOW%20(2).docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/26bfcf6505d244e68029f45e68f8e179/download?fn=J-2%202025%20INSURANCE%20REQUIREMENTS%20FOR%20FRA%20SUBCONTRACTED%20WORK%20AT%20SURF%20Risk%20category%203%20(Rev%2001.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8b693dc7a0da4691ac96e2a37831f165/download?fn=J-1%20FFDG%20General%20Terms%20and%20Conditions%20for%20Construction%20at%20SURF%20(08.2025).pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0d87d7f8c8ad4134a84ac61a9047b04d/download?fn=RFP%20Argon%20Piping%20R1%206.1.2026.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c869d2194a24489998f1d09b40d33165/download?fn=1.%20RFP%20Letter%206.1.2026%20R1.docx
Point Of Contact
Type
primary
Email
jking@fnal.gov
Phone
2173901120
Full Name
Jerry King
Type
secondary
Email
susanu@fnal.gov
Phone
6308402021
Full Name
Susan Underwood
Description Text
As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.
Response Dead Line
Jul 27, 2026
Full Parent Path Name
DEPARTMENT OF ENERGY.DEPARTMENT OF ENERGY.FERMILAB - DOE CONTRACTOR
Place Of Performance
Zip
57754
City
Code
36220
Name
Lead
State
Code
SD
Name
South Dakota
Country
Code
USA
Name
UNITED STATES
Solicitation Number
73573

Source: SAM.gov (notice 7b70391c87104e359dbb25379d3554be), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.