The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ?
2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility.
The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ?
6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
Source: SAM.gov (notice 7a459a73db134c1e9398a726ccf18501), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.
Here are some similar opportunities
Let our AI help you find the right opportunity
Search with AI →