RFP is open to all small businesses. Offer due date is extended to 2-Oct-2027.
Revised attachment, Pre-Proposal Site Visit - CSOG Expansion R1.
Pre-Proposal Site Visit times updated from Central time to Easter time.
Procure contractor services for renovating and expanding the current office space into a neighboring office space. The contractor shall be responsible for:
Furniture, Flooring, Wall Base, and Office Partitions.
Electrical Work
Communication / Data Cabling and Connections
Mechanical Work
Composite Cable and Conduit (Optional)
Ceiling Tile (Optional)
Conference Table (Optional)
AMD01 – Added solicitation instructions within attachment, HC102826R0058 RFP CSOG AMD01.
Added attachment - Pre-Proposal Site Visit - CSOG Expansion
Offer due date is a hard close. No extensions will be granted. RFP questions are due 14-SEP-26 at 2:00 PM CST.
The contractor shall renovate Building 11, Section 13 by expanding the current 4,700 square foot space into a neighboring office to add an additional 3,450 square feet. Work includes removing existing furniture, flooring, wall base, and office partitions; installing new office partitions, flooring, wall base, and furniture; performing electrical work, communication/data cabling and connections, mechanical work (including HVAC modifications and new split system A/C units), and architectural STC-rated walls. Optional tasks include replacing composite cable in conduit, installing new ceiling tiles, and replacing an existing conference table with a new power-integrated table. The contractor must also provide project management, submittals, testing, and close-out documentation.
We post new electrical opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"62225-5406""SCOTT AFB""IL""USA""BUILDING 3600""2300 EAST DRIVE""Pre-Proposal Site Visit - CSOG Expansion R1.docx"27116"file"".docx""1""2026-08-26T12:18:09.197+00:00""4b3bd8ffbc86410fa4c6a3282847a469""public""0""public""0304819ec3be4d4db5f9b45f660565f2""0"23"0""HC102826R0058 RFP CSOG AMD01.pdf"421398"file"".pdf""1""2026-08-25T15:48:30.433+00:00""44f155acebd8477baf11d448025c860f""public""0""public""a03c129538c647b5892b21355e36f901""0"22"0""HC102826R0058 Attachment List.docx"15791"file"".docx""1""2026-08-20T13:48:12.856+00:00""bac061576c3e43ffb57442553a4e9f7d""public""0""public""5987276e71ea44c891fa3387e058a67a""0"20"0""HC102826R0058 RFP CSOG.pdf"1301622"file"".pdf""1""2026-08-20T13:48:12.856+00:00""d2749202830240589e8726e6178c03d9""public""0""public""9c268d4451524d6cac2c05dae90b453d""0"18"0""Attachment 1 CLIN Pricing Worksheet.xlsx"80950"file"".xlsx""1""2026-08-20T13:48:12.856+00:00""5f1c3cb8506349fb8f2d2e46e365269a""public""0""public""2c3d006478d04b22b6ecf6c60d5b147e""0"16"0""Attachment 2 - Mission-Essential Contractor Services.docx"29881"file"".docx""1""2026-08-19T20:11:13.15+00:00""7cb783d6592c4f388101692175fbce60""private""0""controlled""19339156e0b24390bd1f7c6d040e5006""1"11"0""Attachment 3 - Request for Past Performance References.docx"35346"file"".docx""1""2026-08-19T20:11:13.15+00:00""db0fe7becbcb48bd8d8094b2cc42999b""private""0""controlled""eeeffdcb6a614c85baf43c19c1872d56""1"10"0""Attachment 4 - Initial QASP.docx"52640"file"".docx""1""2026-08-19T20:11:13.15+00:00""79324febe239434abccc042250674ab7""private""0""controlled""43fb650fae0f408dbc1dce48130e8d31""1"9"0""Appendix A Concept Plan.pdf"3992936"file"".pdf""1""2026-08-19T20:11:13.15+00:00""fbd5b3c8f6524a799f11e18b0e5d81bf""private""0""controlled""0718f2de27be4074ac06579de4a5ce78""1"8"0""Appendix B DISA Labeling Standard.pdf"460362"file"".pdf""1""2026-08-19T20:11:13.15+00:00""f7453a95afe347959f0f2ac8fcbcbbab""private""0""controlled""635218a313ce4de28a22da1ce899461c""1"7"0""Appendix C DISA Electrical Safety Program.pdf"1923590"file"".pdf""1""2026-08-19T20:11:13.15+00:00""226ba36847a54aebabe43731247ee511""private""0""controlled""3793cf5002644a6cac05e056dd918c73""1"6"0""Appendix D DISAI 240-110-33 Physical Security.pdf"190829"file"".pdf""1""2026-08-19T20:11:13.15+00:00""8aebd9fb49a441219ccc99e97acd4cc0""private""0""controlled""4d6ef42f9e0341e2bcd64bba5fbfbcb0""1"5"0""Appendix E SEC Inventory Spreadsheet.xlsx"42006"file"".xlsx""1""2026-08-19T20:11:13.15+00:00""88c59e6887a8410cbc8be5f3c2235bf5""private""0""controlled""9b98c8ebb19945d699328557cce89edb""1"4"0""Appendix F Non-Disclosure Agreement for Contractor Personnel.docx"34697"file"".docx""1""2026-08-19T20:11:13.15+00:00""3cb2fc81ae014da6968baa7528c8bc87""private""0""controlled""27c7ab45672a4444a61a3334e73fd948""1"3"0""Enclosure 1 - Alternate 2 - CSOG Expansion Conference Room.pdf"200022"file"".pdf""1""2026-08-19T20:11:13.15+00:00""e3472566a0d24765aa9bb3c28dc82414""private""0""controlled""2746ca45759c4862845038b9a64fd957""1"2"0""Enclosure 2 - CDRLs CSOG.pdf"11127083"file"".pdf""1""2026-08-19T20:11:13.15+00:00""021cb1c4be2b48e8a02b926239d7ce7a""private""0""controlled""9192ba8263934c19a30cf740c708c630""1"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 7991cf2c581d437ca32137a81285d770), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.