** NOTE **: The below questions and answers regarding the Publications and Packaging CDRL portions of the solicitation are posted here for your reference:
Packaging - Attachment 15 Question(s)
Section F calls out preserving all exterior unpainted metal surfaces in accordance with MIL-STD-2073 and coating said surfaces with preservative MIL-PRF-16173, Grade 1. In MIL-PRF-53051D, Section 3.10, it states that CARC paint shall not be applied to surfaces greater than 400F which means our metallic exhaust guard would not be painted. Is this coating able to be applied to surfaces greater than 400F? Additionally, is there a reason that preservative MIL-PRF-16173, Grade 1 is not listed in MIL-PRF-53051D anywhere?
Is there a MIL, ISO, FDA or some other standard that the corrosion preventative coating for food handling machinery and equipment must meet? Additionally, why is this not a requirement for the Type II - Pump Assembly, Water in MIL-PRF-53051D?
The SPI calls out a preservative that can be used on bare metal when the item is in storage to prevent corrosion. I’m not sure where MIL-PRF-53051D is coming from, it maybe from the PD, which would be engineering and could be focusing on the inside of the pump.
If the contractor wants to use a different preservative on non-metal, it will need to be from MIL-STD-2073, Appendix J and that preservative would need to meet the functionality of MIL-PRF-016173.
**I’m not seeing where MIL-PRF-53051D was listed in packaging. I reviewed the pkg contract language and CDRLs and didn’t see where it was mentioned. Did the contractor see that in the Purchase Description? If so, that would be an engineering question to answer. **
As far as the wooden crate, it needs to follow heat treatment requirements per DOD 4140.65M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material as laid out in Section D of the contract.
*** Amendment 0005 is issued to extend the proposal due date out to 16 Oct 2026, change the FOB point from Origin to Destination for the production CLINs, revise the Section C Statement of Work (SOW) to remove references to Provisioning, Publications, and Technical Manuals, revise the list of addenda and attachments in Section J, remove select CDRLs and attachments as required, add a CDRL for a Commercial Off-the Shelf (COTS) Operator's Manual in Section J for government review prior to approval, and add/delete or update any clauses or provisions as required (especially due to the revolutionary FAR overhaul).
*** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 ***
*** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 ***
*** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 ***
*** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 ***
Item: Pumping Assembly, Water
NSN: 4320-01-691-1630
P/N: M53051-2-2 (CAGE 81349, Government)
Qty: 14 each basic, 14 each option
Packaging: Military A
FOB: Destination
Contract Type: Definitive contract with 100% option for 365 days
Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of packaging data, safety/security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 7 CDRLs and 7 attachments that support the CDRLs. Thoroughly review the solicitation document and amendments for all requirements prior to submitting your proposal.
***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****
The contractor shall manufacture and deliver 14 each (basic quantity) of the Pumping Assembly, Water, NSN 4320-01-691-1630, part number M53051-2-2, with an option for an additional 14 each. The work includes First Article Testing (FAT) and delivery of a FAT report, as well as seven Contract Data Requirements List (CDRL) items: Meeting Minutes, LPD Coded Data Products Packaging, Special Packaging Instructions, Packaging Test Report, Safety Assessment Report, Hazardous Materials Management Program Report, and a Commercial Off-the-Shelf (COTS) Operator's Manual. The contractor must also develop packaging data, conduct validation testing, and comply with extensive configuration management, environmental safety, and supply chain traceability requirements as detailed in the Statement of Work.
We post new goods & materials opportunities in Michigan as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"48397-5000""WARREN""MI""USA""ZGA""6501 EAST ELEVEN MILE ROAD""MIL-PRF-53051D.pdf"369935"file"".pdf""1""2026-09-14T19:36:01.214+00:00""3047bb32fcb44ef0946bc9384bc2eed6""public""0""public""07663ec74563472fa81d581e98f9573e""0"7"0""Amendment 0005 - SPRDL124R0166.pdf"89737"file"".pdf""1""2026-09-14T19:36:01.214+00:00""d210307ce05a4e2ba80c16ac5782a0e4""public""0""public""10f13c304c20467797f89268aa95265f""0"6"0""DI-TMSS-81817 (Technical Manual Quality Assurance Program Plan DID).pdf"45361"file"".pdf""1""2025-12-05T15:37:56.165+00:00""3d1597b8e8aa44ec9667d24789d7ba5d""public""2026-09-14T19:36:01.214+00:00""1""public""b49b08c6334e4acbb7917c0bec2aca74""0"5"0""2026-09-14T19:36:01.214+00:00""Amendment 0004 - SPRDL124R0166.pdf"12183"file"".pdf""1""2025-11-13T16:39:27.115+00:00""ce844fd876cd45c0b49eb6a0d917e277""public""0""public""ee03dd2ea41c4461a81ce1093b61609b""0"4"0""Amendment 0003 - SPRDL124R0166.pdf"12182"file"".pdf""1""2025-11-13T16:39:27.115+00:00""38846b9677cb4518a3a2f5f88cd37c19""public""0""public""e4c337c2fd794055b59041471c950563""0"4"0""Amendment 0002 - SPRDL124R0166.pdf"12175"file"".pdf""1""2025-10-10T15:31:26.598+00:00""d1ccefca668c454f976c9441576aaeae""public""0""public""6b0ff4e10a654cd8bd7200d9546605e7""0"3"0""Amendment 0001 - SPRDL124R0166.pdf"12182"file"".pdf""1""2025-09-17T13:41:00.836+00:00""872e639567124c1f9bf2ea9b1fe28da6""public""0""public""e0dd960744444a49878af1efa521d601""0"2"0""Solicitation SPRDL124R0166.pdf"277933"file"".pdf""1""2025-08-18T15:41:29.994+00:00""6dd4652ad2094203b05a49061f8b60b6""public""0""public""e002dd0f2bba40bf9b260a94e335b1e0""0"1"0"Most Michigan work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.