**Update 10 September 2026: **Attached Pre-Proposal Conference Slides.
Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.
Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.
We post new general contractors opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"96338-5010""APO""AP""USA""KO CONTRACTING DIVISION""UNIT 45010 CAMP ZAMA""Preproposal Conf Slides_W912HV26RA009 DESC2103C Fuel Tank.pdf"2586135"file"".pdf""1""2026-09-10T01:47:41.756+00:00""2218e4c872194441805829b905dd2ad8""public""0""public""14b25ee0cbbc40cebc49e3d03f736999""0"1"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HV26RA009¬iceType=SolicitationNotice"0"link""1""2026-08-13T02:07:17.837+00:00""c00da083c8c04beca0bdc027fc0a978e""public""0""PIEE Solicitation Module Link for W912HV26RA009""public""36dfde98a5f34fc78864bd9c48c47847""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-08-13T02:07:17.837+00:00""1266146820f54efb82f33af3afa3f399""public""0""Web Based Training for the PIEE Solicitation Module""public""bfbeb25b934d4bc3a6f92898c9f38f7e""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-08-13T02:07:17.837+00:00""1d446f4bab6a44d184a55a2edbfd81f4""public""0""Registration Instructions for the PIEE Solicitation Module""public""c93aea8a258a46cda9ecaee72f84db07""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-08-13T02:07:17.837+00:00""a4d146a540384970b93f3d91c1d00fec""public""0""Department of Defense Procurement Toolbox""public""42f42406693c412991648c2cfb23e0b7""0"1"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 722fdc916e5744dfb0d68fdd3d992fd3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.