See attachments.
The contractor will provide a two-phase Design-Build of a new laboratory facility to support the testing and development of power systems with associated site work, infrastructure, and systems. The scope includes design, procurement, and installation at GRC. The facility will be approximately 34,000 square feet and include an open floor high bay with overhead crane, configurable laboratory space, support spaces, collaboration and administration spaces, mechanical/electrical/telecom rooms, utility tie-ins, liquid nitrogen and gaseous nitrogen storage and distribution, process cooling systems, service air system, specialty lab gas storage and distribution, and specialty life safety systems. Construction also includes utilities, pavement, and additional site improvements. The project must achieve a minimum sustainability standard of USGBC LEED Silver or two Green Globes.
We post new general contractors opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""44135""CLEVELAND""OH""USA""21000 BROOKPARK ROAD""Solicitation - 80GRC026R0010 - APSL FRFP.pdf"1918700"file"".pdf""1""2026-09-25T17:09:16.059+00:00""1b1f023bd77e49c98c00e1146a7d6e17""public""0""public""150262728544489e8761998531c640b3""0"2"0""FRFP Cover Letter - 80GRC026R0010 - APSL.pdf"278781"file"".pdf""1""2026-09-25T17:09:16.059+00:00""c1d7f0437ce94728937ef2e07bcd8c62""public""0""public""dac883ec15ac4ecf9adde83fd67ee55c""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6ca300e8194c4dc794640c369d577246), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.