PROJECT: AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements
LOCATION: 5 miles east of Anchorage, Alaska. All project work is in the Far North Bicentennial Park along the North Gasline Trail.
WORK: Construction of a pedestrian bridge and two boardwalks. Work also includes trail aggregate and turf establishment.
Base Schedule
Site 1 work consists of constructing a 80 feet, single span, prefabricated steel pedestrian bridge over Campbell Creek along the North Gasline Trail.
Site 2 consists of constructing a 61’ boardwalk along the North Gasline Trail.
Option Z
Site 3 consists of constructing a 51’ boardwalk along the North Gasline Trail.
See “Project Description” posted under Attachments for additional details.
LENGTH: 0.2 miles
TENTATIVE COMPLETION DATE: Fall 2027
CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price
ESTIMATED PRICE RANGE: Between $700,000 and $2,000,000 .
INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS
This project is anticipated to be solicited winter 2026/2027.
There will be a Base schedule plus one Option.
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
The work consists of constructing an 80-foot single-span prefabricated steel pedestrian bridge over Campbell Creek (Site 1), a 61-foot boardwalk (Site 2), and an optional 51-foot boardwalk (Site 3), along with trail aggregate, turf establishment, clearing, excavation, structural backfill, gabions, roadway aggregate, structural concrete, reinforcing steel, steel structures, timber bridge railing, helical piles, culverts, and temporary traffic control.
We post new general contractors opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""PROJECT DESCRIPTION_AK FLAP ANCHORAGE 2021(1).pdf"204495"file"".pdf""1""2026-09-16T20:37:41.484+00:00""d3adaf0a06fb4ce5921dfe4efb9ae956""public""0""public""0cbb0f176c2d45b3a40120ef1379d873""0"3"0""Prelim Letter_AK FLAP ANCHORAGE 2021(1).pdf"206308"file"".pdf""1""2026-09-16T20:37:41.484+00:00""f067ddbb7be24534940f4b509888ebc0""public""0""public""115fe9390e0140c094f0b85b3c65cfa5""0"2"0""aka-anchorage2021-1_Plans - PRE-AD_reduced.pdf"40224803"file"".pdf""1""2026-09-16T20:37:41.484+00:00""ef0d7fa2766a47c6a6213d6a68555228""public""0""public""9c24a4f5d1dc4d4ba646920113ed5694""0"1"0"Most Alaska work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6aa4b1378e334e52a4bfc431f0c2abad), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.