Pre-Solicitation Notice: Excitation System Replacement, Beaver Dam, White River Basin, Carroll County, Arkansas for U.S. Army Corp of Engineers (USACE) Little Rock District (SWL). W9127S27RA014, Excitation System Replacement, Beaver Dam, will be advertised as a competitive total Small Business Set Aside under the North American Industrial Classification System (NAICS) Code 335312 - Motor and Generator Manufacturing. The Small Business Size Standard is set at 1,250 employees.
This solicitation will be issued utilizing FAR Overhaul Part 15 as a Request for Proposals (RFP). Proposals will be evaluated via the Best Value - Trade Off method and will result in a firm fixed-price construction contract. The Magnitude of Construction is between $1M and $5M. Design, remove, install, and test two digital static excitation systems, including power potential transformers for each system.
Work shall be complete within 515 calendar days. W9127S27RA014 will be issued around 21 October 2026, via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module, https://piee.eb.mil/sol/xhtml/unauth/index.xhtml and the Government Point of Entry (GPE), www.sam.gov. Amendments to the solicitation will be issued via PIEE/GPE as well.
It is each offerors responsibility to download the solicitation and monitor the sites for updates. Offerors must be registered with the System for Award Management (SAM) in order to submit a proposal in response to this solicitation. Contractors may register for SAM at no cost to them at the following website: www.sam.gov.
This solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit FCI or CUI during performance of the contract.
In accordance with 252.204-7021 Compliance with the Cybersecurity Maturity Model Certification Level Requirements, contractors shall submit the CMMC UID(s) issued by SPRS for contractor information systems that will process, store, or transmit FCI or CUI during performance of the contract. The Contract Specialist for this solicitation will be Shelby Henson. All questions/comments should be forwarded in writing to shelby.m.pyle@usace.army.mil
Design, remove, install, and test two digital static excitation systems, including power potential transformers for each system. Work shall be complete within 515 calendar days.
We post new it & software opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"72201-3225""LITTLE ROCK""AR""USA""KO CONTRACTING DIVISION""700 W CAPITOL AVE ROOM 7315""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9127S27RA014¬iceType=Presolicitation"0"link""1""2026-10-07T18:50:14.743+00:00""a12c593105f54ebe8c914791b9a317b6""public""0""PIEE Solicitation Module Link for W9127S27RA014""public""689f9abb8d9f43babc777e0b05f5b1e1""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-07T18:50:14.743+00:00""122bfdeff623429c8e78f4a0c34c4d4a""public""0""Web Based Training for the PIEE Solicitation Module""public""dc7fc1da2dae4f23aca80480b9b1fc81""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-07T18:50:14.743+00:00""e0639ecc9a1545aaa55f23a148908119""public""0""Registration Instructions for the PIEE Solicitation Module""public""5fbc9de3a4ed47399da9a629fb715b96""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-07T18:50:14.743+00:00""12e6eacb2264402d9cf298aed0bd5b6e""public""0""Department of Defense Procurement Toolbox""public""d7acc22867774f2c93cc1e273d8f5fbd""0"1"0"Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6873e310fa38402e829562f212f45ee7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.