This amendment adds Attachment C.
A site visit is schedule for Thursday, September 3rd @9 am Bldg. 37
POC: Jim Sherry
Office: 708-786-7846
Cell: 708-638-3697
James.Sherry@va.gov
Questions due date September 11th 4:00 pm cst. Please email all questions to michelle.williams4@va.gov
Quotes due October 19th 4:00pm cst. Please email all quotes to michelle.williams4@va.gov
The contractor shall furnish all labor, supervision, tools, equipment, materials, consumables, transportation, and incidentals required to perform preventive maintenance, testing, minor repairs, emergency response, transformer/breaker service, and annual load bank testing of emergency power systems at the VA SDC, Building 37. Services apply to five diesel generators (1250 kW, 750 kW, 500 kW, and two 600 kW), all Automatic Transfer Switches supporting Building 37, two high-voltage dry-type transformers, and utility-side breakers rated 200A and above. Monthly preventive maintenance includes inspection and testing of cooling, fuel, exhaust, lubrication, starting systems, safety shutdowns, monitoring controls, generator output, regulator operation, voltage/frequency stability, batteries, wiring, terminations, and ATS units per Attachment C. Annual load bank testing is performed in September per NFPA-110 load steps. Semi-annual sampling of fuel, engine oil, and coolant is required. Minor repairs (≤1 labor hour and ≤$250 parts) are included; major repairs require COR and CO approval and are billed to the Unscheduled Repair CLIN. Emergency response requires 1-hour telephone response and 2-hour onsite arrival.
We post new generators opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""60141""HINES""IL""USA""P.O. BOX 76""Attachment C.docx"15291"file"".docx""1""2026-08-31T18:24:52.518+00:00""867ddad1c3f1465d99f512751ef71e33""public""0""public""260210682dce45c1958a6a0e3c16210f""0"8"0""36S79726Q0006 0001.docx"121032"file"".docx""1""2026-08-31T18:24:52.518+00:00""184bb784844b40279c533f3c4a5d9a11""public""0""public""8dc5b410ce474180b15d5992c9a3eabf""0"7"0""36S79726Q0006 0001_1.docx"15846"file"".docx""1""2026-08-31T18:24:52.518+00:00""a923561e7f554ad790ae134ebe296669""public""0""public""46ba60ae3401403893cc12e8f1ac1f5e""0"6"0""Wage Determination.pdf"257354"file"".pdf""1""2026-08-25T19:54:50.614+00:00""3046acda58574363a39f3254d34f5f4f""public""0""public""e7adb2588c3a4643b068a8e36e2a39e2""0"5"0""Generator_Consumables Attachment B.docx"31868"file"".docx""1""2026-08-25T19:54:50.614+00:00""b30ae524afb0450caa4664b31593864e""public""0""public""dfe90fc0892d43fab5568f82d9cc4e49""0"4"0""ATTACHMENT A Generator Equipment.docx"25968"file"".docx""1""2026-08-25T19:54:50.614+00:00""8c624e4380ea417691299b44d128a121""public""0""public""bbad7458822c4e28a1318bd6398aaa24""0"3"0""36S79726Q0006.docx"224472"file"".docx""1""2026-08-25T19:54:50.614+00:00""c2b97bf348b4454299b6f0cb65255ff8""public""0""public""0a2143e1dc064e0e939f79a1fc1ce198""0"2"0""36S79726Q0006_1.docx"14855"file"".docx""1""2026-08-25T19:54:50.614+00:00""8ae89be2e0d9409bbfbf4aaa86fb4e84""public""0""public""0c389e91acf541c3840e3c8b81589382""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 672b93f86b5b4ea79b4ef15a99b98c10), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.