We'll email you new architecture and design opportunities in California as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information.
Attendance is optional and will not be evaluated negatively against any submitted proposal.
The conference is intended to be recorded and publicized after it concludes.
Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1
All other terms and conditions of this RFP remain the same.
This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026.
All other terms and conditions of this RFP remain the same.
This RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4.
All other terms and conditions of this RFP remain the same.
This RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3.
All other terms and conditions of this RFP remain the same.
This RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2.
All other terms and conditions of this RFP remain the same.
This RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document.
All other terms and conditions of this RFP remain the same.
Dear Prospective Offeror,
The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U Storage Ring Power Supplies Rack Designs.
The RFP and associated documents (listed below) are attached hereto:
RFP and Proposal Preparation Instructions
Statement of Work; inclusive of all referenced documents.
Please view the following Google Drive for complete Technical documentation:
https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj
Sample Subcontract
ALS-U Quality Evaluation Survey (required with submission)
4. Rep Cert Form (required with submission)
Timeline of Events:
Questions for Clarification - no later than September 24, 2026
Pre-Proposal Conference - Week of September 28, 2026, if necessary
Submissions due - no later than October 2, 2026.
Complete rack-level detailed design for 16 Storage Ring rack configurations totaling 76 racks, including 3D mechanical models in Autodesk Inventor to validate fit, airflow and thermal management, cable routing and maintainability, drafting packages for bus bars and mechanical parts and enclosures, electrical diagrams for all variants, and interconnect and cable-harness designs, plus PDR and FDR support for three rack families, weekly status updates, and as-needed post-design vendor clarification, submittal reviews and drawing revisions, with final packages due January 31, 2027.
"Richland""WA""US""2345 Stevens Drive""94720""Berkeley""CA""USA""1 Cyclotron Rd""QA RFP AA-2027-01 No. 4.pdf"70425"file"".pdf""1""2026-09-25T14:27:58.643+00:00""8da7aab507434e51a2f62844960c1836""public""0""public""9c652369282f4dccbe9d298a670bde89""0"10"0""QA RFP AA-2027-01 No. 3.pdf"85917"file"".pdf""1""2026-09-23T23:42:03.655+00:00""03ee44a935314ddfa81def915b5d7a94""public""0""public""6f59450052d64d4c9143af4469814d80""0"9"0""QA RFP AA-2027-01 No. 2.pdf"61888"file"".pdf""1""2026-09-22T16:24:26.616+00:00""a1845676c8204d7094ea535f8b47396c""public""0""public""8f797354b4194ce29c4c99945596db1b""0"8"0""QA RFP AA-2027-01.pdf"41099"file"".pdf""1""2026-09-20T19:27:47.124+00:00""d5cf7ffc124c47bea9c7539f11436897""public""0""public""b858c60c43ad4ee1aa67d71c68e6e7f2""0"7"0""0. RFP, AA-2027-01.pdf"291213"file"".pdf""1""2026-09-20T12:27:07.292+00:00""11ad5286421e451faa58581731b2aeea""public""0""public""f615bb26942c49e5a488993acbafa5ca""0"5"0""1. SOW, AL-1964-3328A.pdf"1005574"file"".pdf""1""2026-09-20T12:27:07.292+00:00""3e615dbbed0745f8a68c96e555465fb5""public""0""public""0c70876ba3c441cd967877f6a66993ee""0"4"0""2. Sample Subcontract, AA-2027-01.pdf"252045"file"".pdf""1""2026-09-20T12:27:07.292+00:00""12fcf9da30ae48ce8922cfd00d2408ee""public""0""public""bac41e8501bd45dcad66607e5015f82b""0"3"0""3. ALS-U Supplier Quality Evaluation Survey, RFP AA-2027-01.pdf"1286464"file"".pdf""1""2026-09-20T12:27:07.292+00:00""116820930fba4b0ab62bdadccf3b03b8""public""0""public""c02048d5a63041588f3da38709cf11f2""0"2"0""4. Standard Form Rep Cert, RFP AA-2027-01.docx"67215"file"".docx""1""2026-09-20T12:27:07.292+00:00""1fa292c2426b464db8f417edc980c74d""public""0""public""4c3dd283201a4d34b596f16b39e93d63""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 60317a62bb4a42f680730d70f3b43574), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.