10/08/2026 - Amendment 0001 is issued to extend the due date to November 9, 2026 to allow the government time to update the Statement of Work (SOW) and obtain authorization to include drawings and pictures. (See attached 2031ZA26R00027 0001).
09/16/2026 - See Request for Proposal with attachments.
Survey, design, demolish, remove and dispose of two Evapco AT 424-936 cooling towers, one BAC VXT-800CR tower, abandoned Tower #5, condenser pumps/motors, piping, insulation, chemical feed, heat exchanger, economizer pumps, controls, electrical components, roofing and corroded structural steel platform; furnish and install replacement towers, four upgraded condenser water pumps, manifolded piping, heat exchanger, chemical feed, electrical and SCADA-integrated controls; erect new structural steel platform; provide submittals, permits, testing, commissioning, as-built drawings, O&M manuals, warranties and training while keeping the facility operational.
We post new uncategorized opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20228""WASHINGTON""DC""USA""14TH&C STREET, SW""2031ZA26R00027 0001.pdf"620268"file"".pdf""1""2026-10-08T18:41:38.504+00:00""8d3a41c0af8f4dfe885184d6e8b57efd""public""0""public""6789625d2cdb4a59865f604b04413c3a""0"17"0""2031ZA26R00027.pdf"1680242"file"".pdf""1""2026-09-16T19:43:34.792+00:00""57a82b4f138748eeae2d39de43fe8cef""public""0""public""59bc27ad6aa147768974de1e0d120b4c""0"16"0""Attachment 1 - Past Performance Questionnaire.pdf"418472"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8744f8ae3db64f9c9020dd57553a3afe""public""0""public""944c5842ff2849ecbadee0c71851c7d3""0"14"0""Attachment 2 - Davis-Bacon Wage Determination DC20260001 Modification 06.pdf"3539790"file"".pdf""1""2026-09-16T19:43:34.792+00:00""744890ad6fd646cb993dc8e9211a0c14""public""0""public""ddd82c5330fb469b9340167fd653169d""0"13"0""Attachment 3 - Statement of Work - Cooling Towers.pdf"890407"file"".pdf""1""2026-09-16T19:43:34.792+00:00""56ba35c49e23415d803abea7f2405b53""public""0""public""8090d618d6dd45e79380d61be92b80dd""0"11"0""Attachment 4 - Pricing Table.pdf"256018"file"".pdf""1""2026-09-16T19:43:34.792+00:00""2e310a832ac642d69f1266a362cfb2d2""public""0""public""db38462762a048809e7b37574e5ecb66""0"10"0""Attachment 5 - Quality Assurance Surveillance Plan (QASP).pdf"1158966"file"".pdf""1""2026-09-16T19:43:34.792+00:00""3892fdfa87844141a979f31a09c63df4""public""0""public""3b540f360e664dd0805557dbdd9d1a72""0"9"0""Attachment 6 - Initial Staffing Plan.pdf"70534"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8cd49c8c2ed04704b64314df4950765d""public""0""public""7071e9a2bc614f9ab7ddad9e3f951400""0"3"0""Attachment 7 - Monthly Workforce Report.pdf"75844"file"".pdf""1""2026-09-16T19:43:34.792+00:00""8f8629ee63c54ba09f576e5e7c3fd870""public""0""public""5682e8e1981c47bd989a98d7dc93c69f""0"2"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 5eb08f3be6ca4dd592c3b8cc42f523b5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.