We post new electrical opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual‑stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.
The project requires the contractor to install approximately 900 feet of 2-inch HDPE SDR 11 pipe by directional drilling, boring or trenching to connect pipe from the west side of Hwy 24 near Dwelling 1 to the existing 2-inch water distribution system on the east side of Hwy 24. The 2-inch HDPE water pipe must be sleeved from station 3+75 to station 5+25 to cross underneath CO HWY 24. The water distribution system shall be installed at a minimum depth of 10 feet below grade. Work includes removal of the existing well pump and installation of a new well pump to attain 15 GPM, installation of 2 water storage tanks, a 30 GPM dual stage boost pump, decommissioning of well on East side of Highway (Permit # 117217), and abandonment of existing waterlines. Electrical work includes paying Sangre de Cristo Electric Association to remove and relocate electric meters, upgrading existing service from 100 amps to 200 amps, installing a 100-amp sub panel, and installing electrical and controls for the boost pump. Septic work includes installation of a new septic system for the 'Blue and Brown House' including all components of the distribution system, septic tank, and pressurized sand filter, installation of a new septic tank for the 'Shop' septic system, and installation of a new septic tank for the 'Bunk House' septic system. The project also includes asphalt removal and new road and gate installation.
"US""US""20250""WASHINGTON""DC""USA""PROCUREMENT & PROPERTY SERVICES""1400 INDEPENDENCE AVE SW, MS-1138""C04c Attachment 3 Drawings 1240LT26Q0107.pdf"7712914"file"".pdf""1""2026-08-07T14:47:18.058+00:00""f4cbedf6cefa4e3a91784feaf26cfa33""public""0""public""b0332b0bfd264a29926c99b38f7bc3c4""0"12"0""C04i Attachment 9 Site Visit Plan 1240LT26Q0107.docx"3942372"file"".docx""1""2026-08-07T14:47:18.058+00:00""f86789c1987e4860809ba4f97ff6f258""public""0""public""38f88092cf964d8cb6fa395bce1a7298""0"11"0""C04f Attachment 6 Test Pits 1240LT26Q0107.pdf"3007940"file"".pdf""1""2026-08-07T14:47:18.058+00:00""3944d4c9a188449087bf32d259618a1e""public""0""public""4be13a47fc37454c875ab40ee4c79a09""0"10"0""C04k Attachment 11 General Decision CO20260003 05182026.pdf"1943413"file"".pdf""1""2026-08-07T14:47:18.058+00:00""0e162e5898814aa292fb61b3df25c087""public""0""public""5d700499347848d689f4e928c6b4cc03""0"9"0""C04d Attachment 4 Project Manual 1240LT26Q0107.pdf"1177568"file"".pdf""1""2026-08-07T14:47:18.058+00:00""abecfbc63b4744f586aa26111514acb8""public""0""public""8e4aaac21f4245889bec464f425c2d6a""0"8"0""C04e Attachment 5 Site Map 1240LT26Q0107.pdf"1021617"file"".pdf""1""2026-08-07T14:47:18.058+00:00""5b39acb8148741668dde5f7a2c64231f""public""0""public""d5c4ff5c0ce7492ca0b84851e40748ad""0"7"0""C04g Attachment 7 Well Permit Number 117217 1240LT26Q0107.pdf"322651"file"".pdf""1""2026-08-07T14:47:18.058+00:00""8545313c5ded44258c079cce87973240""public""0""public""5bb1c13c927f48408191ef2317e9acf6""0"6"0""C04 SF1442 1240LT26Q0107.pdf"311721"file"".pdf""1""2026-08-07T14:47:18.058+00:00""bfb72678a6074e578ba46689efa8d95b""public""0""public""8cf31aa9b343417eaf2551a14cf68af6""0"5"0""C04b Attachment 2 SOW 1240LT26Q0107.docx"66574"file"".docx""1""2026-08-07T14:47:18.058+00:00""46a7bee0702d4ff88f8777d1f6cbe85b""public""0""public""24909b84649b4b93a251d840c0d78991""0"4"0""C04h Attachment 8 Well Permit Number 268119 1240LT26Q0107.pdf"47777"file"".pdf""1""2026-08-07T14:47:18.058+00:00""6a7d6a18586d44c386a58ff54a49ea88""public""0""public""6a266c5e738e400cb7f05038c7f51bc1""0"3"0""C04j Attachment 10 RFI Form 1240LT26Q0107.docx"29856"file"".docx""1""2026-08-07T14:47:18.058+00:00""2b9b5c403f364bd5afd17f7e368cff70""public""0""public""c0e5338192b9445da8156b18b091223f""0"2"0""C04a Attachment 1 SOI 1240LT26Q0107.xlsx"14301"file"".xlsx""1""2026-08-07T14:47:18.058+00:00""4754ed3e8a8443a1a2de2b6ad14748b9""public""0""public""4fcbc48786e048ff9f89cac591bbff7d""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 5e87020a228c4de7a402ddfe21ad13a5), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.