We post new electrical opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
AMENDMENT 0003 (08/11/2026):
UPDATED SOLICITATION CLOSING DATE: MONDAY AUGUST 17, 2026 12:00 MDT
END OF AMENDMENT 0003
AMENDMENT 0002 (08/06/2026):
ADDED ITEMS TO ATTACHEMENTS
15 Asbestos Analysis 1305M326Q0317
15 Clarifications on CLIN 1305M326Q0317
15 Q and A 1305M326Q0317
15 Technical Exhibit #4 Revised 1305M326Q0317
ADDITIONAL SITE VISIT ON MONDAY AUGUST 10, 2026 8:00 – 10:00 PACIFIC DAYLIGHT TIME
PLEASE RSVP FOR ADDITIONAL SITE VISIT BY 12:00PM PACIFIC DAYLIGHT TIME FRIDAY AUGUST 07, 2026 VIA EMAIL TO JAMIE.ROSALES@NOAA.GOV. ALL VISITORS NEED REAL-ID.
END OF AMENDMENT 0002
AMENDMENT 0001 (07/28/2026):
UPDATED STATEMENT OF WORK FOR CLIN 0002 AND ADD ADDITIONAL CLIN 0007
ADDED PICTURES FOR CLIN 0007 IN ATTACHMENTS.
END OF AMENDMENT 0001
REQUEST FOR QUOTATIONS (RFQ)
Constructions Services for NOAA Western Regional Center Electrical Repairs
Commercial construction services, to provide all labor, equipment and materials (unless otherwise provided herein) necessary for NOAA Western Regional Center Electrical Repairs Services in Seattle, WA, in accordance with the Statement of Work. Period of performance is 6 months from Notice to Proceed.
A complete description of requirements, including documentation supporting any brand name descriptions or technical data, can be found in the SF18.
The Government intends to award as a trade-off, single award, firm fixed-price purchase order on an all or none basis with payment terms of Net 30.
THE GOVERNMENT DOES NOT ACCEPT RESPONSIBILITY FOR NON-RECEIPT OF QUOTES. IT IS THE CONTRACTOR’S RESPONSIBILITY TO REQUEST AND RECEIVE A CONFIRMATION OF THE QUOTE RECEIPT.
Per NOAA Deviation 2025-02/03: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Contracting officers will not consider those representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
(End)
The contractor must provide all labor, equipment, and materials to perform electrical repairs at NOAA Western Regional Center Hangar 32. Work includes CLIN 0001 (Panel Repairs Room 109), CLIN 0002 (NE Stairwell and Hangar Entry - demo old panels and reroute power), CLIN 0003 (Center Wind Tunnel - repair associated equipment), CLIN 0004 (SE Stairwell and Hangar Entry - demo old panels and replace Panel CB-1), CLIN 0005 (SW Stairwell and Hangar Entry - demo old panels), CLIN 0006 (Optional - NE Hangar Entry - install generator manual transfer switch), and CLIN 0007 (Optional - NW Stairwell - demo and make safe). The contractor must also provide as-built drawings stamped by an Electrical Professional Engineer licensed in Washington, provide short circuit arc fault calculations, and submit a detailed cost breakdown for each CLIN.
"US""US""98115""SEATTLE""WA""USA""WESTERN ACQUISITION DIVISION""7600 SAND POINT WAY NE BLDG 1,""Sol_1305M326Q0317_Amd_0003.pdf"231745"file"".pdf""1""2026-08-11T11:31:16.461+00:00""719963e34fa24cafbab91cab55be151c""public""0""public""91dfaa15d708475c93feb1e3da334e01""0"15"0""Sol_1305M326Q0317_Amd_0002.pdf"242323"file"".pdf""1""2026-08-06T13:55:39.156+00:00""cce51d1bb073469a99f3541f16e5a548""public""0""public""4ecdbb91074e45c6aea047dae56857e4""0"14"0""15_Q_and_A_1305M326Q0317_0002.xlsx"27015"file"".xlsx""1""2026-08-06T13:55:39.156+00:00""0fdc27ab60b84783b569cbeb7873b39f""public""0""public""c4e18459c0cb44b28ba979bc2c8daed2""0"13"0""15_Technical_Exhibit__4_Revised_1305M326Q0317_0002.pdf"856939"file"".pdf""1""2026-08-06T13:55:39.156+00:00""b572ee4dd07944df9a697a836ce866c2""public""0""public""9df8fcdcc8ce4371b4bbf8e2d8543265""0"12"0""15_Asbestos_Analysis_1305M326Q0317_0002.pdf"360048"file"".pdf""1""2026-08-06T13:55:39.156+00:00""66deedaab17646bfa50b43771fa34e73""public""0""public""82ba60fc79c44407992feff85497135e""0"11"0""15_Clarifications_on_CLIN_1305M326Q0317_0002.pdf"1887491"file"".pdf""1""2026-08-06T13:55:39.156+00:00""fe52d7ddf593425fb10917330c0dd57b""public""0""public""70ed69df6ed94e959a4c554e0d4a9aa7""0"10"0""Sol_1305M326Q0317_Amd_0001.pdf"326721"file"".pdf""1""2026-07-28T21:13:22.835+00:00""67c7295817b2410f9ca6301dd8a1a014""public""0""public""996355bfd38c4165a21a20a44a64d880""0"9"0""12_ADDED_Technical_Exhibit_Correction_to_CLIN_1305M326Q0317_0001.pdf"1946316"file"".pdf""1""2026-07-28T21:13:22.835+00:00""1a613756c40f45a59f660a2147402058""public""0""public""bc37ab87ab52489f89d2b05af743c671""0"8"0""Sol_1305M326Q0317.pdf"398063"file"".pdf""1""2026-07-16T22:47:09.725+00:00""a4339feb77d14e3cb56b1dd4461eed8e""public""0""public""68716769a5664c81a068ba83f07098ba""0"7"0""3_Technical_Exhibit_145027-26-0030.pdf"6246968"file"".pdf""1""2026-07-16T22:47:09.725+00:00""3c590042dac846dabff94a489e8b7dcd""public""0""public""855f88214bba438b8a75364d9d6c74ce""0"6"0""2_Technical_Exhibit_SOW_Pictures_145027-26-0030.pdf"28467372"file"".pdf""1""2026-07-16T22:47:09.725+00:00""6d279256ffe74511a04bf077c65048ed""public""0""public""3a80516d87644ddb9e44321e862abbda""0"5"0""4_Technical_Exhibit_145027-26-0030.pdf"768933"file"".pdf""1""2026-07-16T22:47:09.725+00:00""c095ff5d52924a4c8dd892d833bd0190""public""0""public""9c733b9d30d34a41b9922d9115d0c785""0"4"0""5_Technical_Exhibit_145027-26-0030.pdf"2147113"file"".pdf""1""2026-07-16T22:47:09.725+00:00""89804931cbfc4848b368d8f570d7fac0""public""0""public""088b1de89468430eb5c9beb05aef9391""0"3"0""6_Technical_Exhibit_145027-26-0030.pdf"4662038"file"".pdf""1""2026-07-16T22:47:09.725+00:00""3ecf6484a389405f902d6ccdc0709e9d""public""0""public""156e9dcaf468461d80db57d414f9b117""0"2"0""7_Asbestos-Containing_Materials_Certification_145027-26-0030.pdf"132897"file"".pdf""1""2026-07-16T22:47:09.725+00:00""7e368d0d324e486886ba0221e7c8a105""public""0""public""5bc57b79e50740e08706e628d622d318""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 57eab9beb02c4d28af673b7048d7a68d), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.