The General Services Administration (GSA), Public Buildings Service (PBS), is seeking a qualified contractor for construction services for the Gate 7 Parking Garage at the St. Elizabeths West Campus in Southeast Washington, DC.
GSA anticipates awarding a single Firm-Fixed-Price construction contract for the new construction of the Gate 7 Parking Garage and associated site, utility, security, stormwater, landscape, and infrastructure improvements. The project will support the operational needs of the U.S. Department of Homeland Security (DHS) at the St. Elizabeths West Campus.
This acquisition is for construction services only. The project design is being completed separately by GSA’s Architect of Record, ZGF. The construction solicitation is based on Issued for Construction drawings, specifications, and related contract documents.
The work to be performed under the terms of this contract includes, but is not limited to, furnishing all management, supervision, subcontractors, labor, materials, supplies, tools, equipment, coordination, quality control, testing, inspections, commissioning support, and closeout documentation necessary to construct the Gate 7 Parking Garage in accordance with the contract documents.
The project includes construction of a new multi-level parking garage with associated surface parking, access and screening infrastructure, and related campus improvements. The anticipated scope includes, but is not limited to:
Site development, clearing, grading, excavation, and civil infrastructure improvements
Utility relocations, extensions, tie-ins, and connections
Substructure construction, including foundations, slab-on-grade, excavation support, waterproofing, and retaining walls
Parking garage structure, including structural framing, parking decks, ramps, stairs, elevators, roof assemblies, and related structural components
Mechanically ventilated parking garage systems, including ventilation equipment, shafts, ductwork, louvers or openings, controls, electrical power, life-safety interfaces, testing, balancing, and commissioning support
Exterior façade and building envelope construction, including a classical architectural brick façade with openings
Exterior doors, windows, louvers, waterproofing, sealants, flashings, and related envelope components
Mechanical, electrical, plumbing, fire protection, fire alarm, emergency communications, lighting, controls, IT, telecommunications, electronic security, access control, CCTV, parking guidance, and related systems
Physical security elements, including vehicle barriers, bollards, gates, credentialing areas, and screening-related infrastructure
Roadway, shuttle, pedestrian circulation, hardscape, landscape, site lighting, signage, and related site improvements
Stormwater management facilities, erosion and sediment control, and environmental protection measures
Testing, inspections, commissioning support, training, warranties, as-built documentation, BIM/COBie deliverables where applicable, and project closeout
The Gate 7 Parking Garage will be constructed within the active St. Elizabeths West Campus, a high-security federal campus and National Historic Landmark. The contractor will be required to coordinate construction activities with ongoing campus operations, security requirements, occupied facilities, existing utilities, shuttle operations, adjacent work, traffic and access impacts, and protection of historic and environmental resources. The contractor may also be required to coordinate with District of Columbia agencies or authorities, as applicable, for traffic control, haul routes, public space, utility, roadway, permit, or other construction-related requirements.
All work shall conform to applicable GSA requirements, the 2026 PBS Core Building Standards, contract drawings and specifications, campus security requirements, applicable codes and standards, and project-specific requirements.
The estimated cost range for construction is between $120,000,000.00 and $160,000,000.00.
The intended project delivery method is a Phased Acquisition procurement using a Two-Phase Construction Concept.
AMENDMENTS TO SOLICITATION: It is the offeror's responsibility to monitor SAM.gov for the release of any amendments.
BONDING: A bid bond is required in Phase 2 as well as payment and performance bonds after award.
SECURITY: Before employees are allowed to work under the anticipated contract, all personnel are required to pass a security check. Specific security requirements will be contained in the solicitation.
FUNDS AVAILABILITY: Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government arises until award of the contract.
ELIGIBLE OFFERORS: All responsible business firms may submit a proposal which shall be considered by the agency. All prospective offerors are also required to use the System for Award Management at SAM.gov for registering their firm and completing representations and certifications.
Any questions regarding this notification shall be directed to Jennifer Silkensen, Contracting Officer, via email at jennifer.silkensen@gsa.gov. Potential offerors are responsible for monitoring and downloading the solicitation and any potential amendments, if any, to the solicitation.
The contractor will furnish all management, supervision, labor, materials, equipment, and subcontractors necessary to construct a new multi-level parking garage with surface parking, access and screening infrastructure. Work includes site clearing, grading, excavation and civil infrastructure; utility relocations and connections; substructure work including foundations, waterproofing and retaining walls; structural framing, parking decks, ramps, stairs, elevators; a mechanically ventilated parking garage system with associated controls and life-safety interfaces; a classical brick façade and envelope; MEP, fire protection, fire alarm, security, access control, CCTV, and parking guidance systems; physical security elements such as barriers, bollards, and gates; roadway, pedestrian, and landscape improvements; stormwater management and erosion control; and testing, commissioning, training, and closeout documentation including BIM/COBie deliverables.
We post new general contractors opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Solicitation Amendment 47PB5126R0038_0002 SF30.pdf"466645"file"".pdf""1""2026-10-22T13:58:20.041+00:00""4718b032b8b7409e8aeea954e7bc112e""public""0""public""134970a55edd44b2b2c04440dcd57aa4""0"61"0""Solicitation Amendment 47PB5126R0038_0001.pdf"585930"file"".pdf""1""2026-10-06T21:47:03.483+00:00""67d88ce7b72b49f9824e6ce17d3fdf3d""public""0""public""7f84c622d7214ca48f31444c6b107da9""0"60"0""47PB5126R0038 SF1442 Gate 7 Parking Garage.pdf"1340987"file"".pdf""1""2026-09-27T18:42:49.833+00:00""048551f8f39b4791b6a9e95e541bc151""public""0""public""962404f45eac4e1ca756d7d569724b0e""0"59"0""47PB5126R0038 Gate 7 Parking Garage Solicitation 201 SEPT 2026.pdf"674338"file"".pdf""1""2026-09-27T18:42:49.833+00:00""f1dc049075fb48d6ac0585355e29a0fd""public""0""public""df29d1ef45764e1c8bf96649df112ba9""0"56"0""47PB5126R0038 Gate 7 Parking Garage Agreement 101 SEPT 2026.pdf"485954"file"".pdf""1""2026-09-27T18:42:49.833+00:00""a0d952543502431f8a9db2a9830e00b2""public""0""public""59d90a65d28d4ee0a180cd17a8d62217""0"55"0""Attachment 1 Proprietary Information Agreement.pdf"59808"file"".pdf""1""2026-09-27T18:42:49.833+00:00""2a36a5b485254fb6898fac739f524c3b""public""0""public""95ec9552e7f6411ea613293e2e1c1b86""0"54"0""Attachment 2 - PBS Past Performance Questionnaire.pdf"338833"file"".pdf""1""2026-09-27T18:42:49.833+00:00""390e7187637f4fdbb8f048f21c125e85""public""0""public""9b241a328cd2469c9a9561dd738752e5""0"53"0""DC20260002 DB WD Sept 2026.pdf"69917"file"".pdf""1""2026-09-27T18:42:49.833+00:00""324ab16e9ddc4ff99a3e3c47bbe92e5a""public""0""public""94d0dbeaa9d24a9289a39c833c666007""0"45"0""26-0918_Gate 7 Garage_Final DBB SOW FY25 v1.pdf"1349080"file"".pdf""1""2026-09-27T18:42:49.833+00:00""348fd8ce244d444cad36b3713bee85cb""public""0""public""8086f0627f8a4cf08a6af721e5791ef9""0"44"0""Gate 7 Garage_65 Narrative.pdf"7808170"file"".pdf""1""2026-09-27T18:42:49.833+00:00""b6c1e87f781244c3bd61974637c14030""public""0""public""7ca3e67a0aa94b27b40ddf0966e10ca4""0"43"0""Gate 7 Garage_65 Construction Documents_Structural Calculations.pdf"3049216"file"".pdf""1""2026-09-27T18:42:49.833+00:00""6b00fa1e661949d5af95365201e8e965""public""0""public""1bde3095256b4acf9c5c9c47b3c6cf4a""0"42"0""Gate 7 Garage_65 Construction Documents_Lighting Cutsheets.pdf"23253418"file"".pdf""1""2026-09-27T18:42:49.833+00:00""b11f6fb91f9545bcbdeabd901dfede36""public""0""public""6027c7b9fb7143f79b9c0d0c293ef1ec""0"3"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 5617c47010cf443daffc9b0e777339e7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.