Amendment 1
Reopening of Solicitation: The solicitation is hereby reopened. Offerors may submit new or revised quotations.
**Instructions to Offerors: **Offerors who previously submitted quotations may revise and resubmit if desired.
See attached Amendment 1. All other terms and conditions of the solicitation remain unchanged.
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR Subpart 12 and supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.
Solicitation number 1240BH26Q0063 is issued as a Request for Quotation (RFQ) for Lava Lands Pump Replacement & Well Survey.
The Forest Service requires services to inspect, clean, rehabilitate, and restore the Lava Lands Visitor Center (LLVC) potable water well, a public drinking‑water supply source. The LLVC well is producing persistent sediment that is damaging plumbing fixtures, increasing reactive maintenance needs, and reducing system reliability. The existing 20 HP pump and associated equipment have surpassed typical service life and require replacement.
The Contractor shall perform a video well survey, conduct well cleaning and rehabilitation, diagnose sediment issues, and replace the well pump and any related components necessary to return the system to reliable operation. The objective is to restore clean, dependable potable water service, protect LLVC infrastructure, and reduce maintenance demands. All work must be performed by a licensed water‑supply well constructor in accordance with Oregon Health Authority regulations and Oregon Administrative Rules. The Contractor is responsible for furnishing all labor, materials, equipment, and incidentals necessary to complete the work unless otherwise stated.
The applicable NAICS code is 237110, Water and Sewer Line and Related Structures Construction. The small business size standard is 45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Interested and qualified contractors are invited to submit a complete quote in accordance with all requirements outlined in the solicitation. Instructions to offerors, evaluation criteria, and applicable terms and conditions are provided in this notice and its attachments.
The Contractor shall perform a video well survey, conduct well cleaning and rehabilitation, diagnose sediment issues, and replace the well pump and any related components necessary to return the system to reliable operation. The work includes removing the existing pump and drop pipe assemblies, conducting a comprehensive downhole survey including video logging and well-profiling, performing well cleaning and rehabilitation to remove accumulated sediment, and furnishing and installing a new in‑kind well pump. An option item covers replacing degraded or deteriorated drop pipe sections identified during inspection. The contractor must also flush the well, perform bacteriological water testing, and provide as-built documentation.
We post new appliances opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""972042829""Portland""OR""USA""1220 SW 3RD AVE STE 310""1240BH26Q0063 ExecAmend 1 Lava Lands Well Repair.pdf"123530"file"".pdf""1""2026-09-09T22:27:41.533+00:00""c71e9c6cd92346298d2f5b8b704e77e7""public""0""public""e5ee892cebbb453c893d5d5e31314480""0"37"0""C04_Att. 1 Terms and Conditions_Lava Lands.pdf"326251"file"".pdf""1""2026-08-24T23:41:00.661+00:00""b41876a3ec884e7992b24e7e2a474e4b""public""0""public""c231bd27460d42368ece0bf74db36593""0"36"0""C04_Att. 2 Solicitation Details and Requirements.pdf"213227"file"".pdf""1""2026-08-24T23:41:00.661+00:00""584d498867d946fcb646663c611813ab""public""0""public""1155b102d39c4c55b2acf40f182ff4f6""0"35"0""C04_Att. 3 Instructions and Evaluation Criteria.pdf"396381"file"".pdf""1""2026-08-24T23:41:00.661+00:00""b7327d386d004339b08c79202aaa6756""public""0""public""87da52e6526a4442971f0a35ebf4d9b6""0"34"0""C04_Att. 4 Lava Land Project Specifications.pdf"309463"file"".pdf""1""2026-08-24T23:41:00.661+00:00""a3046bffc0554a038e963da17c2bc467""public""0""public""5063101d83a84a75828916190990a107""0"33"0""C04_Att. 5 Plans Well Upgrades (2008).pdf"4201595"file"".pdf""1""2026-08-24T23:41:00.661+00:00""994638e543fb424ab3aa7daedbce5547""public""0""public""57e08fccfa624502ac6129cf83ae6870""0"32"0""C04_Att. 6 Well Log.pdf"94431"file"".pdf""1""2026-08-24T23:41:00.661+00:00""4bb1b328eec94a019c13088ef539a039""public""0""public""7db59f1f4b1b4ac7a9f05d0c7cc3055a""0"27"0""C04_Att. 7 LLVC Well & Pump Info 2013.pdf"129639"file"".pdf""1""2026-08-24T23:41:00.661+00:00""f21d372b81f145909826a1ef9c5baaed""public""0""public""293168d461ac44148e482bd10fd3994f""0"26"0""C04_Att. 8 Fire Plan.pdf"2035923"file"".pdf""1""2026-08-24T23:41:00.661+00:00""01266a2acded4592a95a9bdb4f8d0e77""public""0""public""ddcf9519b62945f58a8bf5804c55f397""0"25"0""C04_Att. 8.1Fire Protection & Suppression.pdf"233580"file"".pdf""1""2026-08-24T23:41:00.661+00:00""52c9bc4a795b48c7938571093cac6547""public""0""public""403e7a5e55a34f16a87bb330fea6e3dc""0"18"0""C04_Att. 9 Past Performance and Experience Submittal Form.pdf"108286"file"".pdf""1""2026-08-24T23:41:00.661+00:00""5681ba80691f4851a7a8d3ff43ea1cb0""public""0""public""ac457a7d24624726af1bd631e94d6018""0"17"0""C04_Att. 10 WD OR20260097_05.18.2026.pdf"1812020"file"".pdf""1""2026-08-24T23:41:00.661+00:00""a62b68f1046948bd9042c580e385d087""public""0""public""f82d141ac472498ea04bf59f2714c620""0"16"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 533a78c5ea63430fb7a891c092f6afc1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.