Replace Domestic Water, Chilled Water, and Steam Piping
Project Number 558-24-160
STATEMENT OF WORK
Description of Work - Summary:
The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping.
General**:**
The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications.
The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate.
Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations.
Period of Performance**:** Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items.
The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide all supervision, materials, labor, equipment, transportation, testing, and storage. Work includes general construction, alterations, walks, drainage, equipment, piping, and controls necessary for removal of existing structures and construction. The work must be phased to minimize disruption to the occupied healthcare facility, which operates 24 hours a day. The project also includes an alternate to delete scope for piping replacement in a recently constructed OR addition building.
We post new plumbing opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""36C24626B0041_1 10232026.pdf"1165756"file"".pdf""1""2026-10-23T12:04:44.92+00:00""739cd371072f43958f6316f68ac651bb""public""0""public""1438cb548a534b82aa866b95299a9104""0"3"0""9_558-24-160_Durham Piping_Revised Bid Drawings.pdf"23921947"file"".pdf""1""2026-10-23T12:04:44.92+00:00""cfe1f86342ab4763b4d635cf680197a4""public""0""public""77fd81be76ab47c190c90f3c6ac35207""0"2"0""9_558-24-160_Durham Piping_Bid Documents Specs.pdf"15055790"file"".pdf""1""2026-10-23T12:04:44.92+00:00""9af20baf43df4f9b8221f5b9a73e9012""public""0""public""e6bb264231274d65b3fe1d8403d978dd""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 5233db81cb1f410aa29b64697ab6cc04), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.