We'll email you new excavating opportunities in Oklahoma as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Amendment 10/14/26 to extend bid opening date and publish RFI responses.
Construction of Gravesite Expansion and Repair of FCA Deficiencies at Fort Sill National Cemetery in accordance with the Statement of Work (SOW), drawings, and specifications.
CLIN 0001 includes installation of all work as shown in plans and specifications excluding CLIN 0002, CLIN 0003, and Bid Option 1. CLIN 0002 requires contractor to perform an asphalt assessment of all longitudinal and transverse cracks throughout existing cemetery roadways, parking areas, and drives, providing a detailed assessment report with recommended repair methods, performed by a competent person with five or more years' asphalt repair experience. CLIN 0003 is purchase and delivery of pre-placed crypts only. General construction work encompasses preparation and demolition of existing structures, furnishing all labor, materials, equipment and services to complete the project including: installation of multiple pre-placed double-depth burial crypts and oversized crypts across multiple sections (Sections 6-9) with proper underdrains, grid monuments, and gravesite infrastructure; construction of three new columbarium courts (C, E, H) with precast concrete niche units, stone veneer, limestone caps, and aluminum niche covers; roadway extensions and asphalt paving with concrete curbing and valley gutters; extensive storm drain pipe and cleanout installations using HDPE corrugated dual-wall pipe with proper bedding and flared end sections; concrete pavement repairs to assembly areas and committal shelters with subgrade remediation and compaction; landscape and irrigation installation within burial sections; renovation and repair work to administrative building, committal shelters, and support facilities including stone masonry repairs, window replacement, service seal installation, and metal siding repairs; all surveying, layout, and as-built documentation; phased construction coordinating with active cemetery operations including burial activities.
"US""22134""QUANTICO""VA""USA""CENTRALIZED CONTRACTING DIVISION""5105 RUSSELL ROAD""P07_WD_OK20260043.pdf"1774476"file"".pdf""1""2026-10-14T20:58:18.305+00:00""b1ba6fe086684d49bd22e27040c357ab""public""0""public""06e31c5525b94866a6135b3a09de399c""0"33"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_5 of 11.pdf"9512506"file"".pdf""1""2026-10-14T20:58:18.305+00:00""d06701a65cd047349aee624a1a2fc195""public""0""public""5086fd3d32fb4b1c9563f737f085fd93""0"32"0""S06_Fort Sill NC_920CM3006_Combined Specifications_Rev 01.pdf"10723567"file"".pdf""1""2026-10-14T20:58:18.305+00:00""57825927b83045549b7e7ffd5be1a028""public""0""public""a35bab0bcd724d5e95a41aee2f79be64""0"31"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_10 of 11.pdf"10115596"file"".pdf""1""2026-10-14T20:58:18.305+00:00""9850959139964d329971e40ee29f6163""public""0""public""8e5171c2cabd4ee48f5cf2ce9967322b""0"30"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_4 of 11.pdf"9366113"file"".pdf""1""2026-10-14T20:58:18.305+00:00""c70ddf717f304088a8319cc40c5d63b2""public""0""public""ecfd869e54e44a25a92915adc1262a76""0"29"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_3 of 11.pdf"7231735"file"".pdf""1""2026-10-14T20:58:18.305+00:00""e9512b8c753347b294f6a947668aae8a""public""0""public""d42aaa8223b24edda3e83bb7f2953e14""0"28"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_11 of 11.pdf"8061960"file"".pdf""1""2026-10-14T20:58:18.305+00:00""180fd158fbd44228b4da0ecb845b4e60""public""0""public""ce733c574f1e4a2e8aa15f1f0c96e848""0"27"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_9 of 11.pdf"8462350"file"".pdf""1""2026-10-14T20:58:18.305+00:00""c3a0d429a36c4dfaaf2135c5e4f75b3d""public""0""public""c4e5044d04f442bf8caee7d27b2412c8""0"26"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_6 of 11.pdf"10235036"file"".pdf""1""2026-10-14T20:58:18.305+00:00""129fb075b87f436dbb19ac8c1131867c""public""0""public""8506cd62a1c44bc7830f3068653f26a4""0"25"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_8 of 11.pdf"7099343"file"".pdf""1""2026-10-14T20:58:18.305+00:00""578f6f2deac040a8b945ba1891c488d5""public""0""public""a9a15234196e4e778a9e6ad686b68851""0"24"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_1 of 11.pdf"6404049"file"".pdf""1""2026-10-14T20:58:18.305+00:00""15ae28418bf74beb9243bc2d75fc9f58""public""0""public""afc867d972e9419f87818e1f76add815""0"23"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_2 of 11.pdf"5508828"file"".pdf""1""2026-10-14T20:58:18.305+00:00""2d2d0ee43b584ca2af0ff60df0d720d0""public""0""public""89032f28974a486d9844a1716b4cd31a""0"22"0""S06_Fort Sill NC_920CM3006_Plan Set_Reduced_Amend 01_7 of 11.pdf"4233490"file"".pdf""1""2026-10-14T20:58:18.305+00:00""e81541859a9a42cfa03a614695faac02""public""0""public""f049df615b2441c293bb5cf55b929f08""0"21"0""S05_Prebid RFI_26B0030 Fort Sill_Gravesite Expansion and FCA.pdf"410160"file"".pdf""1""2026-10-14T20:58:18.305+00:00""3aa9b55a70c94a3da107f29ce22b73fa""public""0""public""09baf1da86264a72a8d7addb48f116c6""0"20"0""S06_36C78626B0030 0002.pdf"92872"file"".pdf""1""2026-10-14T20:58:18.305+00:00""ae04c8e165d04f1698371ee1414ff373""public""0""public""3b40c8405afd4b8bb21e0cfb73e45f9e""0"19"0""S02_Attachment-14_IFB Contractor Cost Estimate Worksheet.xlsx"14261"file"".xlsx""1""2026-10-14T20:58:18.305+00:00""4ee973f033e541e9943188b5d0858e2d""public""0""public""06b813b3acb44661982eab09f1012fcb""0"18"0""S06_36C78626B0030 0001.pdf"11765069"file"".pdf""1""2026-10-08T12:53:59.83+00:00""b42227f7e6cd451b97b32468677bd687""public""0""public""6367cbb4ad0a48e8905e671a86910baa""0"17"0""S04_Ft Sill_Site Visit Attendance.pdf"4707943"file"".pdf""1""2026-10-08T12:53:59.83+00:00""f03c593432634cee99fa16e5c6ed6d31""public""0""public""4c11209fa80f403e822c5346b5bba2e9""0"16"0""P07_WD_OK20260023.pdf"1671663"file"".pdf""1""2026-09-09T12:14:05.686+00:00""3288a48e29ec4a15944b9f71416b4feb""public""0""public""9a7c2ae6475a48ddb03abf282f1d0505""0"15"0""S02_Att 8_Fort Sill NC 920CM3006 Plan Set Reduced 6 of 11.pdf"10272438"file"".pdf""1""2026-09-09T12:14:05.686+00:00""ff21264d785740a59a31c7a277afc554""public""0""public""de04a91ef328451aa94c93fdbb95fe90""0"14"0""S02_Att 6_Fort Sill NC 920CM3006 Plan Set Reduced 4 of 11.pdf"10222847"file"".pdf""1""2026-09-09T12:14:05.686+00:00""699566a83b4140639b9e5b645012b9e8""public""0""public""8fd2af5b857c4da88aa4d1bff8ffec4c""0"13"0""S02_Att 7_Fort Sill NC 920CM3006 Plan Set Reduced 5 of 11.pdf"10131384"file"".pdf""1""2026-09-09T12:14:05.686+00:00""da141552446044189a6464003cbdcd7b""public""0""public""cfb30885544047b0961e35af8879cfe3""0"12"0""S02_Att 12_Fort Sill NC 920CM3006 Plan Set Reduced 10 of 11.pdf"9787999"file"".pdf""1""2026-09-09T12:14:05.686+00:00""ca5b0910e6c64a6b9f880794e0c4d380""public""0""public""db444199839943fdadaf50763786609c""0"11"0""S02_Att 11_Fort Sill NC 920CM3006 Plan Set Reduced 9 of 11.pdf"7424092"file"".pdf""1""2026-09-09T12:14:05.686+00:00""bd754cd7a0544ca7af3242ecf7b97ebb""public""0""public""76ab1b9dfdd040d1bf99467541274680""0"10"0""S02_Att 13_Fort Sill NC 920CM3006 Plan Set Reduced 11 of 11.pdf"9197278"file"".pdf""1""2026-09-09T12:14:05.686+00:00""d49ab007455342e0b5cd70902d590171""public""0""public""eb4054279fc74263b374308d071e48f7""0"9"0""S02_Att 10_Fort Sill NC 920CM3006 Plan Set Reduced 8 of 11.pdf"8791618"file"".pdf""1""2026-09-09T12:14:05.686+00:00""c4d492de142c40d5a17e7423474e36d3""public""0""public""02b58be187544a5ca010c457db45bdd5""0"8"0""S02_Att 2_Fort Sill NC 920CM3006 Combined Specifications.pdf"8135739"file"".pdf""1""2026-09-09T12:14:05.686+00:00""8300457c7e8442a5a1bb300c74e20df0""public""0""public""d922e1e222a84539ab0b8084bb1ac919""0"7"0""S02_Att 4_Fort Sill NC 920CM3006 Plan Set Reduced 2 of 11.pdf"7437573"file"".pdf""1""2026-09-09T12:14:05.686+00:00""01f1e8b73b8248278ef22db11e37e9d8""public""0""public""1a236f40293d411db66e35aa9be5cea7""0"6"0""S02_Att 3_Fort Sill NC 920CM3006 Plan Set Reduced 1 of 11.pdf"5291360"file"".pdf""1""2026-09-09T12:14:05.686+00:00""9f7748cdbb9a453e8353d9917a9730d2""public""0""public""f50732de693c4ff987b7971e97e1333e""0"5"0""S02_Att 5_Fort Sill NC 920CM3006 Plan Set Reduced 3 of 11.pdf"6502326"file"".pdf""1""2026-09-09T12:14:05.686+00:00""94db69038cad4db7945b2722e77e28ec""public""0""public""79ccfe8ccb304f19be5095149e2fc423""0"4"0""S02_Att 9_Fort Sill NC 920CM3006 Plan Set Reduced 7 of 11.pdf"4101418"file"".pdf""1""2026-09-09T12:14:05.686+00:00""c951f46aa58a40938555dce16fabb994""public""0""public""36dac75b73e34090adf8343f646e192d""0"3"0""S02_Att 1_920CM3006 Fort Sill NC IFB SOW_Final.pdf"379575"file"".pdf""1""2026-09-09T12:14:05.686+00:00""12528f7bc39c430ba91581b78170ca82""public""0""public""48ada3d46c2b4c20b6c0f8bfad87e1fa""0"2"0""S02_36C78626B0030_Final.pdf"584670"file"".pdf""1""2026-09-09T12:14:05.686+00:00""b7d4ff14adf54aa78a8b586094584678""public""0""public""967ba9c9c8074aa8bdd1751ff32d221e""0"1"0"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 4f4f07a191e14bbe86eaf3aa6cb5bd7d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.