AMENDMENT 001 is issued to provide answers to submitted questions. See the attachment section of this notice.
This requirement is set aside for small businesses.
One site visit shall be held for this requirement; please contact the contracting officer (primary point of contact) and contract specialist (secondary point of contact) to request attendance. See the solicitation attachment for more information.
Offers are due by email to the contracting officer (primary point of contact) and contract specialist (secondary point of contact) by the due date on this announcement. Emails shall contain the solicitation number in the title of the email.
The contractor shall perform the required specified tasks and all implied tasks required by the Statement of Work.
Please see the attachments to this announcement for the solicitation and supporting documents.
Questions are due to the contracting officer and contract specialist by 10 September 2026. Questions submitted after this date may not be answered prior to the closing of this solicitation.
The contractor shall provide all personnel, equipment, and materials to perform the galley renovations. The work includes: safely disconnecting plumbing, gas, and electrical from fixtures designated for removal; demolishing and removing existing cabinetry, countertops, sink, griddle, and freezer; furnishing and installing new commercial-grade base, tall, and wall cabinetry, durable stainless-steel countertops, a commercial-grade sink and faucet assembly, a new combination griddle/burner unit, and a new commercial-grade freezer unit; protecting and integrating the existing refrigerator unit; performing final site cleanup and legal disposal of all construction debris; and complying with lead-safe work practices for drywall containing lead. The contractor must also provide shop drawings, appliance specifications, and material samples for government approval.
We post new general contractors opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""94501""ALAMEDA""CA""USA""CG ISLAND, BUILDING 42""Station Lake Tahoe Galley Renovation Questions and Answers.pdf"216528"file"".pdf""1""2026-09-12T05:06:36.423+00:00""fd0ebc885b2a4eb0b79f67dd8392532f""public""0""public""ec8aae9ed5654d208139442158a605fc""0"4"0""Construction Solicitation Galley Renovation.pdf"671774"file"".pdf""1""2026-08-31T20:34:29.983+00:00""3153c7d3d0e7444aaba7a122b2fb49f3""public""0""public""0f170d68ad114630b29ba970458186ae""0"3"0""26-092 USCG Station Lake Tahoe - Survey Report.pdf"2249397"file"".pdf""1""2026-08-31T20:34:29.983+00:00""b91bb32760a544cd89e16e6090f24259""public""0""public""0ba07ac0888446d39c9e5148e418dc5b""0"2"0""BASE ACCESS FORM.xlsx"21781"file"".xlsx""1""2026-08-31T20:34:29.983+00:00""c2a143289fde48878ecc1f7a04a8e725""public""0""public""8d86869377634bc98bdc7229ef723039""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 4ce12e1fee8e46578a38fb4b5729e36f), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.