Amendment 1 (24 Aug 26) Updates: "Presolicitation"
This MACH1_AOI opportunity is updated with the following changes:
Previous Versions published as a "Special Notice" (Posting Type) were deleted & replaced with this "Presolicitation" posting
"Related Notice" block now reflects the associated MACH1_Parent Notice [FA8903-OT-MACH1]
Attached PDF was edited to remove Engineered Tensile Fabric Structures (ETF) as a mandatory material and allows for non-traditional construction methods. The submission deadline has been extended.
See updated Attachment PDF: MACH1_AOI_FA890326OT002_MWDK_Amend_1_24 Aug 26
Original AOI Posting (11 Aug 2026) "Special Notice"
This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a.
The 772nd Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Cetner (AFCEC), is seeking an innovative commercial partner to execute this project in two distinct Lines of Effort (LOE); Design & Planning (LOE 1), Physical Construction (LOE 2) for the scope defined as follows. The Government intends to upgrade both the Joint Base San Antonio (JBSA) - Lackland West facilities and the Chapman Training Annex, beginning with the Chapman Annex. The total 341st Training Squadron requirement is to house and train 850 dogs across two sites to support the Defense Military Working Dog (MWD) Kennel Program.
This AOI seeks an innovative partner to rapidly develop a comprehensive, site-specific, and constructible design package using non-traditional construction approach built on Engineered Tensile Facilities (ETF) as the baseline structure. This initial Line of Effort (LOE 1) Design & Planning: will focus exclusively on delivering a mature design and a firm, executable plan for the full construction effort.The primary goal of LOE 1 is to produce a detailed, site-specific plan that enables a rapid and predictable approach for LOE 2: Physical Construction.
See attachment PDF: MACH1_AOI_FA890326OT002_MWDK_10 Aug 26
We post new general contractors opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"78236-9861""JBSA LACKLAND""TX""USA""CP 210 395 8776""2261 HUGHES AVE BLDG 171 STE 163""MACH1_AOI_FA890326OT002_MWDK_Amend_1_24 Aug 26.pdf"245894"file"".pdf""1""2026-08-24T22:53:31.451+00:00""8adf7a5694464b5ab808a3eb392b7832""public""0""public""af2c867d65c34259880f677ea4213ac3""0"2"0""MACH1_AOI_FA890326OT002_MWDK_10 Aug 26.pdf"242325"file"".pdf""1""2026-08-24T22:53:31.451+00:00""6e59a345663e4e4cab315a8ba82d5363""public""0""public""916be68c490f4fa7b4bdac479b98c799""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 4bdf208253584d88827e144e51b9ecbb), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.