Read the notice and its 7 attached documents and pull out the scope, the deadlines and what you have to submit.
Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project as described throughout the contract documents – including the drawings and specifications.
The purpose of this project is to provide steam service to Green House Homes 201 and 202. Existing gas fired hot water boilers (2 per home) and gas fired steam generators (1 per home) are to be replaced. Steam-to-Hot Water heat exchangers will replace gas fired hot water boilers and clean steam duct mounted humidifiers will replace exiting setup.
Both homes are anticipated to be occupied during work. Construction will be phased to reduce impact on residents and FHCC operations, see sheet MS100.
Removal and installation of duct mounted humidifier will be a one-day event (per home) due to AHU shutdown. All material will be required to be on site, and interior of ductwork immediately near installation will be clean and free of debris prior to AHU being returned to service.
We post new hvac opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""53214""MILWAUKEE""WI""USA""GREAT LAKES ACQUISITION CENTER""115 S 84TH ST""36C25226B0036_1 (2).docx"273861"file"".docx""1""2026-08-25T19:07:42.678+00:00""e1957f3a308e4e7daacec559a9a7d127""public""0""public""a016fe7498f34d5eaace9f6bd5777ddb""0"13"0""S02 - 556-25-102_Greenhouse_Homes_Steam_100CD Dwgs 26SEP25_PART 2.pdf"14714473"file"".pdf""1""2026-08-25T19:07:42.678+00:00""c25623e7924f49a5b610075c26b38e8e""public""0""public""83bb885b931448919e80928c7041f408""0"12"0""S02 - 556-25-102_Greenhouse_Homes_Steam_100CD Specs 26SEP25.pdf"3387949"file"".pdf""1""2026-08-25T19:07:42.678+00:00""f01eb62cac404f6293c3e27086abc8d2""public""0""public""9518dca6b5b847719e09808f4637134b""0"10"0""S02 - Wage Determination IL20260008 Mod02 05182026.pdf"93820"file"".pdf""1""2026-08-25T19:07:42.678+00:00""d0c9c1785c994614946b2b641990e005""public""0""public""b75dfcb57a39462bbb51fab178220fde""0"8"0""S02 - Bldg. 3 Site Map.pdf"235203"file"".pdf""1""2026-08-25T19:07:42.678+00:00""587dc5855ac34b5d9f06da47b2929e3e""public""0""public""20a5a389f7994e5d97a2d9e08a56c523""0"6"0""S02 - VA Notice of Limitations on Subcontracting.docx"16053"file"".docx""1""2026-08-25T19:07:42.678+00:00""ca7227b3f1e84a5ab740080b22a88a04""public""0""public""ebab4aa7bf2f48708c6bb82abc4af1e3""0"4"0""S02 - 556-25-102_Greenhouse_Homes_Steam_100CD Dwgs 26SEP25_PART 1.pdf"8474889"file"".pdf""1""2026-08-25T19:07:42.678+00:00""307ee1707bc94c489480c1d6f454e5e7""public""0""public""29b3b55aaf8f44b09a16031f49195647""0"2"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 4b3a74a27dd3457383cc5a95151d7c32), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.