ANTICIPATED AWARD DATE/START OF CARPET INSTALLATION SERVICES SHALL BE CONTINGENT ON AVAILABILTY OF A FUNDED AWARD.
EXPECT AWARD & START DATE TO BE November OF 2026. ****************** PERIOD OF PERFORMANCE IS NINETY (90) CALENDAR DAYS FROM DATE OF A SIGNED GOVERNMENT CONTRACT AWARD.
** NO PRE-AWARD SITE WALK IS PLANNED OR REQUIRED AS THIS PROJECT IS A SIMPLE REMOVAL OF EXISTING CARPET AND FURNISH AND INSTALL NEW CARPET SERVICE CONTRACT (SIMPLE FURNISH AND INSTALLATION PROJECT)**
CONTRACTORS QUOTE/PROPOSAL SHALL BE VALID FOR 120 CALENDAR DAYS FROM DATE OF SOLICIATION CLOSING DATE LISTED WITHIN SAM.
CLIN: 0001
Schedule of Supplies/Services
Qty 01
Unit: PROJECT
Unit Price
Total Amount
REMOVAL/DISPOSAL OF OLD CARPET AND INSTALLATION OF NEW CARPET INSTALLATION AS SPECIFIED IN ATTACHED SOW, SPECS AND MAP- Base Ketchikan ****ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS. SEE ATTACHED MAP. AGAIN= ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS.
1 EACH : $
** Total $**
Total Contract Value
$
*The Contractor shall also include regular and overtime rates for any other labor categories proposed.
Preparation of this quote is completely voluntary and shall be submitted to the United States Government by date specified herein .
****This shall be awarded to the LOWEST PRICED/ TECHNICALLY ACCEPTABLE/ QUALIFIED CONTRACTOR AND IS CONTINGENT ON THE UNITED STATES COAST GUARD SECURING PROPER FUNDING.
1.0 General
1.1 Background
The United States Coast Guard (USCG) is procuring NEW CARPET INSTALLATION Services & REMOVAL/DISPOSAL OF CURRENT CARPET as described within this PWS for USCG Base Ketchikan, AK. Base Ketchikan serves as the single touch point for the support of Coast Guard operations within the 17th Coast Guard District, standing shoulder-to-shoulder with our operational partners to ensure the delivery of professional, responsive, and cost-effective services to the American public.
1.2 Scope
The Contractor shall provide the proper mix of personnel, management, supervision, materials, supplies, equipment, tools, transportation, and other items or services (except utilities and limited facilities as defined in section 12.0) necessary to accomplish the CARPET REMOVAL AND INSTALLATION OF BRAND NEW CARPET services required by this PWS. The efforts to be accomplished under this contract are scalable in nature to include other tasks, services, or locations within scope, as required. The contractor is encouraged to assess the work requirements and recommend revisions that would provide beneficial savings to the contractor and the government.
1.2.1 REMOVE EXISTING CARPET AND INSTALL BRAND NEW CARPETcleaning Base Ketchikan for: Administrative building 3RD FLOOR ONLY.
a. GENERAL REQUIREMENTS:
b. Services to Be Preformed: Carpet REMOVAL AND INSTALLATION OF NEW CARPET is required at each location specified below as determined by the Contracting Officer’s Representative (COR). The Contractor shall provide all necessary labor, equipment, and supplies required to perform these services. All cleaning procedures and treatment shall be accomplished in accordance with the manufacturer’s directions and/or listed specifications and industry standards applicable to the Professional Cleaning & Restoration Industry.
1.2.2 Location of Work Performance:
Administrative building 3rd Floor – SEE ATTACHED MAP FOR: sqft
2.3 Work Hours: All carpet REMOVAL AND NEW installation services shall be performed between the hours of 0700 and 1630 AKST. Monday through Friday or by appointment scheduled in advance. The Contractor shall notify the designated Contracting Officer Representative of any deviations to the previously agreed upon appointment and schedule an alternate appointment carpet cleaning. No keys to Government facilities are to be provided to Contractors under any circumstances.
**OLD CARPET SHALL BE REMOVED AND BRAND NEW CARPET SHALL BE INSTALLED ** IN according to industry standard to protect the investment as part of a maintenance program that will preserve the appearance and extend the life of the carpet. The contractor will develop a cost-effective cleaning strategy, plan, and schedule.
MAPS OF AREAS WITH CARPET TO BE REMOVED AND NEW CARPET INSTALLED- SEE ATTACHMENT
***LAST DAY TO SUBMIT ANY QUESTIONS FOR THIS REQUIRMENT IS: FRIDAY, 25 SEPTEMBER 2026. ALL QUESTIONS AND GOVERNMENT ANSWERS SHALL BE POSTED HERE AS WELL BEFORE THE OFFICIAL CLOSING DATE.
The contractor shall provide all necessary personnel, management, supervision, materials, supplies, equipment, tools, and transportation to remove the existing carpet and install brand new carpet on the entire third floor/deck, including all hallways, of the administrative building at USCG Base Ketchikan, Alaska. The contractor is also responsible for replacing all rubber cove base, securing a rental roll-off dumpster, and ensuring it is emptied throughout the contract duration. All work shall be performed in accordance with manufacturer's directions and industry standards, between the hours of 0700 and 1630 AKST, Monday through Friday or by appointment.
We post new flooring opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"MASTERSOWSPECSCARPETRQMT-KETCHIKAN.docx"54798"file"".docx""1""2026-10-06T20:40:58.21+00:00""e3ed190655a24dac901cbb092a3226c5""public""0""public""30a82ddf671d4732a8296019dcd2d9b2""0"12"0""SERVICECONTRACTACT.pdf"417735"file"".pdf""1""2026-10-06T20:40:58.21+00:00""199e440038b0411689b9d0c48e97c9f3""public""0""public""6be5e650b100456989c95e78362ae619""0"11"0""CRI 104 - STANDARD For INSTALLATION of COMMERCIAL CARPET-more-mr-STAMOS_2.pdf"874934"file"".pdf""1""2026-09-28T20:57:55.009+00:00""6bdf017fbdc04b25bf1372d299a1e752""public""0""public""bbde9507be4e446ab08e78b923562ec3""0"10"0""CRI 104 - STANDARD For INSTALLATION of COMMERCIAL CARPET-more-mr-STAMOS.pdf"55887"file"".pdf""1""2026-09-28T20:57:55.009+00:00""f48fd1ae37554f07a0db972fbb432cdd""public""0""public""bae41066310741d68d7fd688b293e48f""0"8"0""QUESTIONS AND ANSWERS USCG KETCHIKAN NEW CARPET RQMT-FINAL25SEPT2026.docx"14668"file"".docx""1""2026-09-25T21:54:56.764+00:00""9346b6ccf38d4ef9b46c3265ec71eabe""public""0""public""8126ec1a4957408ba6685d173dc28990""0"7"0""CARPET-COLOR-SAMPLE.pdf"348469"file"".pdf""1""2026-09-22T20:04:12.426+00:00""803f540e4eef4bf5a76dd2f9560f6c13""public""0""public""f109618c71f54c3b9e1fb63b2998ff6a""0"5"0""QUESTIONS AND ANSWERS USCG KETCHIKAN NEW CARPET RQMT.docx"22128"file"".docx""1""2026-09-22T20:04:12.426+00:00""7ac0081b082b4dbea056dc71146d5948""public""0""public""b5eecdf169f84fafb89434cddfaf210d""0"4"0""COVERPAGEINFO.docx"16463"file"".docx""1""2026-09-21T17:15:07.345+00:00""c4bfbf652ad04990ae600e2f69b737b2""public""0""public""b49a572d05af495a8e459e9720dec9b0""0"3"0""Base LayoutMAPSNEWCARPETENTIRETHIRDDECKONLY.docx"4867626"file"".docx""1""2026-09-21T17:15:07.345+00:00""5b14f007a7c0494eb3545ec2ff27067d""public""0""public""54ef27a3fb7d4d61bb358c33dc64417d""0"2"0""CARPETRQMTUSCGKETCHIKAN.SOWSPECS.docx"58066"file"".docx""1""2026-09-21T17:15:07.345+00:00""edb46451334c4098a5dcfb409c899e71""public""0""public""97377e2b3fc7468aa6cb7a741f111d5b""0"1"0"Most Alaska work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 43e2fbad446d46f88da41035c6414255), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.