End of Amendment 36C24827Q0036 0001.
The contractor furnishes all labor, materials, tools and supervision to procure two new TAA-compliant laser or LED projectors with interchangeable zoom lenses, coordinate a pre-installation site walk, remove and palletize the two Christie WU7K-M projectors for turnover to the VA, install and align the new projectors with signal, control and power cabling, fully integrate and program the projectors with the existing Crestron control system, perform system testing for power, inputs, geometry, warp/blend, lens control and color, and provide as-built documentation, warranties, test results and end-user demonstration within 60 days of award during after-hours windows.
We post new electrical opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""33637""TAMPA""FL""USA""8875 HIDDEN RIVER PARKWAY""36C24827Q0036 0001.docx"17640"file"".docx""1""2026-10-21T18:24:25.992+00:00""a7b7c0a38b91477b925889097af874b5""public""0""public""ac1332dba61546028accc9dd0a335136""0"5"0""ATTACHMENT C PAST PERFORMANCE QUESTIONNAIRE.docx"30538"file"".docx""1""2026-10-07T14:29:55.023+00:00""02400433af29452ba8b2881bb71e93ed""public""0""public""4c4f787231e04f699801638d575fba43""0"4"0""ATTACHMENT B TECHNICAL CAPABILITY WORKSHEET.docx"22685"file"".docx""1""2026-10-07T14:29:55.023+00:00""4d7dba51990a4c42b1019c674e299014""public""0""public""3740469994834e7994e9301145472216""0"3"0""ATTACHMENT A REQUEST FOR INFORMATION.docx"18748"file"".docx""1""2026-10-07T14:29:55.023+00:00""b5e14e1a12db4d75a804bf64637afa05""public""0""public""51786aef3d3741ada3c172c924231b73""0"2"0""36C24827Q0036_1.docx"87398"file"".docx""1""2026-10-07T14:29:55.023+00:00""8ac5eda9db2f49f6bc620efbe2cb2ad3""public""0""public""eb8dfba086b44387aaf0869e999115db""0"1"0"Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 43d9456e4a764099850b922f87444c96), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.