This solicitation is for Pine Ridge Job Corps Wind Turbine Maintenance at USDA FOREST SERVICE PINE RIDGE JCC, HWY 385-15710, CHADRON NE 69337.
The contract is subject to Service Contract Act WD 2015-5355.
Submission of questions are due 1700 PM Eastern Time on 15 September 2026. An Amendment answering all pertinent questions will be issued by 1700 PM Eastern Time on 16 September 2026. Offers are dueno later than 1700 PM Eastern Time on 18
September 2026.
Quoters are allowed to submit only one quote.
The following documents are included as attachments to this solicitation.
Attachment 1 Statement of WorkWind Turbine
Attachment 2 Schedule of Items
Attachment 3 Service Contract Act WD 2015-5355
Quotes will be at least be Evaluated on the following to points.
The contractor must be qualified to service Northwind turbine systems and operate independently without direct government
supervision. This needs to be proven by submission of industry accepted certificates. Will also be evaluated on, Attachment 1 Statement of Work Wind Turbine.
B) Ability to meet the requirements listed: The Northwind 100 is a utility-scale wind turbine model, and all major systems drive train, blades, generators, gearboxes, hydraulics, and control systems which means they are capable of performing maintenance on this type of turbine.
The contractor shall furnish all labor, transportation, and supervision necessary to perform work required for the daily monitoring and routine maintenance of the Wind Turbine at Pine Ridge Job Corps. This includes inspecting, cleaning, and lubricating all rotating parts on an annual basis. All services shall be performed in accordance with manufacturer specifications and applicable safety standards. The contract includes a base period and four option years with one base year item and four optional year items, each priced lump sum for yearly preventative maintenance.
We post new fuel & energy opportunities in Nebraska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""69337""CHADRON""NE""USA""PINE RIDGE CIVILIAN CONSERVATN CTR""15710 HIGHWAY 385""1282A726Q0072 Wind Turbine Pine Ridge.pdf"6067815"file"".pdf""1""2026-09-10T22:26:44.269+00:00""d42736dca4b54745ac0ee193fb3ed05b""public""0""public""6c6ba33dff734a2caaaec6b62883f3ae""0"7"0""Attachment 1 Statement of WorkWind Turbine.pdf"1378320"file"".pdf""1""2026-09-10T22:26:44.269+00:00""6ee4dcadbdaa4ebd89d2ac40d8a7bea7""public""0""public""c2067cab3f804de69bc4894b7e0a99ba""0"5"0""Attachment 2 Schedule of Items.pdf"539555"file"".pdf""1""2026-09-10T22:26:44.269+00:00""896dcfa1e1004ca8a571c5a72dd7e4ad""public""0""public""298f88d5f9e74bfea5a63cdc26c47b0d""0"3"0""Attachment 3 Service Contract Act WD 2015-5355.pdf"9438320"file"".pdf""1""2026-09-10T22:26:44.269+00:00""afcd5c0e267549939429b6dc21dce2c2""public""0""public""4d4ca0f93d4d4d5ab2b9b5add7dab56a""0"2"0"Most Nebraska work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 43a8400f526443098b728ac60e44174a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.