On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following:
This SF30 must be acknowledged and submitted with your proposal.
This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Work includes all labor, equipment, supplies, testing, inspections, and incidentals for Dripstone and Discovery Trail infrastructure repairs and safety upgrades. Specific work includes: structural stabilization of tunnel entrances and exits using rockbolts, geosynthetic mesh, and shotcrete; demolition and removal of existing supports; masonry repairs and tuckpointing; installation of instrumentation and monitoring equipment; replacement of airlock and security door systems; replacement of suspended ceiling systems and associated ductwork; replacement of lighting and electrical distribution systems; replacement of mine phone systems and components; installation of safety handrails; and surface sinkhole filling with water diversion berms. All work must conform to attached drawings and specifications, with construction limited to areas noted on drawings and conducted between 6:00 pm and 8:00 am only.
We post new architecture and design opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""20250""WASHINGTON""DC""USA""PROCUREMENT & PROPERTY SERVICES""1400 INDEPENDENCE AVE SW, MS-1138""C05m Attachment 11 Golder 1240BH26R0013.pdf"1003643"file"".pdf""1""2026-08-12T15:14:24.67+00:00""4c746a0cea5e4cc882ff99e01e80f00d""public""0""public""e1202e8eb9d7484dbceb2feaa0d38a34""0"14"0""C05 SF30 1240BH26R0013-0001.pdf"86410"file"".pdf""1""2026-08-12T15:14:24.67+00:00""b5659242f7d14b84abeed0a4fd15e2a7""public""0""public""7b7e30b9f2ab4bf49b1c2e39643f6cd5""0"13"0""C04 SF1442 1240BH26R0013.pdf"328784"file"".pdf""1""2026-08-04T18:42:56.664+00:00""bb3bd3bd7f794d6ab96aff25e906fd8a""public""0""public""4f6865fcaeb649c9afb760d8f4c88007""0"12"0""C04b Attachment 2 Specs BSC LH 1240BH26R0013.pdf"1243387"file"".pdf""1""2026-08-04T18:42:56.664+00:00""87c897a262c6421b8c51524b7c49c541""public""0""public""15e6a50176ca4dcfaeeb270ce7c856fd""0"11"0""C04d Attachment 4 Dwgs BSC Handrails 1240BH26R0013.pdf"90054670"file"".pdf""1""2026-08-04T18:42:56.664+00:00""d1282a898837495f80a0800b7f6e7624""public""0""public""1640f53977914b7bbff08232b3327fd7""0"10"0""C04e Attachment 5 Env Assessment 1240BH26R0013.pdf"8226199"file"".pdf""1""2026-08-04T18:42:56.664+00:00""bf29e03631b44c8986dab4319562d7a1""public""0""public""3ce2a10ae51e4cdeb157a91c5eb3717d""0"9"0""C04g Attachment 7 Recommendations1240BH26R0013.pdf"4116026"file"".pdf""1""2026-08-04T18:42:56.664+00:00""6092d5a8480f49f7babd95e80716181f""public""0""public""4569360ee12746e6bc66d5348880e58a""0"8"0""C04c Attachment 3 Drawings BSC 1240BH26R0013.pdf"4077991"file"".pdf""1""2026-08-04T18:42:56.664+00:00""4d9ed47ec31a4afaa578214f5fcb9a89""public""0""public""c81776559a464becbd6d6a46f08fb421""0"7"0""C04k Attachment 11 General Decisio AR20260022 05182026.pdf"1556262"file"".pdf""1""2026-08-04T18:42:56.664+00:00""68ee0f297dc24e5cbff85ed8842a1c3d""public""0""public""7b0ede028ffe4ae0bc5cb41ad08f7ffa""0"6"0""C04i Attachment 9 Site Visit 1240BH26R0013.docx"127981"file"".docx""1""2026-08-04T18:42:56.664+00:00""a573e9913f654efc8d36dd7594f51b82""public""0""public""7a304f2ce8ce4fd09a14a2558961a1a6""0"5"0""C04a Attachment 1 SOW BSC 1240BH26R0013.docx"74455"file"".docx""1""2026-08-04T18:42:56.664+00:00""8a0eba4d13b34b8f9772a6b405ece405""public""0""public""306d91a4dc024323a738245d976ce9f2""0"4"0""C04h Attachment 8 Estim Quant 1240BH26R0013.xlsx"34192"file"".xlsx""1""2026-08-04T18:42:56.664+00:00""33e48b039b1e42dc929b36f12c81fa98""public""0""public""eb0a2d2c08034a61820e7f16307e8a3f""0"3"0""C04j Attachment 10 RFI Form 1240BH26R0013.docx"30162"file"".docx""1""2026-08-04T18:42:56.664+00:00""a44be4b03fc84e1cbd6e4e39b279d2ac""public""0""public""142783d116954cf48d07c95e27a3cd07""0"2"0""C04f Attachment 6 SOI 1240BH26R0013.xlsx"13608"file"".xlsx""1""2026-08-04T18:42:56.664+00:00""7418440fd80a47d69c8586abb6f16c5c""public""0""public""dfe942e322af40e5919de3b46e208ef6""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 42d2afa84427481497083f2202798590), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.