The Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD) on behalf of the Occupational Safety and Health Administration (OSHA) intends to issue a single contract for Architect-Engineer (A/E) design and project phasing services for a consolidation/renovation of OSHA exterior suites in the Frances Perkins Building in Washington, D.C.
This solicitation is issued and will be evaluated under the authority of Federal Acquisition Regulation (FAR) Subpart 36.102-Architect-Engineer Services, as deviated. This is a total small business set-aside under NAICS 541310-Architectural Services.
Please review the solicitation and attachments carefully to ensure a complete and timely response.
The A/E contractor shall provide all personnel, equipment, tools, materials, supervision, other items and non-personal services necessary to perform architect-engineer design and project phasing services for the OSHA consolidation/renovation project in the Frances Perkins Building. The project scope includes design through Construction Documentation Phase (CD) and project phasing services for the consolidation/renovation of the exterior suites along corridors N3100, N3600, and N3700, totaling approximately 37,418 square feet. Tasks include conducting information gathering/programming, producing design documents for Architectural, Interior Design, Furniture, Mechanical, Electrical, Plumbing, and Fire & Life Safety design, and developing a detailed Phasing Plan that sequences work by zones with minimal disruption to occupied areas, including swing-space strategies and phased plans to vacate and reoccupy spaces. The A/E shall also provide Construction Procurement Assistance and Management Services as optional services.
We post new architecture and design opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20170""HERNDON""VA""USA""381 ELDEN STREET""SUITE 4000""SOL_140D0426R0111_OSHA_AE.pdf"457578"file"".pdf""1""2026-09-10T11:23:08.702+00:00""3bf2bedd0f7c4c09bc7815b37e653108""public""0""public""8bd1436b09ad48a19b3e8755b13bffa1""0"4"0""Attachment_A_-_SOW_OSHA_Renovation_Design___Phasing.pdf"2354895"file"".pdf""1""2026-09-10T11:23:08.702+00:00""6eb88163536e4092b0b08cbbb6110469""public""0""public""723fcfd863674cbbb8e6aa141a944107""0"3"0""Attachment_C_-_Past_Performance_Questionnaire.pdf"178354"file"".pdf""1""2026-09-10T11:23:08.702+00:00""92a63cef43ac4a47a956703364dc440b""public""0""public""42d34364e1b243ad8795442e3da16956""0"2"0""Attachment_B_-_OSHA_Reno_Design_Q_A.xlsx"11314"file"".xlsx""1""2026-09-10T11:23:08.702+00:00""7ae1bbc4f48e45ec9b8c83ca34e68059""public""0""public""df2a642fc60d4a3ba550a5f827fe6861""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 3f05a72d210947adb3d399d64c6209b5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.