Revised attachment, Pre-Proposal Site Visit - CSOG Expansion R1.
Pre-Proposal Site Visit times updated from Central time to Easter time.
Procure contractor services for renovating and expanding the current office space into a neighboring office space. The contractor shall be responsible for:
Furniture, Flooring, Wall Base, and Office Partitions.
Electrical Work
Communication / Data Cabling and Connections
Mechanical Work
Composite Cable and Conduit (Optional)
Ceiling Tile (Optional)
Conference Table (Optional)
AMD01 – Added solicitation instructions within attachment, HC102826R0058 RFP CSOG AMD01.
Added attachment - Pre-Proposal Site Visit - CSOG Expansion
Offer due date is a hard close. No extensions will be granted. RFP questions are due 14-SEP-26 at 2:00 PM CST.
The contractor shall renovate Building 11, Section 13 by removing existing furniture, office partitions, flooring, and wall base; installing new office partitions, flooring, wall base, and furniture; performing electrical work including new branch circuits and connections; installing communication/data cabling (Category 6A); performing mechanical modifications including new VAV terminal boxes and split system A/C units; installing STC-45 and STC-50 rated walls; installing new motion sensors; and providing project close-out documentation. Optional tasks include replacing composite cable in conduit, installing new ceiling tiles, and replacing a conference table with a power-integrated model.
We post new general contractors opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"62225-5406""SCOTT AFB""IL""USA""BUILDING 3600""2300 EAST DRIVE""Pre-Proposal Site Visit - CSOG Expansion R1.docx"27116"file"".docx""1""2026-08-26T12:18:09.197+00:00""4b3bd8ffbc86410fa4c6a3282847a469""public""0""public""9d189de2b9bf4991802ff0e672562463""0"23"0""HC102826R0058 RFP CSOG AMD01.pdf"421398"file"".pdf""1""2026-08-25T15:48:30.433+00:00""44f155acebd8477baf11d448025c860f""public""0""public""3d8136652ae54de68619eaa5a452c217""0"22"0""Pre-Proposal Site Visit - CSOG Expansion.docx"27119"file"".docx""1""2026-08-21T12:41:33.286+00:00""e7c69652c83b421781155918102d2969""public""2026-08-26T12:18:09.197+00:00""1""public""0fb1bcee85db4cea932791b8c9c1008a""0"21"0""2026-08-26T12:18:09.197+00:00""HC102826R0058 Attachment List.docx"15791"file"".docx""1""2026-08-20T13:48:12.856+00:00""bac061576c3e43ffb57442553a4e9f7d""public""0""public""15ea0d23580e4a7782be52222863e668""0"20"0""HC102826R0058 RFP CSOG.pdf"1301622"file"".pdf""1""2026-08-20T13:48:12.856+00:00""d2749202830240589e8726e6178c03d9""public""0""public""b59ff806a15a4abb8d60a14d53dbe49d""0"18"0""Attachment 1 CLIN Pricing Worksheet.xlsx"80950"file"".xlsx""1""2026-08-20T13:48:12.856+00:00""5f1c3cb8506349fb8f2d2e46e365269a""public""0""public""ba822563f8c749f5bc1884827689c82e""0"16"0""Attachment 2 - Mission-Essential Contractor Services.docx"29881"file"".docx""1""2026-08-19T20:11:13.15+00:00""7cb783d6592c4f388101692175fbce60""private""0""controlled""026c1ccd50b94da9a63fdddb88380ffb""1"11"0""Attachment 3 - Request for Past Performance References.docx"35346"file"".docx""1""2026-08-19T20:11:13.15+00:00""db0fe7becbcb48bd8d8094b2cc42999b""private""0""controlled""7bbcfdd0e3d24a6dbc283e10292f79b1""1"10"0""Attachment 4 - Initial QASP.docx"52640"file"".docx""1""2026-08-19T20:11:13.15+00:00""79324febe239434abccc042250674ab7""private""0""controlled""947212b9192b4356af9d2ad2ddb62eb0""1"9"0""Appendix A Concept Plan.pdf"3992936"file"".pdf""1""2026-08-19T20:11:13.15+00:00""fbd5b3c8f6524a799f11e18b0e5d81bf""private""0""controlled""95e68833db9f4d32a62319a8c4c667ad""1"8"0""Appendix B DISA Labeling Standard.pdf"460362"file"".pdf""1""2026-08-19T20:11:13.15+00:00""f7453a95afe347959f0f2ac8fcbcbbab""private""0""controlled""dc67634b01ec47268ce636a81f155237""1"7"0""Appendix C DISA Electrical Safety Program.pdf"1923590"file"".pdf""1""2026-08-19T20:11:13.15+00:00""226ba36847a54aebabe43731247ee511""private""0""controlled""ecde4804c03f410d9ed39e9877952373""1"6"0""Appendix D DISAI 240-110-33 Physical Security.pdf"190829"file"".pdf""1""2026-08-19T20:11:13.15+00:00""8aebd9fb49a441219ccc99e97acd4cc0""private""0""controlled""2de739a9a43e44b4878325c940b09f6d""1"5"0""Appendix E SEC Inventory Spreadsheet.xlsx"42006"file"".xlsx""1""2026-08-19T20:11:13.15+00:00""88c59e6887a8410cbc8be5f3c2235bf5""private""0""controlled""36aa358c84484e1fa2164645756abc67""1"4"0""Appendix F Non-Disclosure Agreement for Contractor Personnel.docx"34697"file"".docx""1""2026-08-19T20:11:13.15+00:00""3cb2fc81ae014da6968baa7528c8bc87""private""0""controlled""ccc0def54a004d84ba2fc19f6ae07fdf""1"3"0""Enclosure 1 - Alternate 2 - CSOG Expansion Conference Room.pdf"200022"file"".pdf""1""2026-08-19T20:11:13.15+00:00""e3472566a0d24765aa9bb3c28dc82414""private""0""controlled""0124341220ee4985b861e391a3213bd7""1"2"0""Enclosure 2 - CDRLs CSOG.pdf"11127083"file"".pdf""1""2026-08-19T20:11:13.15+00:00""021cb1c4be2b48e8a02b926239d7ce7a""private""0""controlled""7c838cd4293b47baa94be2702ef3437a""1"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 3e69ca687adb4573927a04594ae37c92), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.