The U.S. Army Corps of Engineers (USACE), Baltimore District will be completing maintenance dredging in the upper half of the Wicomico River, Wicomico County, MD. Material will be placed at an existing upland placement site near the river named Sharps Point located in Salisbury, MD. The Magnitude of Construction is $4,000,000.00 to $8,000,000.00. The construction duration will be approximately 120 calendar days from Notice to Proceed.The scope includes using a hydraulic dredge and pipeline in the upper portion of the Wicomico River to remove material to its authorized depth of 14 feet.
Approximately 250,000 cubic yards of material consisting of silts, sand, clays, mixed shell, gravel and other materials will be dredged and placed at the Sharps Point site. Minor construction of two weir boxes will also occur at the placement site prior to dredging operations.
The scope includes using a hydraulic dredge and pipeline in the upper portion of the Wicomico River to remove material to its authorized depth of 14 feet. Approximately 250,000 cubic yards of material consisting of silts, sand, clays, mixed shell, gravel and other materials will be dredged and placed at the Sharps Point site. Minor construction of two weir boxes will also occur at the placement site prior to dredging operations.
We post new excavating opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"21201-2526""BALTIMORE""MD""USA""RESOURCE MANAGEMENT OFFICE""2 HOPKINS PLAZA""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DR27BA002¬iceType=Presolicitation"0"link""1""2026-10-06T17:43:56.275+00:00""39f980579eb9494c9d23f5340931b7ea""public""0""PIEE Solicitation Module Link for W912DR27BA002""public""e40d5f00d60a488a8d909ea0a8dc8644""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-06T17:43:56.275+00:00""d5a03e841665467f93329fda53b4362e""public""0""Web Based Training for the PIEE Solicitation Module""public""3d7aba8e7ea24ab893bf127efefd133e""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-06T17:43:56.275+00:00""12895858a0f74c9b9059960111054946""public""0""Registration Instructions for the PIEE Solicitation Module""public""5206fa9c6ef8438f922bf94677476891""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-10-06T17:43:56.275+00:00""49c9a4e1a97a469dbda1b448d9f483a4""public""0""Department of Defense Procurement Toolbox""public""75bb9d44599148a184b3f814e390d0f6""0"1"0"Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 354a91828fd442888a52a3b4c5c20bef), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.