Contractor shall provide annual inspection, testing, certification, and a preventative maintenance (PM) program for the medical piped gas and vacuum systems to include correction of deficiences and for out-of-cycle (unscheduled) inspection and testing.
The contractor shall provide all labor, supervision, ASSE-certified personnel, calibrated test equipment, tools, materials, consumables, transportation, and reporting necessary to perform an annual NFPA 99 inspection, testing, and certification of the medical gas and vacuum systems, and to perform preventive maintenance on source and distribution equipment. The work covers oxygen, medical air, medical-surgical vacuum, nitrogen, carbon dioxide, nitrous oxide, and waste anesthetic gas disposal (WAGD) systems. Specific tasks include full testing of 117 master alarm panels, 157 area alarm panels, 514 zone valves, 4,279 patient terminals (outlets/inlets), and 4,279 DISS disconnects; source supply equipment evaluation; cross-connection testing; bulk oxygen and manifold system inspection; and medical air quality certification. The contractor must also correct deficiencies identified during inspections, provide 24/7/365 emergency response for failures affecting patient care, and perform out-of-cycle inspection and certification as needed. The initial baseline certification must be completed within 30 calendar days of award.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""Site Visit Sign In Sheet.pdf"46043"file"".pdf""1""2026-10-01T12:48:31.033+00:00""82cd4ecf78994c9491cc30214e0f8c0b""public""0""public""c494bfaf4905415fa14add6ab6bc0fc3""0"5"0""S02 36C25726Q0888 0002.pdf"178555"file"".pdf""1""2026-09-24T13:51:54.647+00:00""171a546806f04620acf459bbdb312c46""public""0""public""07c51752d1d44a56ab7ef37c0bdbf292""0"4"0""Maintenance Inspection Report.pdf"4137927"file"".pdf""1""2026-09-24T12:06:46.079+00:00""0e15cefb77764d70bfb6e06ae62c4c15""public""0""public""d70de56866814d74b59cde9fc8c1a2d4""0"3"0""S02 36C25726Q0888 0001.pdf"333274"file"".pdf""1""2026-09-24T12:06:46.079+00:00""471d9be3d4e64132a4f14ff34cc7bbd0""public""0""public""b4ef070a383547ada21c1a4f5dab4867""0"2"0""S02 36C25726Q0888.pdf"551040"file"".pdf""1""2026-09-11T14:43:01.412+00:00""c7efc846c65142ccb003ee878c26b723""public""0""public""6adb07bff65e4902bc7bd12747d20b60""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 316832c40be243f994183ca8447ed2f1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.