Light RFP
← All government bids
Federal · SAM.gov · Alburgh, VT

Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of Entry (LPOE), Alburg, Vermont

Due Jul 27, 2026·28 days left·RenovationView official posting ↗
Issuing agency
Federal Agency
Method
Solicitation
Category
Construction · NAICS 236220
PIN
47PB5126R0008
Location
Alburgh, VT
Posted
Jun 18, 2026
Takeaways by LightRFP AI

Generate a quick AI overview of this bid, pulled from its details and the attached documents.

Description

Amendment 007 has been uploaded as an attachment on 6/18/2026

Amendment 006 has been uploaded as an attachment on 6/15/2026

Amendment 005 has been uploaded as an attachment on 6/2/2026

Amendment 004 has been uploaded as an attachment on 5/29/2026

Amendment 003 has been uploaded as an attachment on 5/21/2026

Amendment 002 has been uploaded as an attachment on 5/15/2026

Amendment 001 has been uploaded as an attachment on 5/12/2026

The General Services Administration (GSA), Public Buildings Service (PBS) Office of Acquisition Management intends to hire a construction contractor for a Repair and Alteration (R&A) and Driveway Extension project at the Land Port of Entry (LPOE) in Alburg Springs, VT. The Driveway Extension will be included in the project as a contract option. The Government will utilize the Design-Bid-Build (DBB) delivery method. The main goal for this project is to provide a renovated LPOE with the addition of a driveway extension for CBP and GSA that will meet each agency’s requirements and allow for efficient operations. The R&A portion is needed to modernize the port, correct port deficiencies, and bring the LPOE up to current standards based on the Program of Requirements provided by GSA and CBP. The project will be completed in a way that will incorporate the existing Historic Facility, which is listed in the National Register of Historic Places. Major elements of the project will include gates and guardrails for primary passenger and commercial lanes, a new officer inspection booth, interior upgrades, such as all new floorplan, and new and upgraded MEP and Security. The driveway portion will address the security challenges at the LPOE with local traffic entering and exiting their residential properties directly in front of the port. The project shall adhere to the GSA PBS Core Building Standards and the Customs and Border Protection (CBP) 2023 Land Port of Entry Design Standard. The port will be fully closed during all construction activities.

To access the controlled documents, you must submit the signed Attachment 5- Proprietary Information Agreement and the official request by clicking on each controlled document to proceed.

Pre-Proposal Conference/Site Visit

Date: May 6th, 2026

Time: 12:00PM EST

Location: 303 Alburgh Springs Road, Alburgh, VT

Please be advised of the upcoming pre-proposal conference and site visit. To attend, you must register by May 1, 2026, by 2:00PM EST by filling out the google sheet below. Register here: https://docs.google.com/forms/d/e/1FAIpQLSf3uZuFUEpvoKk03s5_KtUGmTHDRn4xClhRqdCEikvZYRuMTw/viewform?usp=publish-editor

If you are having any issues with this link, please email Emily.jackson@gsa.gov

Documents46
25. Amendment 47PB5126R0008 0007 2026 06 18.pdfPDF
3. Agreement Rev 2 2026 06 18.pdfPDF
21. Amendment 47PB5126R0008 0006 2026 06 15.pdfPDF
6. WD VT20250027 2026 05 18.pdfPDF
2. SF1442 Rev 1 dated 2026 06 15.pdfPDF
1. Solicitation Rev 1_2026 06 11.pdfPDF
20. Amendment 47PB5126R0008 0005 2026 06 02.pdfPDF
19. Amendment 47PB5126R0008 0004 2026 05 29.pdfPDF
16. Alburg Springs - Port Signage SOW-ASR 01.pdfPDF
15. Amendment 47PB5126R0008 0003 2026 05 21.pdfPDF
14. Amendment 47PB5126R0008 0002 2026 05 15.pdfPDF
Alburg Springs LPOE Conference-Site Visit meeting minutes_Rev 1 Amendment 0002_ 2026 05 15.pdfPDF
13. Amendment 47PB5126R0008 0001 2026 05 12.pdfPDF
Alburg Springs LPOE Conference-Site Visit meeting minutes 2026 05 06.pdfPDF
BSF - Booth Supply Fan Cut Sheet.pdfPDF
PUH - Propeller Unit Heater Cutsheet.pdfPDF
AS - Air Separator Cutsheet.pdfPDF
SG and EG - Security Grille Cutsheet.pdfPDF
BT - Buffer Tank Cutsheet.pdfPDF
GFT - Glycol Feed Tank Cutsheet.pdfPDF
ET - Expansion Tank Cutsheet.pdfPDF
SG - Supply Grille Cutsheet.pdfPDF
RG - Return Grille Cutsheet.pdfPDF
FT - Fin Tube Cutsheet.pdfPDF
GI and GR - Gravity Intake and Relief Cutsheet.pdfPDF
DH - Duct Mounted Humidifier Cutsheet.pdfPDF
FB - Filter Box Cutsheet.pdfPDF
RP - Vertical Radiant Panel Cutsheet.pdfPDF
RP - Horizontal Radiant Panel Cutsheet.pdfPDF
EFM - Electric Floor Mat Cutsheet.pdfPDF
GSHP - Ground Source Heat Pump Cutsheet.pdfPDF
HP and CU - Heat Pump Mini-Split Cutsheet.pdfPDF
EH - Electric Wall Heater Cutsheet.pdfPDF
ERV - Energy Recovery Ventilator Cutsheet.pdfPDF
CP and GP - Pump Cutsheets.pdfPDF
KH - Kitchen Hood Cutsheet.pdfPDF
FCU - Fan Coil Unit Cutsheet.pdfPDF
EHC - Electric Heating Coil Cutsheet.pdfPDF
HUM - Steam Humidifier Cutsheet.pdfPDF
EF - Exhaust Fan Cutsheet.pdfPDF
L - Louver Cutsheet.pdfPDF
4. GSA527-21a 2026 04 15.pdfPDF
7. PBS PPQ 2026 04 15.pdfPDF
8. Tips on Preparing a Subcontracting Plan 2026 04 15.pdfPDF
9. Model Subcontracting Plan 2026 04 15.docxDOCX
5. Proprietary Information Agreement 2026 04 15.docxDOCX

Contact

Name
Emily Jackson
Address
Alburgh, VT 05440
Full source recordfrom SAM.gov
Type
Solicitation
Title
Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of Entry (LPOE), Alburg, Vermont
Active
Yes
Base Type
Solicitation
Notice Id
2b203913f3374fcb88a7d2c612709b32
Naics Code
236220
Posted Date
Jun 18, 2026
Resource Links
https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9527e076770d4bad95c450dd74d05b7b/download?fn=25.%20Amendment%2047PB5126R0008%200007%202026%2006%2018.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9368132060a5401b8db9b55e0db3098f/download?fn=3.%20Agreement%20Rev%202%202026%2006%2018.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fa75dc52f8ac4d2eacd140e0030f651d/download?fn=21.%20Amendment%2047PB5126R0008%200006%202026%2006%2015.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3a2b0cbb901a451a810ab4bb97bfbd45/download?fn=6.%20WD%20VT20250027%202026%2005%2018.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/723ad8afb30f4c7ab87d31cf2a86d0b9/download?fn=2.%20SF1442%20Rev%201%20dated%202026%2006%2015.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4bf576f6b3de4952b13c14f8f4e30a19/download?fn=1.%20Solicitation%20Rev%201_2026%2006%2011.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7a6746168d1a48d58cb1be07200d805b/download?fn=20.%20Amendment%2047PB5126R0008%200005%202026%2006%2002.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f760ccef025b4dcda5a51c64d33147d9/download?fn=19.%20Amendment%2047PB5126R0008%200004%202026%2005%2029.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c9991a3bb3864cc681c793175e278b5f/download?fn=16.%20Alburg%20Springs%20-%20Port%20Signage%20SOW-ASR%2001.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c9c4885faea241c99960ecefa8987069/download?fn=15.%20Amendment%2047PB5126R0008%200003%202026%2005%2021.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/90baa329f7ce4c0fb637fd2ed4145f54/download?fn=14.%20Amendment%2047PB5126R0008%200002%202026%2005%2015.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/178774666e584e819e2531ef6b200043/download?fn=Alburg%20Springs%20LPOE%20Conference-Site%20Visit%20meeting%20minutes_Rev%201%20Amendment%200002_%202026%2005%2015.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b900bab70be9483b8e0efef8bb5272ca/download?fn=13.%20Amendment%2047PB5126R0008%200001%202026%2005%2012.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c0690fab40f641f3bd2a44eab831f323/download?fn=Alburg%20Springs%20LPOE%20Conference-Site%20Visit%20meeting%20minutes%202026%2005%2006.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d2477ee811dd414f808eaf194561ed21/download?fn=BSF%20-%20Booth%20Supply%20Fan%20Cut%20Sheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7f010f46b60b453e903102146ff4bf35/download?fn=PUH%20-%20Propeller%20Unit%20Heater%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f4307aa5b45f4d2d88e75d59907bdbe0/download?fn=AS%20-%20Air%20Separator%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d10d2b71315e4b649d2243660c2f307b/download?fn=SG%20and%20EG%20-%20Security%20Grille%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6dc89dc3ca6849b688378c981f3c745f/download?fn=BT%20-%20Buffer%20Tank%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/64f4b6ff969448eaa6d6c31d05071165/download?fn=GFT%20-%20Glycol%20Feed%20Tank%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/49259eb465974f5baaade6ffb64e05f2/download?fn=ET%20-%20Expansion%20Tank%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2d56aa7b9f0447dd94e20ae2bf2e61e4/download?fn=SG%20-%20Supply%20Grille%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1cb0e08f8a7744588be750dc45b99b30/download?fn=RG%20-%20Return%20Grille%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/555b5320a832416eae7c3672b1024c23/download?fn=FT%20-%20Fin%20Tube%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7fdf773554404ad383963732f0f58280/download?fn=GI%20and%20GR%20-%20Gravity%20Intake%20and%20Relief%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b0922700fe9a4fe1a00f5d2aff6afd8d/download?fn=DH%20-%20Duct%20Mounted%20Humidifier%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7dca3dc2246a4a8580660783fb9e07db/download?fn=FB%20-%20Filter%20Box%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/092bdb4c285843318464fbf7d2c563d7/download?fn=RP%20-%20Vertical%20Radiant%20Panel%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d7cdf7c1803a41d1af695bb2b5165490/download?fn=RP%20-%20Horizontal%20Radiant%20Panel%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bee55828235744ffa56ec3437d599916/download?fn=EFM%20-%20Electric%20Floor%20Mat%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3e780ba330204c0aaec9733c1930e01e/download?fn=GSHP%20-%20Ground%20Source%20Heat%20Pump%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/481b2e3e4d9f42a794b609f4a3629ea0/download?fn=HP%20and%20CU%20-%20Heat%20Pump%20Mini-Split%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3610823b370745808171e407ff61af16/download?fn=EH%20-%20Electric%20Wall%20Heater%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b58efea347534bfebfa7479692045db9/download?fn=ERV%20-%20Energy%20Recovery%20Ventilator%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25b865af763f47c397a5f23a5dbb1661/download?fn=CP%20and%20GP%20-%20Pump%20Cutsheets.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/db7901ab3aad402986490663af322629/download?fn=KH%20-%20Kitchen%20Hood%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0cd8cdcc467d4712962fc82277845f05/download?fn=FCU%20-%20Fan%20Coil%20Unit%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/031f8abd8fdf4e8fba082d7dcb57ee46/download?fn=EHC%20-%20Electric%20Heating%20Coil%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/58f25e443ccf4204898806de91ab29b4/download?fn=HUM%20-%20Steam%20Humidifier%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/98fd87298fa643ffbe9dd31d14b162f2/download?fn=EF%20-%20Exhaust%20Fan%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/46ac7f3b0f2948a9a6e2f76091aab850/download?fn=L%20-%20Louver%20Cutsheet.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0bf4186cfdbd409195e641d2181a3055/download?fn=4.%20GSA527-21a%202026%2004%2015.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/388d532ef4ca45c992a5e083841cca02/download?fn=7.%20PBS%20PPQ%202026%2004%2015.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4e15ed348f8845db962baea249d7ee8c/download?fn=8.%20Tips%20on%20Preparing%20a%20Subcontracting%20Plan%202026%2004%2015.pdf, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8176186cea1e49a793fb6da8c912eaea/download?fn=9.%20Model%20Subcontracting%20Plan%202026%2004%2015.docx, https://sam.gov/api/prod/opps/v3/opportunities/resources/files/88c20973e2c54aed95e336bfcc7e271e/download?fn=5.%20Proprietary%20Information%20Agreement%202026%2004%2015.docx
Point Of Contact
Type
primary
Email
emily.jackson@gsa.gov
Full Name
Emily Jackson
Type
secondary
Email
molly.lewis@gsa.gov
Full Name
Molly Lewis
Description Text
Amendment 007 has been uploaded as an attachment on 6/18/2026 Amendment 006 has been uploaded as an attachment on 6/15/2026 Amendment 005 has been uploaded as an attachment on 6/2/2026 Amendment 004 has been uploaded as an attachment on 5/29/2026 Amendment 003 has been uploaded as an attachment on 5/21/2026 Amendment 002 has been uploaded as an attachment on 5/15/2026 Amendment 001 has been uploaded as an attachment on 5/12/2026 The General Services Administration (GSA), Public Buildings Service (PBS) Office of Acquisition Management intends to hire a construction contractor for a Repair and Alteration (R&A) and Driveway Extension project at the Land Port of Entry (LPOE) in Alburg Springs, VT. The Driveway Extension will be included in the project as a contract option. The Government will utilize the Design-Bid-Build (DBB) delivery method. The main goal for this project is to provide a renovated LPOE with the addition of a driveway extension for CBP and GSA that will meet each agency’s requirements and allow for efficient operations. The R&A portion is needed to modernize the port, correct port deficiencies, and bring the LPOE up to current standards based on the Program of Requirements provided by GSA and CBP. The project will be completed in a way that will incorporate the existing Historic Facility, which is listed in the National Register of Historic Places. Major elements of the project will include gates and guardrails for primary passenger and commercial lanes, a new officer inspection booth, interior upgrades, such as all new floorplan, and new and upgraded MEP and Security. The driveway portion will address the security challenges at the LPOE with local traffic entering and exiting their residential properties directly in front of the port. The project shall adhere to the GSA PBS Core Building Standards and the Customs and Border Protection (CBP) 2023 Land Port of Entry Design Standard. The port will be fully closed during all construction activities. To access the controlled documents, you must submit the signed Attachment 5- Proprietary Information Agreement and the official request by clicking on each controlled document to proceed. Pre-Proposal Conference/Site Visit Date: May 6th, 2026 Time: 12:00PM EST Location: 303 Alburgh Springs Road, Alburgh, VT Please be advised of the upcoming pre-proposal conference and site visit. To attend, you must register by May 1, 2026, by 2:00PM EST by filling out the google sheet below. Register here: https://docs.google.com/forms/d/e/1FAIpQLSf3uZuFUEpvoKk03s5_KtUGmTHDRn4xClhRqdCEikvZYRuMTw/viewform?usp=publish-editor If you are having any issues with this link, please email Emily.jackson@gsa.gov
Response Dead Line
Jul 27, 2026
Place Of Performance
Zip
05440
City
Code
850
Name
Alburgh
State
Code
VT
Name
Vermont
Country
Code
USA
Name
UNITED STATES
Solicitation Number
47PB5126R0008

Source: SAM.gov (notice 2b203913f3374fcb88a7d2c612709b32), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.