Teresa Thurston Replacement OSS
The contractor shall install approximately 40 linear feet of 4-inch PVC solid sewer pipe, one underground two-way cleanout, a 1,100-gallon traffic-rated concrete single-compartment settling tank with effluent filter, a 1,250-gallon traffic-rated concrete pump tank with effluent pump and controls, approximately 200 linear feet of 2-inch Sch 40 PVC effluent transport line with manifold, approximately 120 linear feet of 3-inch Sch 40 PVC sleeve, and 192 linear feet of gravel trench drainfield with four 1.5-inch Sch 40 PVC laterals. The contractor must also inspect the existing septic tank and, if unsatisfactory, install a new 1,125-gallon concrete septic tank and abandon the existing tank. Work includes mobilization, excavation, backfill, resurfacing, and all necessary permits.
We post new waste management opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20852""Rockville""MD""US""The Reyes Building 801Thompson Avenue, Suite 400""98121""SEATTLE""WA""USA""2201 6TH AVENUE""MAIL STOP RX-24""6-US DOL WA20260093 Dated 5-18-2026.pdf"42584"file"".pdf""1""2026-08-21T10:38:58.341+00:00""d455e41d1baf432f8cc08718fa8f11b5""public""0""public""a8fb74c3f493462083c818553cc6d79e""0"8"0""5-Measurement and Payment Thurston.docx"19827"file"".docx""1""2026-08-21T10:38:58.341+00:00""3c084ef632644769b498007d2390a0f6""public""0""public""1e3e0c65c5944390bcc3d41bee97a1c9""0"7"0""4-Location_Aerial.pdf"830458"file"".pdf""1""2026-08-21T10:38:58.341+00:00""72e2010e6f52486bbb3d6b9281346f90""public""0""public""c372a4e1a04f424fa9f4f48aa9350d3f""0"6"0""3-OSS Design.pdf"1539490"file"".pdf""1""2026-08-21T10:38:58.341+00:00""e906732ec9d143158cde2234d8590764""public""0""public""2262ef5c0062430a82024f6264c0a7bb""0"5"0""2-Technical Specifications.pdf"249258"file"".pdf""1""2026-08-21T10:38:58.341+00:00""e19adac9839742cd8438e646e850a9f2""public""0""public""d223161c832b45c8b791557c0f40a0f1""0"4"0""1-Statement of Work.docx"37742"file"".docx""1""2026-08-21T10:38:58.341+00:00""a6fbc6a9d49d4ce8ba6cf0886eaa9f18""public""0""public""818905be8bed4801b7ce19b306c92dc3""0"3"0""B01 75H70126Q00033 - Rev.pdf"763801"file"".pdf""1""2026-08-21T10:38:58.341+00:00""30a746f40af944298087543be53bfa42""public""0""public""5513d5a3df514a60a85aa5342fb816ad""0"2"0""A11 Pre-Solicitation SAM Notice.pdf"90497"file"".pdf""1""2026-08-21T10:38:58.341+00:00""0fcce3ea102a486ea8c9aee4f191af59""public""0""public""3c5a2a001d064591bbef8c378566e4df""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 295141ea020b4685b0cd8e82cadf0678), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.