PROJECT TITLE: MISCELLANEOUS PAVING REQUIREMENTS
PROJECT LOCATION: U.S. ARMY DUGWAY PROVING GROUND, UTAH
DESCRIPTION: THIS IS AN INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), FIRM-FIXED PRICE REQUIREMENT FOR MISCELLANEOUS PAVING CONSTRUCTION SERVICES. ANY WORK REQUIRED BY THE GOVERNMENT SHALL BE ACCOMPLISHED BY THE ISSUANCE OF TASK ORDERS BY THE CONTRACTING OFFICER AGAINST THE PROPOSED CONTRACT. THE PERIOD OF PERFORMANCE (POP) FOR THIS REQUIREMENT IS A TWELVE (12) MONTH BASE PERIOD AND FOUR (4) ONE (1) YEAR OPTION PERIODS OF ONE YEAR EACH. THE ESTIMATED MAGNITUDE IS UP TO $5,000,000.00 ANNUALLY.
THE NAICS FOR THIS ACQUISITION IS 237310, HIGHWAY, STREET, AND BRIDGE CONSTRUCTION (SMALL BUSINESS SIZE STANDARD $45 MILLION).
PER FEDERAL ACQUISITION REGULATION (FAR) 19.108, THIS REQUIREMENT IS RESTRICTED TO 8(A) FIRMS AUTHORIZED BY THE SMALL BUSINESS ADMINISTRATION'S UTAH DISTRICT OFFICE TO PERFORM WITHIN THE DISTRICT'S GEOGRAPHICAL REGION.
Offers shall be received prior to the closing date and time identified on SF 1442 (18 November 2026 by 1300 MDT) to the following address:
Contract Specialist: Nicholas J. Rowton; Email Address: nicholas.j.rowton.civ@army.mil
Contracting Officer: Jim Keetch; Email Address: Alfred.j.keetch.civ@army.mil
Note: Please include Bid Submission and solicitation number W911S6-27-B-A001 in the subject line of the email. Example Subject Reference: Bid Submission W911S6-27-B-A001 DPG Horizontal Construction Paving
Bid Opening will be Wednesday 18 November 2026 promptly at 1300 MDT at Dugway Proving Ground Building 5330 Valdez Circle conference room 1201, no bids will be accepted or considered after that time.
Site Visit: The Government will hold a virtual site visit only.
Bidders are required to submit a completed SF 1442, including the acknowledgement of all amendments in Block 19.
SF 1442 cannot be accepted without being signed. The SF 1442 must be completed in full by the bidder, to include the Name and Title of the Person Authorized to sign in Block 20a, an original signature in Block 20b, and the Bid Date in Block 20c. Bids cannot be accepted and will be declared non-responsive without a valid signature in Block 20b.
The final total bid price(s) from Technical Exhibit 01 must be annotated on the appropriate CLINs of Section B of the solicitation.
Refer to Section L for additional details
Perform construction and repair of surfaced areas, including asphalt and cement concrete pavements, gravel and earth surfaced areas, roadways, parking areas, sidewalks, curbs, yards and bridges, along with associated structures and appurtenances. Also perform related relocation and repair of utility distribution systems affected by the work, including water and sewer piping and fire hydrants, plus dust suppression, traffic control and quality control testing as required by each delivery order.
We post new fencing opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"84022-5000""DUGWAY""UT""USA""KO DIRECTORATE OF CONTRACTIN""5330 VALDEZ CIRCLE""1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf"6685546"file"".pdf""1""2026-10-14T18:43:22.13+00:00""21ce9d485f0d4fe990f6820bab9c2c07""public""0""public""29cd8eca10524c18836b77876253f403""0"32"0""Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf"452434"file"".pdf""1""2026-10-14T18:43:22.13+00:00""67558e3c4bb6482e921fe87e8cc6991c""public""0""public""c559e67dc58240dc89f2b2d486d4aadb""0"31"0""Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx"13907850"file"".pptx""1""2026-10-14T18:43:22.13+00:00""e043e07d17b54963be0ed0395255a1b8""public""0""public""e11c133cd19d4243ada4b16c5249015f""0"30"0""DPG_Paved_Roads_2026.pdf"697867"file"".pdf""1""2026-10-14T18:43:22.13+00:00""3ee6abad29184f3784a10c9f78eb6491""public""0""public""60efb7f231d84d8894927696072bc5ab""0"29"0""TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx"210932"file"".xlsx""1""2026-10-14T18:43:22.13+00:00""1ac65cdde8be4f71bcedab73f377e581""public""0""public""ef662a20705842d1833b5b08b8a7e420""0"28"0""TE-02 Standard Specification Book Rev 9 June 2025.pdf"1863628"file"".pdf""1""2026-10-14T18:43:22.13+00:00""0215b028cc26478fbc6871dd8cf05602""public""0""public""55a43aefe8934c5aa449e305e2f5fe4d""0"27"0""TE-03 Paving IDIQ Airfield Specifications.pdf"2320514"file"".pdf""1""2026-10-14T18:43:22.13+00:00""3fd90c60c5c7421c9bedb2d966e6ec81""public""0""public""3d1ad3ace84d4352819dcb4483733c0a""0"26"0""TE-04 Standard Drawings.pdf"107029420"file"".pdf""1""2026-10-14T18:43:22.13+00:00""089ac34f64a645b89666a924e5208f18""public""0""public""2419e5d346e241d2b390f3bbc27ff214""0"25"0""TE-05 Materials Manual of Instruction.pdf"4668146"file"".pdf""1""2026-10-14T18:43:22.13+00:00""b67db9f102d34c3e91ac197db1b8a775""public""0""public""3906eaa50f9c46188e28f98d14aef042""0"24"0""TE-06 Min Sampling an Testing.pdf"862520"file"".pdf""1""2026-10-14T18:43:22.13+00:00""ae4228b3d8cb470f9c598cfe8d053bfe""public""0""public""0163bba60168400e8d284db151672324""0"23"0""TE-07 Quality Management Plans 5 June 2025.pdf"1976283"file"".pdf""1""2026-10-14T18:43:22.13+00:00""b801fa2dfd734d98b9bcc94f96f73cab""public""0""public""11f0c58143ad4d02ac599cbb04f73332""0"22"0""TE-08 Work Zones.pdf"421324"file"".pdf""1""2026-10-14T18:43:22.13+00:00""ca7108e52a4143668b810dd4092277f9""public""0""public""2ce1ff52b06d49f8ab8ac9fd9119590d""0"21"0""TE-09 Dust Control Forms 5 June 2025.pdf"637846"file"".pdf""1""2026-10-14T18:43:22.13+00:00""1500203f3f12425a9da511f94fe31b18""public""0""public""00a2cffdeec648109d7e6b26b097863d""0"20"0""TE-09a Fugitive Dust Control Form 01-Crushing.pdf"759179"file"".pdf""1""2026-10-14T18:43:22.13+00:00""4f662e745a2245679b8c1789cd6f7d1f""public""0""public""d776be9379324259a75243bc0e41671d""0"19"0""TE-09b Fugitive Dust Control Form 02-Screening.pdf"749193"file"".pdf""1""2026-10-14T18:43:22.13+00:00""fb289113099743d195bdf5a2914d8867""public""0""public""1c0f6105ffed49499b68a3530bd9b594""0"18"0""TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf"781313"file"".pdf""1""2026-10-14T18:43:22.13+00:00""32aca19f5d1648c2b78096041aa4e9c4""public""0""public""108d8b4ef1c94e1f848358bc003f54eb""0"17"0""TE-09d Fugitive Dust Control Form 04-Hauling.pdf"781926"file"".pdf""1""2026-10-14T18:43:22.13+00:00""f9ebc8f5ab59487f81d4ffc3698e5aed""public""0""public""67b3789239984463bd649c86dc9c3f2a""0"16"0""TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf"789710"file"".pdf""1""2026-10-14T18:43:22.13+00:00""8400190a47a04345be77317224e62058""public""0""public""bc1185c2bc8a4ca6baf7dce428096a4d""0"15"0""TE-09f Fugitive Dust Control Form 06-Backfilling.pdf"795835"file"".pdf""1""2026-10-14T18:43:22.13+00:00""d624c079b9fa4e27af5fa38b6e4ba78b""public""0""public""474f0b2484d049f2ae73abbedd4a6d3f""0"14"0""TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf"783046"file"".pdf""1""2026-10-14T18:43:22.13+00:00""81f72e09356b4404afe6fd68644df879""public""0""public""0da76932645640af8ccb9ce82a9505f2""0"13"0""TE-09i Fugitive Dust Control Form 09-Site Grading.pdf"784815"file"".pdf""1""2026-10-14T18:43:22.13+00:00""3cc2c952d5a544169708bd56ebc602dd""public""0""public""432e8794c6d04bafb984875fe6bec14d""0"12"0""TE-09j Fugitive Dust Control Form 10-Demolition.pdf"785750"file"".pdf""1""2026-10-14T18:43:22.13+00:00""d12e21dc712f459eb7029aaa5a8e7e13""public""0""public""407e06302d02465c9b32d47012229f0b""0"11"0""TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf"767088"file"".pdf""1""2026-10-14T18:43:22.13+00:00""446a10b254454f5fb14f6e7b8ac40175""public""0""public""9abf84be992843028a5c89e1b8190cd0""0"10"0""TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf"766196"file"".pdf""1""2026-10-14T18:43:22.13+00:00""a54741e12f024f6cb4b3b8e1a03fbc4f""public""0""public""48f6c9a7670a47dfada0db149e1bb3dc""0"9"0""TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf"760745"file"".pdf""1""2026-10-14T18:43:22.13+00:00""d0f1a211480549c1b4a93bc20e2deca4""public""0""public""a85277aee3434d0fabd4c9f3e524faad""0"8"0""TE-09n Fugitive Dust Control Form 14-Trenching.pdf"781507"file"".pdf""1""2026-10-14T18:43:22.13+00:00""847c5d3906f3456a883563ea2166087a""public""0""public""0a9fb28119364a0f801d2951bbb556ed""0"7"0""TE-09o Fugitive Dust Control Form 15-Loading.pdf"776608"file"".pdf""1""2026-10-14T18:43:22.13+00:00""2028c2cec6d743279778996dea6a6f4d""public""0""public""8d58624d17c5487da83e07e171363c30""0"6"0""TE-09p Fugitive Dust Control Form 16-Paving.pdf"779523"file"".pdf""1""2026-10-14T18:43:22.13+00:00""9c1d91759f494f26a05b2f9b74600fdb""public""0""public""b8fb1cdcfaa341f9b3b538da74bdf7f3""0"5"0""TE-09q Fugitive Dust Control Form 17-Trackout.pdf"765463"file"".pdf""1""2026-10-14T18:43:22.13+00:00""c8a7a5886e9a459186130debf735ad48""public""0""public""e29873b90d644b258f072a30e7c64229""0"4"0""TE-09r Fugitive Dust Control Form 18-Traffic.pdf"781357"file"".pdf""1""2026-10-14T18:43:22.13+00:00""fc8407f9cfe24ccb89dc1201ad352a24""public""0""public""bf075ff3b2694a7fbc29667d188d97f4""0"3"0""TE-10 Asphalt Slurry Seal.pdf"2105032"file"".pdf""1""2026-10-14T18:43:22.13+00:00""a4177fc2cd0d41f7badd8a4f1f4b0e89""public""0""public""ddda8623d964429d95ee2128222f6fd0""0"2"0""TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf"255555"file"".pdf""1""2026-10-14T18:43:22.13+00:00""8e4b7fc0ab7d4025b67bf26ba2368adc""public""0""public""2bdf56b2dcd044189d845cc5a7a2f0ec""0"1"0"Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 27182172882c402e88b15746dc198ffd), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.