We'll email you new goods & materials opportunities in Illinois as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Fermi National Accelerator Laboratory (FNAL) is building a next generation proton accelerator called the Proton Improve Plan II (PIP-II). FNAL is soliciting proposals for Safety Rupture Disks to protect from overpressure.
Proposals can be submitted directly to the Primary Contact listed on this notice and within the RFP Document. Pricing must be submitted using the Request for Proposal Pricing Sheet, Exhibit F, which is located at the end of the RFP document.
The selected subcontractor shall provide all labor, materials, tools, equipment, and supervision required to manufacture, assemble, inspect, test, package, and deliver 33 cryogenic rupture disk cartridges (30 at a set pressure of 3.1 barg and 3 at 1.75 barg) along with 33 Burst Alert Sensors, in accordance with Specification ED0049129. The disks must be ASME Section VIII Code NB/UD stamped, constructed of Inconel, welded cartridge style, fit 4-inch ASME B16.5 flange connections, and operate in cryogenic helium service within the linear accelerator tunnel at Fermilab in Batavia, Illinois. Deliverables include technical documentation, drawings, a delivery schedule, Certificate of Compliance, Mill/Material Traceability report, and Burst Certification.
"Richland""WA""US""2345 Stevens Drive""60510""Batavia""IL""USA""Kirk Rd. & Pine St.""RFP 387878-DSF.pdf"301531"file"".pdf""1""2026-10-13T03:32:30.107+00:00""7075acd4d8e64e9bafecd92ef4a4aa3d""public""0""public""608b1cd8209c4e94a6458f5481311a4d""0"16"0""A. Specification ED0049129.pdf"794241"file"".pdf""1""2026-10-13T03:32:30.107+00:00""1e0f01932d834b35b9e2bed49a51b0c8""public""0""public""e42e291462ae496fb71d5785bbda81d5""0"15"0""B. FFDG General Terms and Conditions for Supplies (08.2025).pdf"346347"file"".pdf""1""2026-10-13T03:32:30.107+00:00""2c01d9050d504f5a99cbd84dd81c1cdd""public""0""public""ae68996e7a3c42f69b8fce7105100b10""0"14"0""C. PROC-FRM-100_Subcontractor Certs.pdf"482741"file"".pdf""1""2026-10-13T03:32:30.107+00:00""888dc053a787408e8b066c807aa7af4d""public""0""public""cc39069875924009a81ae3c811a66bda""0"13"0""D. PROC-FRM-466_Proposal Certs.pdf"415824"file"".pdf""1""2026-10-13T03:32:30.107+00:00""55a1f8aaabdc4828abfed991dfe7e121""public""0""public""f0f900fc163341e3811868e45d6e935c""0"8"0""E. Compliance With Federal Anti-Discrimination Laws.pdf"284258"file"".pdf""1""2026-10-13T03:32:30.107+00:00""f44eea116acc4daaa9cced542cf11215""public""0""public""7e828b84641a4badb1a864a5322c76b3""0"7"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 225acf0ff8ec42adb8b2ee7f081da461), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.